Ack Receipt of 860114 & 0311 Ltrs Transmitting Changes to Rev 9 to Plant Radiological Emergency Response Plan.Rev Meets Planning Stds of 10CFR50.47(b) & Requirements of 10CFR50,App E & Acceptable
ML20140F590
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/27/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
References
NUDOCS 8604010098
Download: ML20140F590 (2)


Text

1 s

O MAR 2 71986 Docket No. 50-483 Union Electric Company ATTN: Mr. Donald F. Schnell Vice President - Nuclear Post Office Box 149 - Mail Code 400 -

St. Louis, M0 63166 -

Gentlemen:

This is to acknowledge receipt and review of your letters of January 14 and March 11, 1986, which transmitted changes to the Callaway Plant Radiological Emergency Response Plan (RERP), Revision 9. In addition, a conference call was conducted on February 7,1986, between Mr. M. A. Stiller, Manager, Nuclear Safety and Emergency Preparedness, and members of his staff with Mr. M. P. Phillips, Chief, Emergency Preparedness Section, and Mr. J. P. Patterson of my staff, to discuss proposed changes in the Callaway RERP.

We have now completed our review of the submitted changes and have determined that Revision 9, of your Callaway RERP, continues to meet the planning standards of 10 CFR 50.47(b) and the requirements of 10 CFR Part 50, Appendix E. Based on our review, we have concluded that this revision meets the requirements of 10 CFR 50.54(q) and does not decrease the effectiveness of the plan.

Be advised that 10 CFR 50.54(q) also requires prior NRC approval of any changes to your plan which may decrease the effectiveness of the plan. However, if your safety review assures no decrease in emergency preparedness effectiveness, then changes to the plan may be made and implemented without prior NRC approval. In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Docurrent Room.

\D q-@b EL 9604010090 860327 pW pH PDR ADOCK 05000403 p PDR o

Union Electric Company 2 MAR 2 71986 Should you have any questions concerning this letter, please contact Mr. James P. Patterson of my staff at (312) 790-5536.

Sincerely, Wginal signed by ED. Shafer" W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch cc: A. P. Neuhalfen, Manager Quality Assurance S. E.'Miltenberger, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Region IV K. Drey Chris R. Rogers, P.E.

Utility Division, Missouri Public Service Commission SNUPPS D. Matthews, EPB, OIE W. Weaver, FEMA, Region V l

T bh

  • RIII RIII RIII RI pLB -

u3.C5 pfeY Patte son /kst Snell Forney feg gva es

.