ML20140G095
| ML20140G095 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/28/1985 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jens W DETROIT EDISON CO. |
| Shared Package | |
| ML20140G099 | List: |
| References | |
| NUDOCS 8507120333 | |
| Download: ML20140G095 (2) | |
See also: IR 05000341/1985027
Text
f
Dn\\B
'
[joO Cfo
ug'
UNITED STATES
g
NUCLEAR REGULATORY COMMISSION
[ ,
e(
o
REGION 111
3
-[
.
GLEN ELLYN, ILLINOIS 60137
JUN 281985
-
Docket No. 50-341
Detroit Edison Company
ATTN: Dr. Wayne H. Jens
Vice President
Nuclear Operations
2000 Second Avenue
Detroit, Michigan 48226
Gentlemen:
Enclosed for your review, prior to our scheduled meeting of July 2,1985, is
the SALP Board Report (summary) for the Enrico Fermi Nuclear Station covering
the period October 1, 1984 through June 30, 1985.
During the assessment period, your emphasis has shifted from construction to
preoperational testing and operational readiness. With this shifting emphasis
and considering your schedule for requesting full power authorization, we
have evaluated your programs related to these areas and have included our
findings in this assessment report.
During this assessment period your regulatory performance at the Fermi station
was considered to be acceptable and showed an improving trend.
You were rated
Category 1 in 3 areas (Fueling, Emergency Preparedness, Preoperational and
Startup Testing), Category 2 in 9 areas, and Category 3 in one area. The
Category 3 rating was in the area of fire protection and was primarily
based on management's failure to identify problems and effectuate timely
resolution. The performance trend within the assessment period improved
in 3 areas, remained the same in 6 areas and has not declined in any of
the remaining areas trended. A trend could not be determined in 4 areas.
The enclosed SALP Board report is a brief sunmary of the final SALP
report which will be issued at a later date. This summary report
includes all functional areas assessed during the SALP 6 period, your
ratings in each functional area, and a brief summary of our findings used
in determining the associated ratings.
While you will have sufficient opportunity to present your comments at
the meeting on July 2,1985, you may also provide written conment within
30 days after the meeting. We will evaluate any written comments and
provide you with our conclusions relative to them.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
SALP Summary Report will be placed in the NRC's Public Document Roep.
8507120333 050620
lgL.0
ADOCK 05000341
O
P
l,;(
-
'
.
. Detroit Edison Company
2
No reply to this~ letter is required at this time; however, should you have any
questions concerning the SALP Report, we would be pleased to discuss them with
you.
Sincerely,
original signed by
Jancs G. Keppler
James G. Keppler
Regional Administrator
Enclosure: SALP Sumary Report
No. 50-341/85027
cc w/ enclosure:
L. P. Bregni, Licensing
Engineer
P. A. Marquardt, Corporate
Legal Department
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Comission
Harry H. Voigt, Esq.
Nuclear Facilities and
Environmental Monitoring
Section
J. M. Taylor, Director, IE
P. R. Denton, Director, NRR
Regional Administrators
RI, RII, RIV, RV
N. J. Palladino, Chairman
J. K. Asselstine, Comissioner
T. M. Roberts, Comissioner
L. W. Zech, Comissioner
NRR Project Manager
H. L. Thompson, NRR
J. Axelrad, IE
RIII PRR
RIII SGA
State Liaison Officer, State of
INP0
RII
RII
RIII
RIII
RII
1ab
us
Spe
rd
StMek/ls
Chrissotimos
06/ V85
06/27/85
06/>7/85
06/77/85
06/tq/85
7
RIII
RIII
RII y
.8
P
Ke
er
Davis (/85
ind
06/2-f
06
Q85
6/;4/85