Discusses Timeliness of 970508 Submittal of PECOs Third 10-yr IST Program & 970523 Submittal of License Change Application 96-02324.Requests Rev of Dates to Allow for 6 Months of Review Time
ML20140E800
Person / Time
Site: Peach Bottom  
Issue date: 06/04/1997
From: James Shea
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9706120206
Download: ML20140E800 (4)


Text

'

[

f**%

i acMrh? {A

}

i i

k UNITED STATES

[

]

NUCLEAR REGULATORY COMMISSION c)[

2 WASHINGTON, D.C. 20666-0001 June 4, 1997 i

l Mr. George A. Hunger, Jr.

I Director-Licensing, MC 62A-1 PECO Energy Company l

Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195 l

l

SUBJECT:

RECENT LICENSING APPLICATIONS, PEACH BOTTOM ATOMIC POWER STATION, i

UNITS 2 AND 3

Dear Mr. Hunger:

On May 8, 1997, PECO Energy Company (PECO) submitted for NRC review its third 10-year in service testing (IST) program.

The staff received its copy of the submittal from the NRC mailroom on May 29, 1997.

In the submittal, PECO requests NRC approval of the program by September 1,1997 in light of the fact l

that the second 10-year IST interval concludes on November 4,1997.

The amount of time allowed for NRC review based on PEC0's requested September 1, 1997 date is less than 4 months.

On May 23, 1997, PEC0 submitted License Change Application 96-02324 regardirig exclusion of main steam isolation valve leakage from local leak rate test i

totals.

In the submittal, PEC0 requested that the staff review and approve l

the license change by August 29, 1997, providing for a staff review time of approximately 3 months.

The staff observed that this issue was the subject of an exemption request that was discussed by the staff and PEC0 from 1976 to l

1991 without resolution.

l Although PEC0 has generally provided timely submittal of its licensing actions in the recent past, the two examples cannot be considered timely.

The staff l

will endeavor to meet the requested review date for the IST program.

PECO is l

requested to provide an adequate basis for the requested August 29, 1997 approval date for LCA 96-02324 or is requested to revise the date to allow for at least 6 months review time.

PECO is requested to generally allow 6 EC FILE CEMER COPY

[

110059 7 p 970612O206 970604 P

PDR ADOCK 05000277 P

PDR

l 1

l l

l

\\

G. Hunger, Jr. review of license amendments and other licensing actions, especially those desired to support planned refueling outage related activities.

If you have any questions on this matter, please do not hesitate to call me at (301) 415-1428.

Sincerely,

/S/

Joseph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II j

Office of Nuclear Reactor Regulation Docket Nos. 50-277/278 cc: See next page DISTRIBUTION:

Docket File M0'Brien Alohmeier, RI PUBLIC JShea ACRS PDI-2 Reading OGC JStolz SVarga MModes, RI I

I 0FFICE PDied/J.ky PDI-2/[Ml PDl-2/D NAME M0'hifeb JSheT N N JStk DATE U/Ml/97 t_../3h7 b/)/97 0FFICIALREC0JlDCOPY DOCUMENT NAME: g:\\SHEA\\ PEACH \\PBTIME.LTR 1

l l

4 4

i i

G. Hunger, Jr. -

l months for review of license amendments and other licensing actions, especially those desired to support planned refueling outage related activities.

If you have any questions on this matter, please do not hesitate to call me at (301) 415-1428.

sin rely,

) (l

)

L m

Joseph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277/278 cc:

See next page i

l l

l l

k I

i i

4

~.

l Mr. George A. Hunger, Jr.

Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 i

cc:

l J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety l

Sr. V.P. & General Counsel PA Dept. of i

PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors i

l Peach Bottom Atomic Power Station Peach Bottom Township l

1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Er.gineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean i

U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources l

Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 l

Department of Environment l

201 West Preston Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service Electric and Gas Company A. F. Kirby, III P.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No. 195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314 3

1

!