Text
__
l i 4 May 1, 1997 o.
Mr. Joseph J. Hagan Vice President, Operations Entergy Operations, Inc l
P. O. Box 756 Port Gibson, MS 39150 i
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - GENERIC LETTER 95-07, " PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-0PERATED GATE VALVES," GRAND GULF NUCLEAR STATION, UNIT 1 (TAC N0. M93467)
Dear Mr. Hagan:
On August 17, 1995, the Nuclear Regulatory Commission issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-0perated Gate Valves," to request that licensees take actions to ensure that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety l
functions. We are reviewing and evaluating your responses, dated October 15, 1995, and February 13 and June 28, 1996, to GL 95-07. Additional information, as discussed in the enclosure, is requested in order to complete our review.
1 l
We request that you respond within 60 days of the receipt of the letter.
1 h
6/\\ l%
.Dono$,SeniorProjectManager l
Jack g
- ggQhh Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation l
Docket No. 50-416
Enclosure:
Request for Additional Information cc w/ encl:
See next page QlSTRIBUTION:
Docket File PUBLIC PD4-1 r/f JDonohew JRoe EAdensam (EGA1)
PGwynn, RIV ACRS 9
l OGC (15B18)
CHawes WBeckner EMEB r/f l
DTerao STingen Uf
/
b U b11'I Document Name: GG93467.RAI OFC PM:PDf-T\\
LA:PD4-1 SRXB/NRR SC:SRXB/KRR BC:SF.XB/NRS JDong h p CHawesdnk STingen 'Tr-DTerao N RWeskn NAME DATE
/P /34 /97 f/30 /97 4 / 3d/97 d/ Y /97 h/ $D /97 (IES)NO YES/N0 YESJN0 (If)NO h/N0 COPY S
OFFICIAL RECORD COPY 9705050305 970501 DR ADOCK 05000416 PDR
__ _ _ _.... _ _ _ _. _ _ ~ -
j
$0E%
UNITED STATES y
4 g
j NUCLEAR REGULATORY COMMISSION
~t WASHINGTON, D.C. enana annt h
y *....+p May 1,1997 Mr. Joseph J. Hagan l
Vice President, Operations Entergy Operations, Inc P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - GENERIC LETTER 95-07, " PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-0PERATED GATE VALVES," GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. M93467)
Dear Mr. Hagan:
On August 17, 1995, the Nuclear Regulatory Commission issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-0perated Gate Valves," to request that licensees take actions to ensure l
L that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety l
functions. We are reviewing and evaluating your responses, dated October 15, 1995, and February 13 and June 28, 1996, to GL 95-07. Additional information, as discussed in the enclosure, is requested in order to complete our review.
We request that you respond within 60 days of the receipt of the letter.
Sincerely, Jack N. Donohew, Senior Project Manager
- Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416 i
j
Enclosure:
Request for Additional Information j
cc w/ encl: See next page i
1 E
c-
Mr. Joseph-J. Hagan Entergy Operations, Inc.
Grand Gulf Nuclear Station cc:
Executive Vice President General Manager, GGNS I
& Chief Operating Officer Entergy Operations, Inc.
l Entergy. Operations, Inc.
P. O. Box 756 P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 Attorney General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana l
Jackson, MS 39205 P. O. Box 94005 l
Baton Rouge, LA 70804-9005 Winston & Strawn 1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of Health P. O. Box 1700
[
Director Jackson, MS 39205 i
Division of Solid Waste Management l
Mississippi Department of Natural Office of the Governor i
Resources State of Mississippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attorney General President, Asst. Attorney General i
Claiborne County Board of Supervisors State of Mississippi Port Gibson, MS 39150 P. O. Box 22947 Jackson, MS 39225 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Vice President, Operations Support 611 Ryan Plaza Drive, Suite 1000 Entergy Operations, Inc.
Arlington, TX 76011 P.O. Box 31995 Senior Resident Inspector U. S. Nuclear Regulatory Commission Director, Nuclear Safety Route 2, Box 399 and Regulatory Affairs Port Gibson, MS 39150 Entergy Operations, Inc.
P.O. Box 756 Manager of Operations Port Gibson, MS 39150
~
Bechtel Power Corporation P.O. Box 2166 Houston, TX 77252-2166 l
i i
N
_.____._.___._.______m 1
(
o t
REQUEST FOR ADDITIONAL INFORMATION RELATED TO GENERIC LETTER 95-07 PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED MOVs ENTERGY OPERATIONS. INC.
GRAND GULF NUCLEAR STATION. UNIT I DOCKET NO. 50-416 The following request for additional information is based on the staff's review of (1) Entergy Operations, Inc.'s (E0I's) submittals dated October 15, 1995, and February 13 and June 28, 1996, related to Generic Letter (GL) 95-07,
" Pressure Locking and Thermal Binding of Safety-Related Power-0perated Valves," and (2) the meetings held on March 25 and April 9, 1997, on the generic letter. The meeting summaries were issued on April 10 and 25, 1997, respectively.
1.
During a meeting on March 25, 1997, E0I provided the Nuclear Regulatory Commission (NRC) staff with a copy of Test Report, " Flow Loop Differential Pressure and Pressure Lock Tests on a 14-inch William Powell Gate Valve," dated March 1,1993. The NRC staff reviewed the i
test report but the information necessary to independently verify the pressure locking test results was not in the report.
