ML20140D317
| ML20140D317 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/15/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kingsley O MISSISSIPPI POWER & LIGHT CO. |
| References | |
| NUDOCS 8601290264 | |
| Download: ML20140D317 (1) | |
Text
$)s U N January 15, 1986 Mississippi Power and Light Company vATTN: Mr. O. D. Kingsley, Jr.
Vice President, Nuclear Operations P. O. Box 23054 Jackson, MS 39205 Gentlemen:
SUBJECT:
MPL OPERATIONAL QUALITY ASSURANCE MANUAL (MPL-TOP-1A)
Your letter to this office (AECM-85/0639) dated November 15, 1985, transmitted proposed organizational changes to Revision 4 of the Mississippi Power and light Operational Quality Assurance Manual (MPL-TOP-1A) for the Grand Gulf station (Docket No. 50-416).
Our review of this information indicates that the proposed changes to Revision 4 of MPL-TOP-1A continue to satisfy 10 CFR 50 Appendix B requirements and are therefore acceptable.
We appreciate your prompt response to supply information required by 10 CFR 50.54(a).
Please contact us if you have questions concerning this letter.
Sincerely, (original signed by VBrownlee)
Roger D. Walker, Director Division of Reactor Projects cc:1 Tf H. Cloninger, Vice President, Nuclear Engineering and Support vs. E. Cross, General Manager V. F. Dale, Director, Nuclear L
Licensing and Safety LR. T. Lally, Manager of Quality Assurance Middle South Services, Inc.
R. B. McGehee, Esquire p
Wise, Carter, Child, Steen and Caraway d S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell (R(&Reynolds W. Jackson, Project Engineer IC'. R. Hutchinson, GGNS General Manager bec: Ld. W. Gilray, IE G. A. Belisle, RII M. F. Runyan, RII LNRC Re ident Inspector Document Control Desk State Mississippi RII RII R
RI RII RIL W
Mf C
%D i
MRunyan:btm Ghelisle lian A8 b on HDance VPrnciera 1
86 1/4/86 1/j)/86 1/g/86 1/ /86 1/g/86 8601290264 860115 3
ADOCK 050 g 6 DR j
56 W j