Forwards RAI Re 961126 Request for TSs Change to Allow Tube Sleeving for Ano,Unit 2 SGs
ML20133C988
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/07/1997
From: Salehi K
NRC (Affiliation Not Assigned)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
TAC-M97292, NUDOCS 9701080160
Download: ML20133C988 (4)


Text

. . ~. _ . . _ _ _ _ _

i- MrJC. Randy l Hut'chinson

.. Vice President,rOperations' ANO y Entergy Operations, Inc. Jsnuary 7, 1997 f' 1448-S.-.R. 333 ._

. 1 Russellville, CAR 72801

~

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO SLEEVING PROCESS FOR THE STEAM GENERATOR TUBES AT ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2)-

( (TAC NO. M97292)

[

Dear Mr. Hutchinson:

By letter dated November-26, 1996, Entergy Operations, Inc. submitted a

. request for Technical Specifications.(TSs) change to allow tube sleeving for the ANO, Unit 2 steam generators. As a result _of a review of your letter

, dated November 26, 1996, the. staff identified areas where additional i information is needed to-proceed with their review of your request.

i

)

. Upon review of your submittal, the staff found the proposed TSs do not provide j adequate inservice inspection (ISI) of sleeved steam generator tubas. The Nuclear Regulatory Commission (NRC) staff requests that requirements for ISI i- of sleeved steam generator tubes be incorporated into the TSs; specifically, z the' initial sample scope and the sample scope expansion criteria that will be-applied for. sleeved tubes should one or more defective sleeved tubes be identified. Recent submittals from other facilities incorporated what the staff considers to be adequate revisions to the TSs for the ISI-of sleeved

{ tubes.

1-

. Please provide your response to the enclosed questions within 30 days so that

our review of the this matter can proceed on schedule.. If you need clarification of the staff's request, please contact me at (301) 415-1367.

Sincerely, 1  ! , r' ORIGINAL SIGNED BY:

Kombiz Salehi, Acting Project Manager  ;

. - Project Directorate IV-1 '

! Division of Reactor Projects III/IV

3 m Office of Nuclear Reactor Regulation

, . > > s

. ~-

2-Docket'No.- 50-368; ' '

2 1 .

, +

J Enclosure; ; Request for Additional'Information W , ,

"7,y N

i:c.w,/ enc 1: - See next'page.g_%

s < -

G:y*)ISTRIBUTION:,-

^

J '(

HocketFj)

PUBLIC - PD4-1 r/f { ,g\

,K.-Saleh);,b. -

C. Hawes s OGC l

i ./ACRS v Y

,f v (J.? Dyer,iRIV J. Roe QO\

v p"El Adensam'(EGA1) ' S. Coffin E. Sullivan

', i  ;< ~

i

Document Fame
AR297292297292RAI' 4 OFC (A)PM/PD4-1 (A)LA/PD4-1 NAME' KSaM/vw CHawes ce NRC FILE CENTER COPY l- DATE~ I/7 /97 1/7/97 COPY h/N0'- YES/N0 gp :Irlai DCr^nn ~~

' " ^9701000160 970107 DR ADOCK0500g38 e - . .- - .

p uru l

p k UNITED STATES s* j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20061 4 001 4 ,o 9***** January 7, 1997 4

Mr. C. Randy Hutchinson i Vice President, Operations ANO Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO SLEEVING PROCESS FOR THE STEAM GENERATOR TUBES AT ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2)

(TAC NO. M97292)

Dear Mr. Hutchinson:

By letter dated November 26, 1996, Entergy Operations, Inc. submitted a request for Technical Specifications (TSs) change to allow tube sleeving for the ANO, Unit 2 steam generators. As a result of a review of your letter dated November 26, 1996, the staff identified areas where additional information is needed to proceed with their review of your request.

i

Upon review of your submittal, the staff found the proposed TSs do not provide l adequate inservice inspection (ISI) of sleeved steam generator tubes. The Nuclear Regulatory Commission (NRC) staff requests that requirements for ISI of sleeved steam generator tubes be incorporated into the TSs; specifically, the initial sample scope and the sample scope expansion criteria that will be applied for sleeved tubes should one or more defective sleeved tubes be identified. Recent submittals from other facilities incorporated what the staff considers to be adequate revisions to the TSs for the ISI of sleeved tubes.

Please provide your response to the enclosed questions within 30 days so that our review of the this matter can proceed on schedule. If you need clarification of the staff's request, please contact me at (391) 415-1367.

Sincerely, , ,

M Kombiz Sa ehi, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

Request for Additional Information cc w/ encl: See next page

. . ~ _. . . . _ _ _ _ _ _ - . _ . _ . . - _ _ . _ _ . _ _ . __ _ _

i1 Mr. C. Randy Hutchinson Entergy Operations, Inc. Arkansas Nuclear One, Unit 2 4

l cc:

, Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995

P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-199 1 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 351 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health
4815 West Markham Street, Slot 30
Little Rock, AR 72205-3867

! Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

! Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310  ;

London, AR 72847 l Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801

5 RE0 VEST FOR ADDITIONAL INFORMATION

_RELATED TO TECHNICAL SPECIFICATION CHANGE REQUEST STEAM GENERATOR TUBE SLEEVING ENTERGY OPERATIONS INC.

ARKANSAS NUCLEAR ONE. UNIT 2 (ANO-2)

DOCKET NO. 50-113

1. Entergy Operations, Inc. (E01) proposed modifying ANO-2 TS 4.4.5.4.a.7 to change the plugging limit for an ABB/CE sleeve to 29% of the nominal sleeve wall thickness. What is the basis for the 29% allowable degradation for sleeved tubes?
2. Please describe the extent to which ANO-2 subscribes to the EPRI PWR Steam Generator Tube Examination Guidelines. For example, does the licensee use Appendix G " Qualified Personnel" and Appendix H " Qualified Techniques"?
3. Please describe generally the approach E01 plans for adopting new and improved eddy current techniques for sleeve inspections.

ENCLOSURE l

6