ML20141A798

From kanterella
Jump to navigation Jump to search
Forwards Revised TSs Re Change on Extension of PPS Surveillance Test Interval to 123 Days.Revision Removes Reference to CE NPSD-576 Located in TS Bases 3/4.3.1 & 3/4.3.2
Date released: 06/03/2020 Download: ML20141A798


Proposed Tech Specs 3/4.3.1 & 3/4.3.2 Requesting Removal of Reference to CE NPSD-576
ML20141A800
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/08/1997
From:
ENTERGY OPERATIONS, INC.
To:
References
Download: ML20141A800 (3)
Forwards Revised TSs Re Change on Extension of PPS Surveillance Test Interval to 123 Days.Revision Removes Reference to CE NPSD-576 Located in TS Bases 3/4.3.1 & 3/4.3.2
ML20141A792
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/08/1997
From: Mims D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20141A792 (3)