MAR 2 81986 Gulf States Utilities ATTN: William J. Cahill, Jr.
Senior Vice President River Bend Nuclear Group P. O. Box 2951 Beaumont, Texas 77704
Dear Mr. Cahill:
This is to document that at our meeting today with you and the other utility representatives we discussed:
1.
The NRC view of the features that utility allegation management j
systems should possess. The discussion included actions NRC expects licensees to take when allegations received by NRC are referred to the utility for action in accordance with NRC policy.
2.
Region IV's approach to emergency response, and the NRC role during emergencies.
3.
NRC Operator requalification testing program and its application to evaluation of licensee requalification program.
4.
Section 210 of the Energy Reorganization Act.
Although the discussions were general and did not relate specifically to your facility, I believe the exchange was beneficial to all the participants.
Sincerely.
Original signed by:
Robert D. Martin Robert D. Martin Regional Administrator cc: Gulf States Utilities ATTN:
J. E. Booker, Manager-j Engineering, Nuclear l
Fuels & Licensing P. O. Box 2951 i
Beaumont, Texas 77704 Louisiana State University, Government Documents Department Louisiana Radiation Control Program Director bec to DMB (IE45)J bec distrib. by RIV:
- RPB DRSP l
- Resident Inspector R. D. Martin, RA d
- Section Chief (RPB/A) 7 0%y ha D
,g R& PB
- RIV File p
RIV:DRA RA mah c / r.,
ununvrin
k'g# N UNITED STATE 3 g
[
NUCLEAR C~ECULATOLY COMMIS0lON
,T i
$3 REGION IV t
S
$11 RYAN PLAZA DRIVE, SulTE 1000 ARLINGTON. TEXAS N011 MAR 2 8 GJs Gulf States Utilities ATTN: William J. Cahill Jr.
Senior Vice President River Bend Nuclear Group P. O. Box 2951 Beaumont, Texas 77704 4
i
Dear Mr. Cahill:
This is to document that at our meeting today with you and the other utility representatives we discussed:
1.
The NRC view of the features that utility allegation management systems should possess. The discussion included actions NRC expects j
licensees to take when allegations received by NRC are referred to the utility for action in accordance with NRC policy.
2.
Region IV's approach to emergency renponse, and the NRC role during emergencies.
3.
NRC Operator requalification testing. program and its application to evaluation of licensee requalification program.
4.
Section 210 of the Energy Reorganization Act.
Although the discussions were general and did not relate specifically to your facility, I believe the exchange van beneficial to all the participants.
Sincerel,
[
j f
di N hg Robert D. Martin Regional Administrator cc:
Gulf States Utilities ATTN:
J. E. Booker, Manager-Engineering Nucicar Fuels & Licensing P. O. Box 2951 Beaumont, Texas 77704 1,ouisiana State University, Government Documents Department I,ouisiana Radiation Control Program Director