ML20141B167
| ML20141B167 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 05/01/1997 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Roche M GENERAL PUBLIC UTILITIES CORP. |
| References | |
| NUDOCS 9705150163 | |
| Download: ML20141B167 (3) | |
Text
.
May 1, 1997 Mr. Michael B. Roche Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station P.O. Box 388 1
Forked River, New Jersey 08731
SUBJECT:
REQUALIFICATION PROGRAM INSPECYlON - OYSTER CREEK
Dear Mr. Roche:
In a telephone conversation on April 29,1997, Mr. D. Florek and Mr. S. Ames made arrangements for the NRC to inspect the licensed operator requalification program at the Oyster Creek facility. The inspection is planned for the week of June 16,1997, which coincides with your regularly-scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit
)
their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by June 6,1997.
Mr. Ames has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
The request for requalification examination materialis covered by the Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires on April 30, 2000. The estimated average burden is 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per response, including gathering, copying, and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6, F33, Office of information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Washington, D.C.
f 9 20503.
few iso 022 Il!!IIl!Il!Il,1lll 9705150163 970501 gDR ADOCK 05000219 PDR
1 Mr. Michael B. Roche 2
Thank you for your cooperation in this matter, if you have any questions regarding this inspection, please contact me at (610) 337-5211 or Internet address GWM@NRC. GOV.
Sincerely,
' (
Glenn W. Meyer, Ch f Operator Licensing and Human Performance Branch j
Division of Reactor Safety Docket No. 50-219 cc:
G. Busch, Manager, Site Licensing, Oyster Creek M. Laggart, Manager, Corporate Licensing State of New Jersey S. Ames, Operator Training i
1 4
~__ _= --.. - -..-.
~
4 i
l' Mr. Michael B. Roche 3
Distribution:
}
Region i Docket Room (with concurrences) i Nuclear Safety Information Center (NSIC)
NRC Resident inspector PUBLIC W. Axelson, DRA
}
P. Eselgroth, DRP
{
D. Haverkamp, DRP T. Kenny,DRS C. O'Daniell, DRP W. Dean, OEDO 4
P. Milano, NRR/PD l-3 R. Eaton, NRR/PD 1-3 i
R. Correia, NRR i
D. Taylor, NRR DOCDESK Inspection Program Branch, NRR (IPAS)
D. Florek, Chief Examiner, DRS DRS OL Facility File DRS File (s)
DOCUMENT NAME-
- 0CREQUAL.DF To receive a copy of a ui nent, indicate in the box: 'C" = Copy without attachment / enclosure
'E" = Copy with attachment / enclosure
- N" = No copy 0FFICE F(1f69$ m l
RI/DRS
/
l l
l NAME DUJRG
/
GMEYER o
DATE 04f29/9Y' 06/, /97 f 04/
/97 04/
/97 04/
/97 0FFICIAL RECORD COPY