Forwards Safeguards Insp Repts 50-277/85-43 & 50-278/85-43 on 851125-27.No Violation Observed
ML20140E171
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/27/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20140E174 List:
References
NUDOCS 8602030197
Download: ML20140E171 (2)


See also: IR 05000277/1985043

Text

O O

.

  • *

JAN 2 71986

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Nos. 50-277/85-43 and 50-278/85-43

This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey

of this office on November 25-27, 1985 at the Peach Bottom Atomic Power

Station, Delta, Pennsylvania of activities authorized by NRC License Nos.

OPR-44 and DPR-56 and to the discussions of our findings held by Mr. Bailey

with Mr. R. S. Fleischmann at the conclusion of the inspection. This also

refers to subsequent telephone discussions between Mr. Bailey, Mr. S. Thorpe

and Mr. J. Oddo on December 13,16, and 17,1985.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the violations

brought to your attention in letters dated May 7, July 25,1984, and May 7 and

July 17,1985. We have no further questions regarding your actions at this

time.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Or161nal SiEned By:'

RichardR.Keimig

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

0FFICIAL RECORD COPY CIR PB 85-43 - 0001.0.0

01/14/86

8602030197 B60127 [ 7*

PDR

G

ADOCK 05000277-

PDR I l I

L h,

'

-

. . . - . _ -- -- _

O O

,

' '

Philadelphia Electric Company 2 JAN 2 71986

Enclosure: Combined NRC Region I Inspection Report Number 50-277/85-43 and

50-278/85-43

cc w/ encl:

R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

J. D. McGoldrick, Manager, Claims Division, Legal Department

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

Eugene J. Bradley, Esquire, Assistant General Coursel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

i

!

RIt 0 R SS I SS R SS

Bailey /gcb K imi J ner M n

1/.22/86 /~U " /-2.s. A

0FFICIAL RECORD COPY CIR PB 85-43 - 0002.0.0