ML20140F639

From kanterella
Jump to navigation Jump to search

Forwards Log Sheet L5-34 Documenting Periodic Checks of Emergency Diesel Generator Rocker Arm Lube Oil Reservoir Level.Encl Should Close Confirmatory Issue 39
ML20140F639
Person / Time
Site: Beaver Valley
Issue date: 03/26/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton, Tam P
Office of Nuclear Reactor Regulation
References
2NRC-6-029, 2NRC-6-29, TAC-62922, NUDOCS 8604010113
Download: ML20140F639 (3)


Text

,.

'Af

~

DuquesneLight 20t,61, 2' Nuclear Construction Oms.on Tomm NuYeb Is'r"Os "

March 26, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Comission Washington, DC 20555 ATTENTION:

Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulations

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Confirmatory Issue 39 Gentlemen:

Attached is a current copy of the log sheet (L5-34) which is used to document periodic checks of the emergency diesel generator rocker arm lube oil reservoir. level.

We bel ieve this evidence should close the subject Confirmatory Issue.

DUQUESNE LIGHT COMPANY

/$l By y

V. Q./Carey (/

Vice President GLB/c1k NR/ CON /ISS39 Attachment cc:

Mr. W. Troskoski, kesident Inspector-w/ attachment Mr. G. Walton, NRC Senior Resident Inspector-w/ attachment 0

3,0 8604010113 8 6

PDR ADOCK 0 2

A P

i

United States Nuclear Regulatory Commission 0

0 Page 0 l C0m0r4 WEALTH OF PENNSYLVANIA SS:

COUNTY OF BEAVER On this J/

day of bl//j

_, [ h

, before me, a Notary Public in and for said Comonwealth and County, personally appeared i

J. J.

Carey, who being duly sworn, deposed and said that (1) he is Vice

! President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his. knowledge.

1]lda k]- NW

/"

Notary Pullic l

MitLA M. FATT0s1. 201ARY PURIC l

mimmerosisom.etAvta Coom l

gY C055tssses ti;1RES OCT. 23.1989 ede, Pennsv%nia Association of Notarise I

l I

1

I W ~.

, n,s+, w s,,. m m.. -.

~,-

B.V.P.S. - 0.M.

2.54.3 DUQUESNE LIGHT COMPANY Beaver Valley Power Station - Unit No. 2 Surveillance Verification Log Operating Mode 1, 2, 3, 4,5*

LS-34 a x-DATE Performed Surveillance No.

(Required every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> unless noted)

Tech.

0000 0800 1600 Spec.

0800 1600 2400 f

,/

6 Check Diesel Generator Rocker Arm lube oil tank for correct oil l

t level.

(To be verified weekly on Sunday mid shift.)

Site lass should be full with the unit of f-c/(f) half full with purp_ cperating s

'N y

D/G A

  • level D/G 3
  • level 5}h Start and run the Motor Driven Rocker Arm Pre-lube Pump for 5 to 30 bg minutes max.

(To be run weakly on Sunday mid shift).

[2 EGO *P23Al m i n': t o s

[2 EGO *P23B1 minutos REMARKS:

/

/

START STOP START STOP START __

0000 - 0800 0800 - 1600 l e U O

.'. )

SOF REVIEW SOF REVIEW 5)f~ks.:

OPERATING DATE SUPERVISOR