Forwards Safety Insp Rept 50-354/86-10 on 860127-0207 & Notice of Violation
ML20140H171
Person / Time
Site: Hope Creek 
Issue date: 03/27/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
Shared Package
ML20140H177 List:
References
NUDOCS 8604040067
Download: ML20140H171 (2)


See also: IR 05000354/1986010

Text

.

.

MAR 2 71996

Docket No. '50-354

Public Service Electric & Gas Company

ATTN: Mr. C. A. McNeill, Jr

Vice President - Nuclear

Post Office Box 236

Hancocks Bridge, New Jersey 08038

Gentlemen:

Subject:

Inspection Report No. 50-354/86-10

This. refers to the routine safety inspection conducted by Mr. L. Briggs of this

office on January 27, 1986 - February

7, 1986, at the Hope Creek Generating

Station, Hancocks Bridge, New Jersey, of activities authorized by NRC License

No. CPPR-120 and to the discussions of our findings held by Mr. L. Briggs with

Mr. Giardino and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are-described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the inspec-

tion consisted of selective examinations of procedures and representative re-

cords, interviews with personnel, measurements made by the inspector, and obser-

vations by the inspector.

Based on the results of this inspection, it appears that certain of your acti-

vities were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These violations

have been categorized by severity level in accordance with the revised NRC En-

forcement Policy (10 CFR 2, Appendix C) published in the Federal Register Notice

(49 FR 8583) dated March 8, 1984. Your proposed corrective actions for these

violations were followed up on and reviewed on site February 12-14, 1986 during

inspection 50-354/86-12. Based on this review which is described in detail in

report ~ 50-354/86-12, you need not respond to this letter. We will continue to

closely review your preoperational testing program and assess the effectiveness

of your corrective actions.

Your cooperation with us in this matter is appreciated.

Sincerely,

Originni sigw,3 ,

a

7

Lee H. Bettenhauwn

Stewart D. Ebneter, Director

40jo06

g

4

Division of Reactor Safety

goI

a

1

0FFICIAL RECORD COPY

IR HOPE CREEK 86-10 - 0001.0.0

03/21/96

..

4

Enclosures:

1.

Appendix A, Notice ~of Violation

2.

NRC Region I Inspection Report Number 50-354/86-10

cc w/encls:

A. E. Giardino, Manager, Station Quality Assurance

R. L. Mitti, General Manager, Nuclear Assurance and Regulation

A. J. Pietrofitta, General Manager, Power Production Engineering,

Atlantic Electric

L. A. Reiter, General Manager - Licensing and Reliability

Rebecca A. Green, Bureau of Radiation Protection

Public Document. Room (PDR)

-

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bcc w/encls:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encl)

DRP'Section Chief

J. Grant, DRP

b

RIM

_

R

RI:DRS

eBrTns7geb

Bettent)gusen

J/7/86

3 y gg

.7 /2 7/ 56

0FFICIAL RECORD COPY

IR HOPE CREEK 86-10 - 0001.1.0

02/28/86