June 2, 1997
i
l
South Carolina Electric & Gas Company
ATTN: Mr. Gary J. Taylor
'
Vice President. Nuclear Operations
i
Virgil C. Summer Nuclear Station
P. O. Box 88
.
Jenkinsville, SC 29065
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-395/97 03
'
i
Dear Mr. Taylor:
)
On May 3,1997, the NRC completed an inspection at your V. C. Summer reactor
i
facility. The enclosed report presents the results of that inspection.
,
,
During the 6 week period covered by this inspection period, your conduct of
3
activities at the V. C. Summer facility was generally characterized by safety
j
conscious operations and work practices and conservative decision making
-
!
i
involving plant restart. We are concerned, however, about the violations of
i
NRC requirements that were identified. The first violation was a repeat
i
violation for a failure to follow procedural requirements for the control of
reactor building pressure. The second violation involved a failure to
establish appropriate procedures for control of steam generator level and for
,
operator response to a turbine trip on a high steam generator level.
These violations are cited in the enclosed Notice of Violation (Notice), and
the circumstances surrounding the violations are described in detail in the
4
j
enclosed report.
Please note that you are required to respond to this letter
i
and should follow the instructions specified in the enclosed Notice when
4
preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
j
with regulatory requirements.
4
Repetitive violations are addressed in the NRC's " General Statement of Policy
and Procedures for NRC Enforcement Actions " (Enforcement Policy). NUREG 1600.
.
Section IV.B. The Enforcement Policy allows the severity level of a violation
to be increased if the violation can be considered repetitive.
For exam)1e, a
Severity Level IV violation could be increased to Severity Level III wit 1 the
attending escalated enforcement action. However, in this case, we have
- decided not to increase the severity level of this violation based on the low
l
safety significance of this event and the performance of the staff once the
problem was identified.
090024
$
4
~
~
9706100376 970602
'
ADOCK 05000395
\\
(
-
\\
G
'
ft.Dl
-.
._ .-
-_
_ _ .__ __ _ _ .._ _ _
SCE&G
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
Original signal by George A. Belisle
George A. Belisle, Chief
Reactor Projects Branch 5
Division of Reactor Projects
Docket No. 50 395
License No. NPF-12
Enclosures:
2. NRC Inspection Report
cc w/encls:
R. M. Fowlkes. Manager
R. J. White
Operations
(Mail Code 303)
i
Nuclear Coordinator (Mail Code 802)
South Carolina Electric & Gas
S.C. Public Service Authority
Company
c/o Virgil C. Summer Nuclear Station
Virgil C. Summer Nuclear Station
P. O. Box 88
P. O. Box 88
Jenkinsv111e, SC 29065
Jenkinsville, SC 29065
J. B. Knotts, Jr., Esq.
April Rice, Manager
i
Winston and Strawn
Nuclear Licensing & Operating
1400 L Street, NW
Ex)erience
(Mail Code 830)
Washington, D C.
20005 3502
Sout1 Carolina Electric & Gas
)
Company
Chairman
Virgil C. Summer Nuclear Station
Fairfield County Council
P. O. Box 88
P. O. Drawer 60
Jenkinsville, SC 29065
i
Winnsboro, SC 29180
Virgil R. Autry, Director
Radioactive Waste Management
Bureau of Solid and Hazardous
Waste Management
,
S. C. Department of Health
and Environmental Control
2600 Bull Street
<
Columbia, SC 29201
i
A
g
SCE&G
3
Distribut' ion w/encis-
i
A. Johnson, NRR
R. Gibbs, RII
Y
- P. Fillion,- RII-
D. Jones, RII
W. Stansberry, RII
i
R. Aiello, RII
'PUBLIC
'
NRC Resident Inspector
)
U.S. Nuclear Regulatory Comission
Route 1, Box 64
Jenkinsville SC 29065
i
l
i
i
!
i
!
i
1
,
!
,
- See previous concurrence - attached
pli Ne
nrrier
pit non
p11 000
pf f rpp
pit. ops
SIGNATURE
j
(
NAME
LGarner alt
BBonser
ifarnholt2
DJones
ryc
]
Ob0F 7
DATE
06 / eat, / 97
06 /
/ 97
06 /
/ 97
06 /
/ 97
/9
06 /
/ 97
/ [$ ) NO
YES
NO
VES
NO
YES
NO
[YES }
NO
YES
NO
f
COPY?
,
ve r iu AULWho WPt
uuCUMLM WNu 6 n5dM970J.hF i
(V
i
1l'
i
'
_ . . _
-.
__
_.
_ _ _ - _ . _ _ . - . _ _ . . _ . _ _ _ _ _
_ - . . _ .
_ _ . _
_ _ - .
- _ . _ . .
FRI,- @ Y-80-97 2:0 EPM
SUMMER
8033455837
P.22
l
!
'
,
,
P
'
SCE&G
3
,
-
.
Distribution w/encls:
/
!
A. Johnson. E R
l
R. Gibbs, RII
,'
P. Fillion. RII
!
'
D. Jones, RII
4
I
W. Stansberry, RII
R. Aiello, RII
PUBLIC
l
'
!
,
NRC Resident Inspector
'
U.S. Nuclear Regulatory Commission
!
+
Route 1, Box 64
>
Jenkinsville, SG 29065
i
l
!
!
T
l
'b
i
1
l
!
.
mar
.
[
@StorterW
.
BWTC
j
""
i
TP3W t2
DJones
RAME
LGarrer p 4
kit
05 / [ / 97
05 /M/ 97
C5 4%O/ 97
05 /
/ $1
fB /
/ 97
06 /
/ 97
l
ewn
ns/
ie
ns
(g)
ns
diiD
ns
ac
ns
a
'n
'o
grPJL4 ( M 'VKW (VFT
LAlw#L41 MN b;\\b#ilf/'JJ.f FI
TOTAL P.22
,
!
.
_
_
_
!
,
SCE&G
3
Distribution w/encls:
A. Johnson, NRR
R. Gibbs, RII
P. Fillion, RII
D. Jones, RII
'
W,. Stansberry. RII
'
-
R. Aiello, RII
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 64
Jenkinsville, SC 29065
i
4
l
1
l
.
i
.,,,a
_ ,,,
.,_
, , , . .
,,, ,.
, , , , , ,
SIGNATURE
-
!
hAME
LGarrer alt
BBonser
Trarnnoltz
DJories '
BURYC
DATE
05 /
/ 97
05 /
/ 97
05 /
/ 97
05 /jr0 / 97
05 /
/ 97
05 /
/ 97
COPY?
YES
NO
YES
NO
VES
NO
[h
NO
YES
NO
VES
NO
j
uie1CiAt htLORD Lurl
DOLUMLNi NAML: 6; GUM 1/U ,.Kr'i
i
l
l
l
1
l
l
!