Informs That Document CEN-630-P,Rev 1, Repair of 3/4,OD SG Tubes Using Leak Tight Sleeves, Nov 1996 Marked as Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) Section 103(b),as Amended
ML20141A707
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/12/1997
From: Kalman G
NRC (Affiliation Not Assigned)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
TAC-M97292, NUDOCS 9705140428
Download: ML20141A707 (5)


Text

'. ,-

,f %\ UNITED STATES g- .

g j NUCLEAR REGULATORY COMMISSION o E WASHINGTON, D.C. 3086H001

% *..e / May 12, 1997 Mr. C. Randy Hutchinson Vice President, Operations ANO Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801 ,

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2) REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. M97292)

Dear Mr. Hutchinson:

Your application dated November 26, 1996, to amend the ANO-2 Technical Specifications includd an affidavit dated November 19, 1996, from Combustion Engineering Inc. (CE), executed by Ian C. Rickard, requesting us to withhold from public disclosure pursuant to 10 CFR 2.790 a CE document that was part of the application. .The document that was requested to be withheld from public disclosure is identified as CEN-630-P, Rev. 01, " Repair of 3/4" 0.D. Steam Generator Tubes Using Leak Tight Sleeves," November 1996.

You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a. A similar product is manufactured and sold by major pressurized water reactor competitors of Combustion Engineering.
b. Development of this information by Combustion Engineering required tens of thousands of dollars and thousands of manhours of effort.

A competitor would have to undergo similar expense in generating equivalent information.

c. In order to acquire such information, a competitor would also require considerable time and inconvenience to develop the design, development, and installation process for a welded sleeve for
repairing 3/4 inch 0.D. steam generator tubes.
d. The information consists of the design, development, and installation process for a welded sleeve for repairing 3/4 inch 0.D. steam generator tubes, the application of which provides a f competitive economic advantage. The availability of such M information to competitors would enable them to modify their product to better compete with Combustion Engineering, take marketing or other actions to improve their product's position or impair the position of Combustion Engineering's product, and avoid developing similar data and analyses in support of their processes, methods or apparatus.

H00" NRC HE CENTER COPY 9705140428 970512 PDR ADOCK 05000368 P PDR

3 l

. l e.' .In pricing Combustion Engineering's products and services, i significant research, development, engineering, analytical, l' manufacturing, licensing, quality assurance and other' costs and L expenses must be included. The ability of Combustion .

Engineering's competitors to utilize such information without j

similar expenditure of resources may enable them to sell at prices j reflecting significantly lower costs. l l

l f. Use of the information by competitors in the international i

marketplace would increase their ability to market nuclear steam  ;
supply systems by reducing the costs associated with their
technology development. In addition, disclosure would have an j adverse economic impact on Combustion Engineering's potential for obtaining or maintaining foreign licensees.

We have' reviewed your application and the material in accordance with the  !

requirements of 10 CFR 2.790 and, on the basis of your statements, have  ;

determined that the submitted information sought to be withheld contains i proprietary commercial information.  !

Therefore, the version of the submitted information marked as proprietary will

, be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section
103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of

] persons properly and directly concerned to inspect the documents. If the need arises, we may. send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, '

N_ - -

George Kalman, Senior Project Manager Project Directorate IV-1 Division ~of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-368 I

cc: See next_page i

P

e. In pricing Combustion Engineering's products and services, significant research, development, engineering, analytical, manufacturing, licensing, quality assurance and other costs and expenses must be included. The ability of Combustion i Engineering's competitors to utilize such information without i similar expenditure of resources may enable them to sell at prices i reflecting significantly lower costs.
f. Use of the information by competitors in the international marketplace would increase their ability to market nuclear steam supply systems by reducing the costs associated with their technology development. In addition, disclosure would have an adverse economic impact on Combustion Engineering's potential for obtaining or maintaining foreign licensees.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have .

determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should l change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, ORIGINAL SIGNED BY:

George Kalman, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV l Office of Nuclear Reactor Regulation Docket No. 50-368 DISTRIBUTION: See next page l cc: See next page Document Name: AR297292.LTR See Previous Concurrence * ,

0FC PH/PD4-1 LA/PD4-1 D/PD4-1* OGC*

NAME GKdoyin/vw CHawesCl@ WBeckner*

DATE I/k97 d/h/97 4/28/97 5/8/97 COPY YES/NO YES/N0 YES/NO YES/N0 0FFICIAL RECORD COPY

- . . - . . -. .- . .. -- - . . . . = . . . .

l

-l l

4 l

DISTRIBUTION RE: REQUEST FOR WITHHOLDING INFORMATION DATED: L 19 1oo7

' ~~~

Docket File PUBLIC i

- PDIV-1 r/f-JRoe EAdensas (EGA1) ,

WBeckner  :

i

- CHawes-GKalman OGC PGwynn, RIV ,

CGrimes t

4 1

1 1

F J

I i

l

. I j

l l

l

S. j u $

Mr. C.; Randy Hutchinson Entergy Operations, Inc.. , Arkansas Nuclear One, Unit 2-  ;

Cc: j Executive Vice' President Vice President, Operations Support '

& Chief. Operating Officer i Entergy Operations, Inc.

.Entergy Operations, Inc.- -P. O. Box 31995 i

P. O. Box 31995 Jackson, MS 39286-1995  ;

Jackson, MS- 39286-199.-  !

Wise, Carter, Child & Caraway i Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS ~39205. ,

Arkansas Department of Health-  ;

4815 West Markham Street, Slot-30

'Little Rock, AR 72205-3867  ;

Winston & Strawn  :

1400 L Street, N.W. 't Washington, DC 20005-3502 1

Manager, Rockville Nuclear Licensing Framatone Technologies '

1700 Rockville Pike, Suite 525 Rockville, MD 20852 l

Senior Resident Inspector l

-U.S.. Nuclear Regulatory Commission P. 0. Box 310 London, AR 72847 Regional Administrator, Region IV

.~ U.S. Nuclear Regulatory Commission ]

9 611 Ryan Plaza Drive, Suite 400

( Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 t

wM' Y bm