ML20140H382

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-445/85-19 on 851118-1218.Violations Identified Discussed at 851218 Exit Meeting.Related Enforcement Actions Will Be Forwarded Under Separate Correspondence
ML20140H382
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/28/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20140H385 List:
References
NUDOCS 8604040109
Download: ML20140H382 (2)


See also: IR 05000445/1985019

Text

s.

.

.

In Reply Refer To:

Docket: 50-445/85-19

MAR 26 SE

~

Texas Utilities Generating Company

-ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, i..B. 81

Dallas, Texas 75201

Gentlemen:

This refers to the special inspection conducted by Mr. T. F. Westerman,

members of the Region IV Comanche Peak Group, and NRR personnel during the

period of November 18 through December 18, 1985, of activities authorized by

NRC Construction Permit CPPR-126 for the Comanche Peak Steam Electric Station,

Unit 1, and to discussions with Mr. R. E. Camp and other members of your staff

on November 22, 1985, and December 5, 1985.

The purpose of the special. inspection was to evaluate the Comanche Peak Steam

Electric Station, Unit 1.as-built cable tray inspection program. The

inspection identified multiple instances involving the failure to properly

inspect and document as-built cable tray attributes. In addition, violations

were identified relative to both the failure of the QA programs to establish

QA overview and audits of the Unit I as-built cable tray inspection program

and the use of incorrect weld bevel angles. The violations and related NRC

concerns were discussed with you in the subsequent exit meeting held on

December 18, 1985.

No response to this letter is requested. Enforcement actions relative to this

inspection will be forwarded under separate correspondence.

s l

RIV: CPG C: CPG b AD:DRS ES NRR #'

IBarnes;ap TWesteman EJohnson DPowers VNoona p/ p Mo

3 /2F/'86

53

2/pf/86 3/A/86 J /g /86 1/H/86 /M

soffOYS F

i O I, (

.

, ,

.

Texas Utilities Generating Company -2-

Should.you have any questions concerning this -letter, we will be glad to

discuss them with you.

Sincerely,

m al sign 4d B Y.

2. H. Johnson

E. H. Johnson, Director

Division of Reactor Safety

and Projects

Enclosure:

Appendix - NRC Inspection Report

50-445/85-19

cc w/ enc 1:

Texas Utilities Electric Company

ATTN: J. W. Beck, Vice President Licensing

Quality Assurance and Nuclear Fuels

Skyway Tower

400 North Olive Street bec to DMB (IE01)

Lock Box 81

Dallas, Texas 75201 bec distrib. by RIV:

  • RPB * MIS System

Juanita Ellis *RRI-0PS *RSTS Operator

President - CASE *RRI-CONST- *R&SPB

1426 South Polk Streat *TFWesterman, CPTG DRSP

Dallas, Texas 75114 V. Noonan, NRR .R. Martin, RA

S. Treby, ELD *RSB

Renea Hicks *RIV File J. Taylor,-IE

Assistant Attorney General *D. Weiss, LFMB (AR-2015)

Environmenta1' Protection Divisicn R. Heishman, IE *D. Powers, EC

P. O. Box 12549

Austin, Texas 76711

  • w/766

Texas Radiation Control Program Director

i