ML20140J373

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-354/97-03 on 970429-0531 & NOV
ML20140J373
Person / Time
Site: Hope Creek 
Issue date: 06/12/1997
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML20140J379 List:
References
50-354-97-03, 50-354-97-3, NUDOCS 9706190398
Download: ML20140J373 (4)


See also: IR 05000354/1997003

Text

_

_

_.

_ - -

. _ _ _ _

_

_

.w

( a .= .

,

.

June 12, 1997

'

Mr. Leon R. Eliason

Chief Nuclear Officer and President

Nuclear Business Unit

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-354/97-03

NOTICE OF VIOLATION

Dear Mr. Eliason:

On May 31,1997, the NRC cornpleted an inspection at your Hope Creek reactor facility.

The enclosed report presents the results of that inspection.

During this periad, several visiting inspectors conducted routine inspections of your site.

These inspections included reviews of actions taken to address loose or missing fasteners

for electrical covers on Seismic Category I motor control center and substation transformer

cabinets, routine evaluations of your radioactive liquid and gaseous effluent control and

environmental monitoring programs, and an oversight review of your recently completed

Station Service Water Operational Performance Inspection. The results of the latter

inspection will be detailed in a subsequent report. Overall, the results of these inspections

generally indicate that your radiological programmatic controls and quality oversight

programs are effective. Routine resident inspector observations and assessments also

noted generally good performance in the control and monitoring of safety-related activities.

We are concerned, however, about a violation of NRC requirements that was identified

during this inspection period. Specifically, we noted instances of failures by maintenance

personnel to adhere to written procedural guidance in the completion of safety-related

v.ork activities. Once such instance led to an undetected degradation of the high pressure

coolant injection system for a period of 11 days, a condition that was discovered only

through a failed quarterly inservice test of the system. Other examples were also

observed, including both NRC- and self-identified instances involving maintenance

procedure quality and compliance. Further, two recent Licensee Event Reports (97-04 and

97-06) document procedural errors by maintenance techniciar's. We are interested in your

response to this concern in light of this apparent negative tre,nd in performance, particularly

since corrective actions for similar NRC-identified issues in aarly 1996 (both during and

after the Restart Assessment Team inspection (see NRC !nspection Reports 50-354/96-80

and 96-03)) do not appear to have been fully effective.

Additionally, we noted that staffing levels in the Hope Creek engineering department have

declined over the past several months. While no direct observable performance issue has

been identified as a result of this decline, we remain concerned that your existing staff will

be significantly challenged to reduce the large backlog of engineering work, prepare for the

upcoming refueling outage, and conduct routine system monitoring in support of safe and

reliable operation over the next several months.

9706190390 970612

lllllllloll{.ll.hl{

g'

PDR

ADOCK 05000354

.

..,

O

PM

q

r.

i

,I

.

,

I

1

Mr. L. Eliason

2

!

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

l

l

ORIGINAL SIGNED BY:

(

1

t

'

l

James C. Linville, Chief

Projects Branch 3

l

Division of Reactor Projects

!

1

l

Docket No.: 50-354

4

License No: NPF-57

1

Enclosures:

Notice of Violation

Inspection Report 50-354/97-03

1

i

!

-

i

)

3

l

l

l

i

!

r

l

l

!

.

!

!

!

!

4

l

)

.

_ . _ _ - _ _ _ _ .

. _ . .

.

. _ -.__.__ _._.-._ ___. -_

. _ . _ . _ _ _ _ . _ _

.

.

d

'

Mr. L. Eliason

3

,

I

,

cc w/ encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

A. F. Kirby, Ill,, External Operations - Nuclear, Delmarva Power & Light Co.

J. A. Isabella, Manager, Joint Generation

Atlantic Electric

M. Bezilla, General Manager - Hope Creek Operations

J. McMahon, Director - Quality Assurance & Nuclear Safety Review - Quality Assurance &

Nuclear Safety Review

D. Powell, Manager - Licensing and Regulation

l

R. Kankus, Joint Owner Affairs

l

A. C. Tapert, Program Adrninistrator

Jeffrey J. Keenan, Esquire

l

M. J. Wetterhahn, Esquire

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

State of New Jersey

i

l

State of Delaware

i

1

i

i

l

l

l

,

,

,

..

_

, _ .

_

r

__

1

i

-

.

,

.

t

.

,

Mr. L. Eliason

4

'

Distribution w/ encl:

Region i Docket Room (with concurrences)

K. Ciallagher

D. Screnci, PAO

J. Linville, DRP

'

,

S. Barber, DRP

,

!

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

PUBLIC

Distribution w/ encl: (Via E-Mail)

W. Dean, OEDO

D. Jaffe, Project Manager, NRR

l

J. Stolz, PDI 2, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

D. Taylor, NRR

,

DOCDESK

!

I

i

.

l

l

P

DOCUMENT NAME: g:\\ branch 3\\9703.hc

Ta receive e copy of th6s document, indicate in the box: "C" = Copy without attachment / enclosure

"E" = Copy with attachment! enclosure

'N' = No copy

OFFICE

RI:DRP

4,l

Rl:DRP

/)l

_

NAME

SMorris \\7(f

JLinville \\)(//

DATE

0/jg97

I

(

6f y9) /

'

l

'~

T'

OFFICIAL RECORD COPY

I