ML20140D862

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Compliance Rept - Reg Guide 1.97 (Rev 3), Per Suppl 1 to NUREG-0737
ML20140D862
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/11/1984
From: Spangenberg F
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20140D867 List:
References
RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 U-0767, U-767, NUDOCS 8412190232
Download: ML20140D862 (1)


Text

'

U-0767 L30-84(12-11)L 1A.120 ILLINOl8 POWER COMPANY CLINTON POWER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 December 11, 1984 Docket No. 50-461 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing

.U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Clinton Power Station Unit 1 Response to Conformance Report - Regulatory Guide 1.97

Dear Mr. Schwencer:

This letter is in response to your letter dated November 14, 1984, which transmitted the report "Conformance To Regulatory Guide 1.97, Clinton Power Station Unit No. 1." Enclosed please find Revision 1 of our Compliance Report on Regulatory Guide 1.97. This revision incorporates clarifications to the drywell sump level and drywell drain sump level instrumentation, and commitments to environmentally qualify the fuel zone water level instrumentation and to provide Class 1E power for this instrumentation before the startup after the first refueling outage.' With the exception of the design changes related to the fuel-zone water level instruments identified above, and except where noted elsewhere in this report, compliance with Regulatory Guide 1.97, Rev. 3, will be complete prior to initial fuel load.- Other changes include: 1) the incorporation of Section 4 as notes to the tab _le in Section 3: 2) updates based upon purchases of equipment; and 3) the exception of the CRT display'for noble gas effluent monitoring and vent discharges.

Changes incorporated in this revision are denoted by a revision bar in

! the right hand margin. Based on these commitments, it is our understanding that we satisfactorily implement the requirements of-Regulatory Guide 1.97.

Sincerely ,

t .

o Frank A. ang erg j

Director - Nuc ar Lic naing and Configuration Management

[_

RTR/ lam Attachment cc: B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office Regional Administrator, Region III USNRC Illinois Department of Nucicar Safety g I

8412190232 841211 fDRADOCK0500o44,3 PDR l(%j.