ML20140D527
| ML20140D527 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/14/1984 |
| From: | Hunter D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Spence M TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20140D532 | List: |
| References | |
| NUDOCS 8412180558 | |
| Download: ML20140D527 (2) | |
See also: IR 05000445/1984037
Text
-
~
p
L
-
~DmG
'
.
DEC 141984
"
=
-
In Reply Refer To:
-
--
Docket:
50-445/84-37
L
F
H
E
'
Texas Utilities Electric Company
~
f
ATTN:
M. D. Spence, President, TUGC0
Skyway Tower
400 North Olive Street
Lock Box 81
_ Dallas, Texas 75201
Cwntlemen:
This refers to the inspection conducted by Mr. R. A. Caldwell and
Ms. C. Abigail Evans of this office during the period September 24 -
October 12, 1984, of activities authorized by NRC Construction Permit CPPR-126
for Comanche Peak Steam Electric Station, and to the discussion of our findings
3,' .>
with Mr. n.
Jones and other members of your staff at the conclusion of the
'
inspection.
_
Areas examined during the inspection included the security plan and
j
implementing procedures. Within these areas, the inspection consisted of
p
selective examination of procedures and representative records, interviews
[
with perscanel, and observations by the inspectors. These findings are
g
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
s
identified.
(I
The material enclosed herewith contains Safeguards Information as defined by
3
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
.-
'
material, with the exception of the report cover page which is an inspection
surrrnary, will not be placed in the Public Document Room,
k
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
-
=
-
_
8412180558 841214
DR ADOCK 05000
Origir.al S10Md W
D. R. Hunter, Chief
_
Reactor Project Branch 2
-
b
Enclosure:
.
-
Appendix
NRC Inspection Report
necLOSURS CmtrAINS
_
_
[
50-445/84-37
sAnm1ARDS IKTOW.ATION.
EN EZPARATION TifIS
\\
I
.
i
g
cc: (see page 2)
er. ts Dscomouso,
i
m
3'
ell /jj/
NMS&SQ[k.
D
PSA/@ RPBQd
DR P
-
NM
vans
RJEveA
R8
t
DHunnicutt DHunter RPDenise
A /F[/84
// //t[/84
h / b/84
[.S/t/84(>
lS/L,/84 fyej /84 \\v/
84
"
E
^'Is&
.
=
.
,
Texas Utilities Electric Company
-9-
cc w/ summary page:
Texas Utilities Electric Company
Texas Utilities Electric Company
ATTN:
B..R. Clements, Vice
ATTN:
H. C. Schmidt, Manager
President, Nuclear
. Nuclear Services
Skyway Tower
Skyway Tower
400 North Olive Street
400 North Olive Street
Lock Box 81
Lock Box 81
Dallas, Texas 75201
Dallas, Texas 75201
bcc: -Copy of entire report maintained in RIV Security File and sent to:
John G. Davis, Director, NMSS
SSPB/NRC:NRR
IE File
Resident Inspector (0PS Only) (w/766)
bec: DMB - IE-04 - Letter and Inspection Summary only (w/out 766)
bec:
RIV - Letter and Inspection Summary only w/766:
RPB1
Lic Fee File
RPB2
MIS System
NMS&SB
RIV File
D. Hunnicutt, Task Force Resident Inspector (CONS)
R. Denise, DRSP
bec:
RIV - Letter and Inspection Summary only w/out 766:
R. Martin (Letter Only)
R. Bangart
TX STATE DEPT. OF HEALTH (1tr head)
Juanity Ellis (1tr head)
Renea Hicks (1tr head)
S. Treby, ELD
C. Wisner, PA0 (1tr head)
Billie Pirner Garde (1tr head)
V. Noonan, NRR
38@DSURE 00errAing
sAmunns zwanurtrog,
N SEPARATION MIS
PAGE IS DECOWm0LIiED.
_ _ _ _ -
_ - _ - _ _ _ _ _ _ _ _