Forwards Insp Rept 50-333/97-04 on 970413-0525 & Nov. Violations Re Failure of Radiation Workers to Follow Radiation Protection Requirement
ML20141A229
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/13/1997
From: Rogge J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20141A231 List:
References
50-333-97-04, 50-333-97-4, NUDOCS 9706200183
Download: ML20141A229 (4)


See also: IR 05000333/1997004

Text

. - . - .

. - . . -

-

.

. - -

.

.

-

.

_

-.

- - - -

. _ - .

_ -

-

>

.

go

.

,

4 .-

1

_

June 13, 1997

j-

Mr. Michael J. Colomb

<

Site Executive Officer

New York Power Authority

j

James A. FitzPatrick Nuclear Power Plant

i

Post Office Box 41

j

Lycoming, NY 13093

SUBJECT:

NRC INTEGRATED INSPECTION 50-333/97-04 AND NOTICE OF VIOLATION

i

1

)

Dear Mr. Colomb:

$

On May 25,1997 the NRC completed an inspection at your FitzPatrick Power Plant. The

I

!

enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at

j

the plant were generally characterized by safe plant operation.

i

An NRC team inspection was conducted to evaluate your corrective action program.

1

1

Overail, your problem identification and corrective action program was considered to be

j

good. The Plant Operation and Safety Review Committees provided an appropriate level of

oversight and Quality Assurance audits were considered to be a strength. Self-

l

.

identification of problems by front-line personnel seemed to be increasing. Weaknesses

'

'

were identified in the review and documentation for extent of condition and in the response

i

to repetitive problems. In particular, corrective actions for previous findings related to

j

radiological control barriers and radiation worker practices have not been effective.

1

l

Based on the results of this inspection, a violation of NRC requirements occurred. The

!

violation concerned the failure of radiation workers to follow radiation protection

i

requirements. You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice of Violation (Notice) when preparing your response, in

j

your response, you should document the specific actions taken and any additional actions

i

i

you plan to prevent recurrence. Your response may reference previous docketed

correspondence if the correspondence adequately addresses the required response. Please

!

include as a part of your response those corrective actions you intend to take to

i

understand the broader implications of these violations. After reviewing your response to

this Notice, including your proposed corrective actions and the results of future

'

l

inspections, the NRC will determine whether further NRC enforcement action is necessary

!

to ensure compliance with NRC regulatory requirements. To the extent possible, your

'

j

response should not include any personal privacy, proprietary, or safeguards information

so that it can be placed in the PDR without redaction.

,

!

!

!

f

J

hllllllllll$lhlllll ll

\\

l

9706200183 970613

,

PDR

ADOCK 05000333

G

PDR

r

0FFICIAL RECORD COPY

IE:01

i

._

-

_ . . . -

. - - - - - . - - . -

. - - . - _ -

- - . - . - - . . - . . - .

- . - . .

'

.

!

.*

!

!

Michael J. Colomb

2

'

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

i

We appreciate your cooperation.

l

!

Sincerely,

Original Signed by:

John F. Rogge, Chief

i

Projects Branch 2

Division of Reactor Projects

l

1

Docket No.: 50-333

!

License No.: DPR-59

l

l

Enclosures:

,

1.

Notice of Violation

[

2.

Inspection Report 50-333/97-04

cc w/encis:

.

C. D. Rappleyea, Chairman and Chief Executive Officer

R. Schoenberger, President and Chief Operating Officer

'

J. Knubel, Chief Nuclear Officer and Senior Vice President

H. P. Salmon, Jr., Vice President of Nuclear Operations

i

W. Josiger, Vice President - Engineering and Project Management

J. Kelly, Director - Regulatory Affairs and Special Projects

,

T. Dougherty, Vice President - Nuclear Engineering

i

R. Deasy, Vice President - Appraisal and Compliance Services

R. Patch, Director - Quality Assurance

}

G. C. Goldstein, Assistant General Counsel

C. D. Faison, Director, Nuclear Licensing, NYPA

'

K. Peters, Licensing Manager

T. Morra, Executive Chair, Four County Nuclear Safety Committee

l

Supervisor, Town of Scriba

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

!

P. Eddy, Director, Electric Division, Department of Public Service, State

I

of New York

G. T. Goering, Consultant, New York Power Authority

J. E. Gagliardo, Consultant, New York Power Authority

l

E. S. Beckjord, Consultant, New York Power Authority

l

F. William Valentino, President, New York State Energy Research

l

and Development Authority

i

J. Spath, Program Director, New York State Energy Research

i

and Development Authority

.

!

!

- -

.-.

_

-

- _

.

-

.

.

..- ._ .~ - -

- - .

. .. ...- _

.

. . . . .

_ . - - . . . ..

-

. . . - . -

i ,-

' . .

.

Michael J. Colomb

3

Distribution w/encls:

I

' W. Axelson, DRA

D. Screnci, PAO

,

Nuclear Safety Information Center (NSIC)

i

PUBLIC

i'

NRC Resident inspector

Region i Docket Room (with concurrences)

R. Correia, NRR

F. Talbot, NRR

L. Cunningham, NRR

D. Barss, NRR

J. Rogge, DRP

R. Barkley, DRP

R. Junod, DRP

D. Vito, AOC

Distribution w/ encl: (VIA E-MAIL)

W. Dean, OEDO (WMD)

S. Bajwa, NRR

K. Cotton, NRR

D. Hood, NRR

M. Campion, RI

Inspection Program Branch, NRR (IPAS)

DOCDESK

DOCUMENT NAME: G:\\ BRANCH 2\\lR9704.FTZ

'S:n previous concurrences

To r ceive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure

"E" =

Copy with attachment / enclosure

"N" = No copy

OFFICE

  • Rl/DRP

'Rl/DRP

NAME

GHunegs

JRogge

DATE

06/13/97

06/13/97

OFFICIAL RECORD COPY

.

.. _ _ _ . _ _ . .

.

_ . . _ . . - _

_ _ _ . . _

. _ _ _ _

_

._

_ _ . . . . . _ _ . _ . _ _ .

i

.-

!

!

l

..

j

Michael J. Colomb

3

Distribution w/encls:

W. Axelson, DRA

i

<

'

D. Screnci, FAO

4

Nuclear Safety Information Center (NSIC)

PUBLIC

r

NRC Resident 3nspector

Region i Docket Room (with concurrences)

-

R. Correia, NRR

,

I

F. Talbot, NRR

j

L. Cunningham, NRR

1

D. Barss, NRR

'

J. Rogge, DRP

R. Barkley, DRP

R. Junod, DRP

3

D. Vita, AOC, (Rl-96-A-0285)

2

Distribution w/ encl: (VIA E-MAIL)

]

W. Dean, OEDO (WMD)

S. Bajwa, NRR

K. Cotton, NRR

D. Hood, NRR

,

3

M. Campion, RI

f

Inspection Program Branch, NRR (IPAS)

DOCDESK

i

'

i

i

h

i

!

!

e

i

'

l

l

i

l

2

DOCUMENT NAME: G:\\ BRANCH 2\\lR9704.FTZ

,

.

To r:ceive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure

"E" =

'

l

Copy with attachment / enclosure

"N" = No copy

i

OFFICE

Rl/DRP

g

Rl/DRP

3 j

j

NAME

GHunegs /fr

JRogge /L/

J

DATE

06/ 797 VV

06/g/97

1

]

OFFICIAL RECORD COPY

/

"

i

~