Text
s
.
.
JAN 2 71986
Docket Nos. 70-3014
License Nos. SNM-1950
50-423
CPPR-113
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Combined Inspection Nos. 70-3014/85-01 and 50-423/85-70
This refers to the routine safeguards inspection conducted by Mr. A. Della Ratta
of this office on November 12-15, 1985, at Northeast Utilities Service Company,
Berlin, Connecticut, and Millstone Nuclear Power Station, Unit 3, Waterford,
Connecticut, of activities authorized by NRC License Nos. SNM-1950 and CPPR-113
and to the discussions of our findings held by Mr. Della Ratta with Mr. W. D.
Romberg and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed
In accordance with 10 CFR 2.790(a), a copy of this letter and the encicsure
-
will be placed in the NRC Public Document Room.
No reply to this letter is required. Your cooperation with us is appreciated.
,
Sincerely,
~Qginal Signed Byi
'
Richard R. Keimig
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
_.
Enclosure: Combined NRC Region I Inspection Report Nos. 70-3014/85-01,
50-423/85-70
.
OFFICIAL RECORD COPY
IR MILL 3 85-70 - 0001.0.0
01/10/86
lff
k
f
'
. ' .
G
.
.
Northeast Nuclear Energy Company
2
JAN 2 7 G86
cc w/ encl:
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
G. Walton, SRI, Beaver Valley Unit 2
T. Shedlosky, SRI, Millstone 1&2
E. Doolittle, LPM, NRR
RI:DRSS( I-
RI-
S
RI.
RI:D SS
Della Ratta/fi
Keimig
Joy er
Ma in
01/4//86
01/.a>/86
01/Ja/86
0/
86
0FFICIAL RECORD COPY
IR MILL 3 85-70 - 0002.0.0
01/10/86
.