Discuss the schedule when the test data can be provided to the staff.
2.
During a meeting on April 9, 1997, E01 discussed the development and use of its pressure locking thrust prediction methodology and the test data used to evaluate acceptability of the methodology. During the meeting, E0I presented test results from a 14-inch (900-pound) William Powell valve; a 4-inch (1500-pound) Westinghouse valve; a 10-inch (900-pound)
Crane valve; a 10-inch (300-pound) Borg-Warner valve; and Idaho National l
Engineering and Environmental Laboratory (INEEL) pressure locking test results from a 6-inch (600-pound) Walworth valve to help support its i
methodology.
E01 stated that it intended to perform more testing to validate the model but a test schedule has not been developed to accomplish this testing. Discuss these additional tests and the schedule to complete the tests.
3.
The following requests for additional information are based on the E01 presentation at the April 9, 1997 meeting:
a.
When validating its pressure locking prediction methodology, E01 used a 0.4 friction factor to calculate the required thrust except when test results indicated that the friction factor was greater than 0.4 and then the actual friction factor value was used.
Discuss how the use of a 0.4 friction factor in the E01 pressure i
locking prediction equation accurately validates the E01 pressure j
locking prediction methodology in cases when the actual friction i
factor was significantly less than 0.47 f
ENCLOSURE I
i 4
. - - ~
I O b.
When using actual friction factors, the E01 pressure locking prediction methodology often underestimated the amount of thrust required to open the Westinghouse, Crane and Walworth valves during pressure locking conditions. The methodology consistently under-estimated the amount of thrust required to open the Borg-Warner valve during pressure locking conditions. Explain the basis for the applicability of the E01 pressure locking prediction methodology to all flexible wedge gate valves or for the use of the methodology to specific types of. flexible wedge gate valves.
l c.
Pressure locking test results from the Walworth valve indicated that l
as'the differential pressure between the bonnet and the downstream i
(or upstream) side of the valve increases, the stem thrust required l
to open the pressure locked valve increases. The E01 pressure l
locking methodology predicted that the opposite would occur in that as the differential pressure between the bonnet and downstream (or upstream) side of the valve increased the stem thrust predicted to
)
open the pressure locked valve decreased. Many of the INEEL tests l
involved upstream or downstream pressure of 0 psig or very close to l
0 psig; however, the upstream and downstream pressures were
(
significantly greater than 0 psig in several tests.
E01 stated that l
it does not apply the pressure locking prediction methodology to
-scenarios where upstream or downstream pressure is O psig.
- However, this does not explain why the methodology is not consistent with the test data nor does it resolve the issue when upstream or downstream pressures are present. Why does the E01 pressure locking thrust methodology prediction results conflict with the Walworth valve test results? Discuss if there are any differential pressure restrictions or other conditions associated with the use of the E01 pressure locking prediction methodology.
l l
d.
E01 used results of differential pressure flow tests conducted in response to GL 89-10, " Safety-Related Motor-0perated Valve Testing and Surveillance," to demonstrate that its pressure locking prediction methodology provided conservative approximations.
Discuss how differential flow test results can be used to validate E0I's pressure locking prediction methodology.
e.
The E01 pressure locking prediction model did not account for disk shear forces, vertical downward force on the disk, compression of the disk hub and flexibility of the body and disk.
Discuss why it is not necessary to address these parameters in the E01 pressure locking prediction methodology.
f.
Unwedging force is one of the parameters of the E01 pressure locking prediction methodology.
INEEL testing identified that the force required to unwedge a valve can significantly deviate as the valve is repeatedly stroked closed and then reopened. Discuss how this variance in unwedging force is accounted for in the E01 pressure locking prediction methodology.
i i
. 4.
In the EDI GL 95-07180-day submittal dated February 13, 1996, E01 stated that it was determined by calculation that the following nine valves would operate during a pressure locking scenario:
E12F028A and E12F028B-Containment Spray Valves E12F064C-RHR C Minimum Flow Valve P41F064A-SSW Inlet to Control Room A/C A P41F0648-SSW Supply to CR A/C and ESF Room Coolers B P41F081A-SSW Outlet from Control Room A/C A P41F081B-SSW Return from CR A/C B & ESF RM Coolers B P41F237-SSW Inlet to ESF Room Coolers A P41F238-SSW Outlet from ESF Room Coolers A Provide the pressure locking thrust prediction and actuator capability calculations for the above valves.
5.
In the GL 95-07180-day submittal, E01 stated that shutdown cooling line suction valves E12F006A, E12F008 and E12F009 were classified as non-priority valves, and therefore, not evaluated for pressure locking or thermal binding. These valves are shut during power operation and are required to open to cooldown the unit. Discuss the basis for deciding not to evaluate these valves for pressure locking and thermal binding.
j 1
6.
In the GL 95-07 submittal dated June 28, 1996, E0I st&ted that sixteen normally open valves are shut during surveillances.
E01 modified five of these valves, and evaluated the remaining eleven valves for pressure locking / thermal binding and determined that these valves were acceptable. Are these eleven valves in systems that would be declared inoperable per the Technical Specifications when surveillances are performed on the systems? If not, explain why these valves are not susceptible to pressure locking / thermal binding.