ML20140E162
| ML20140E162 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/11/1997 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20140E159 | List: |
| References | |
| NUDOCS 9704250104 | |
| Download: ML20140E162 (3) | |
Text
-..
. _~
\\
~
s 2
8.
Unservicuble dsscribas tha condition of a tubs if it leaks or contains a defect large enough to affect its structural integrity in the event of an Oparating Basis Earthquake, a
loss-of-coolant accident, or a steam line or feedwater line
]
break as specified in Specification 4.18.4.c.
I l
9.
Tube Inspection means an. inspection of the steam generator tube from the point of entry completely to the point of exit.
b.
The steam generator shall be determined operable after completing the corresponding actions (plug or sleeve all tubes exceeding the plugging limit and all tubes containing through-wall cracks) f required'by Table 4.18-2 with the following exceptiont j
~
Tubes with intergranular attack indicatilons within the upper tube j_
sheet with the potential of through-wall depths greater than the plugging limit may remain in service for the remainder of cycle 14.
1
}.
-)
4 a
t W
e i '
9704250104 97041'1 P PDR ADOCK 05000313i P
PDR 'il Amendment'No. 24,44,84, M6, H4, 110ml
4 8
e b
6 e
e O
w f
PROPOSED TECHNICAL SPECIFICATION CHANGES 9
J 8.
Uncarvic,cbin da cribas tho c:nditien of a tuba if it 1seks er c:ntoins o d2fset lcrga annugh to offset ite structurcl e
integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam 11ne or feedwater line i
break as specified in Specification 4,18.4.c.
t l
9.
Tube Inspection means an inspect. ion ct th: steam generator tube from the point of entry completely to the point of exit.
b.
The steam generator shall be determined operable after completing the corresponding actions (plug or sleeve all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 4.18-2,with the followina exception:
Tubes with interaranular attack indications within the upper tube sheet with the potential of throuch-wall depths creater than the pluccina limit may remain in service for the remainder of evele 14.
i i
i i
k Amendment No. M,44,M,M4,M4, 110ml