Forwards SALP Board Rept 50-341/85-27 (Summary) for Oct 1984 - June 1985
ML20140G095
Person / Time
Site: Fermi 
Issue date: 06/28/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
Shared Package
ML20140G099 List:
References
NUDOCS 8507120333
Download: ML20140G095 (2)


See also: IR 05000341/1985027

Text

f

Dn\\B

'

[joO Cfo

ug'

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

[ ,

e(

o

REGION 111

3

-[

799 ROOSEVELT RO AD

.

GLEN ELLYN, ILLINOIS 60137

JUN 281985

-

Docket No. 50-341

Detroit Edison Company

ATTN: Dr. Wayne H. Jens

Vice President

Nuclear Operations

2000 Second Avenue

Detroit, Michigan 48226

Gentlemen:

Enclosed for your review, prior to our scheduled meeting of July 2,1985, is

the SALP Board Report (summary) for the Enrico Fermi Nuclear Station covering

the period October 1, 1984 through June 30, 1985.

During the assessment period, your emphasis has shifted from construction to

preoperational testing and operational readiness. With this shifting emphasis

and considering your schedule for requesting full power authorization, we

have evaluated your programs related to these areas and have included our

findings in this assessment report.

During this assessment period your regulatory performance at the Fermi station

was considered to be acceptable and showed an improving trend.

You were rated

Category 1 in 3 areas (Fueling, Emergency Preparedness, Preoperational and

Startup Testing), Category 2 in 9 areas, and Category 3 in one area. The

Category 3 rating was in the area of fire protection and was primarily

based on management's failure to identify problems and effectuate timely

resolution. The performance trend within the assessment period improved

in 3 areas, remained the same in 6 areas and has not declined in any of

the remaining areas trended. A trend could not be determined in 4 areas.

The enclosed SALP Board report is a brief sunmary of the final SALP

report which will be issued at a later date. This summary report

includes all functional areas assessed during the SALP 6 period, your

ratings in each functional area, and a brief summary of our findings used

in determining the associated ratings.

While you will have sufficient opportunity to present your comments at

the meeting on July 2,1985, you may also provide written conment within

30 days after the meeting. We will evaluate any written comments and

provide you with our conclusions relative to them.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

SALP Summary Report will be placed in the NRC's Public Document Roep.

8507120333 050620

lgL.0

PDR

ADOCK 05000341

O

PDR

P

l,;(

-

'

.

. Detroit Edison Company

2

EN 281985

No reply to this~ letter is required at this time; however, should you have any

questions concerning the SALP Report, we would be pleased to discuss them with

you.

Sincerely,

original signed by

Jancs G. Keppler

James G. Keppler

Regional Administrator

Enclosure: SALP Sumary Report

No. 50-341/85027

cc w/ enclosure:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Comission

Harry H. Voigt, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

J. M. Taylor, Director, IE

P. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

N. J. Palladino, Chairman

J. K. Asselstine, Comissioner

T. M. Roberts, Comissioner

L. W. Zech, Comissioner

NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, IE

RIII PRR

RIII SGA

State Liaison Officer, State of

Michigan

INP0

RII

RII

RIII

RIII

RII

1ab

us

Spe

rd

StMek/ls

Chrissotimos

06/ V85

06/27/85

06/>7/85

06/77/85

06/tq/85

7

RIII

RIII

RII y

.8

P

Ke

er

Davis (/85

ind

06/2-f

06

Q85

6/;4/85