Forwards SALP Repts 50-266/84-09 & 50-301/84-07 for Apr 1983 - Sept 1984.Performance Acceptable
ML20140D485
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/12/1984
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Britt R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20140D488 List:
References
NUDOCS 8412180546
Download: ML20140D485 (2)


See also: IR 05000266/1984009

Text

,

NnB

,-

.

DEC 121984

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. R. W. Britt

President and Chief Operating Officer

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

Enclosed for your review, prior to our scheduled meeting of December 18, 1984,

is the SALP Board Report for Point Beach, Units 1 and 2, covering the period

April 1, 1983 through September 30, 1984.

Regulatory performance at the Point Beach Nuclear Plant was considered to be

acceptable during this assessment period. Four functional areas were given a

Category 1 rating; this represents an improvement in two of these areas,

Security and Licensing Activities. The remaining six areas were given a

Category 2 rating, representing a decline in the rating for the area of

Maintenance while the other areas remained the same. We recognize that major

plant modifications were carried out during this rating period. We were

favorably impressed by the planning and conduct of these modifications. Based

on the category ratings and recognizing the major modification activities, we

conclude that overall performance improved during this rating period.

While you will have sufficient opportunity to present your comments at the

meeting on December 18, 1984, we also solicit written comments within 30 days

after the meeting to enable us to thoroughly evaluate your comments and

provide you with our conclusions relative to them.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

4

Report will be placed in the NRC's Public Document Room.

,

050 k

PDR

\N 3

9;

- -. _ - _ .- __

.

r

}' b

Wisconsin Electric Power Company  ?

'

DEC 12 W -

Should you have any questions concerning the SALP Report, we would be pleased

to discuss them with you.

Sincerely,

" Original Signed by A. Bert Davis"

for

James G. Keppler

Regional Administrator

.

4

Enclosure: SALP 4 Board Report

No. 50-266/84-09; 50-301/84-07

cc w/ enc 1:

J. J. Zach, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duf fy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Commission

R. C. DeYoung, IE

H. R. Denton, NRR

INPO

Regional Administrators

RI, RII, RIV, RV

,

I

f

'

RII RII RIII RIII RI I RI I R ll I RIII RIII

hs N pf lb ( d

P on/kja 5 1binz Burgess k w Shafer Nore 1y9 essard k is Kepgler

/ /84 .tlet 12 lti 6("

2

  1. 2fil p(f 1/L 81-f y

/

y - -w