ML20140F796

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-440/97-201 on 970217-0327.Identified Three Examples Where Facility Being Operated Differently than Described in USAR or Vendor Design Input Info
Date released: 06/02/2020 Download: ML20140F796


Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys
ML20140F837
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/10/1997
From:
NRC (Affiliation Not Assigned)
To:
References
Download: ML20140F837 (83)
Forwards Insp Rept 50-440/97-201 on 970217-0327.Identified Three Examples Where Facility Being Operated Differently than Described in USAR or Vendor Design Input Info
ML20140F791
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/10/1997
From: Gallo R
NRC (Affiliation Not Assigned)
To: MYERS L W
CENTERIOR ENERGY
References
Download: ML20140F791 (8)