Discusses 970417 Undated Ltr Requesting NRC Review on Exigent Basis,Proposed Change to TS 3.8.1, AC Sources - Operating. NRC Staff Does Not Plan to Review on Exigent Basis Unless Info Required by 10CFR50.91(a)(6)(iv) Provided
ML20140D129
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/18/1997
From: Bateman W
NRC (Affiliation Not Assigned)
To: Nunn D
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 9704220245
Download: ML20140D129 (4)


Text

- ~~

p

[ %4 UNITED STATES j

l 1 g NUCLEAR REGULATORY COMMISSION l t WASHINGTON, D.C. 20066-0001

% * * * * * ,o April 18, 1997 [#- M 99 2 2 Mr. Dwight E. Nunn Vice President Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 i

San Clemente, California 92674-0128

SUBJECT:

REVIEW OF PROPOSED TECHNICAL SPECIFICATION APPLICATION ON AN EXIGENT BASIS

Dear Mr. Nunn:

The staff received an undated letter from you on April 17, 1997, requesting that the NRC review on an exigent basis a proposed change to Technical Specification (TS) 3.8.1, "AC Sources - Operating." The proposed change would I

permit the unit auxiliary transformer for one unit to be credited as the l alternate offsite power source required by TS 3.8.1 for the opposite unit i without either performing an actual transfer of the safety-related buses while the affected unit is operating, or declaring the affected unit's alternate offsite power source inoperable.

Part 50.91 of Title 10 of the Code of Federal Regulations (10 CFR), " Notice for public comment; State consultation," outlines the procedures and requirements the Commission follows for an application requesting an amendment to an operating license. The preferred method of processing such amendment requests (when a proposed determination that no significant hazards consideration is made) is to publish in the Federal Reaister an individual notice of proposed action for an amendment and allow a 30-day public comment period. When the Commission finds that exigent circumstances exists, in that a licensee and the Commission must act quickly and that time does not permit the Commission to publish a Federal Reaister notice allowing 30 days for prior public comment, and it also determines that the amendment involves no significant hazards considerations, 10 CFR 50.91(a)(6) allows the staff to utilize shorter periods of time for public comment. However, 10 CFR 50.91(a)(6)(iv) requires the licensee to explain the exigency and why the licensee cannot avoid it. This section further states that the Commission will use the~ normal public notice and comment procedures if it determines that the licensee has failed to use its best efforts to make a timely application for the amendment.

The staff notes that Southern California Edison personnel became aware of this issue and the need to modify the TS to allow use of the unit auxiliary transformer as an alternate source of offsite power, on January 16, 1997.

Your April 15, 1997, letter does not provide any explanation as to why it took three months to submit a TS amendment for the staff's review, nor does your letter explain the need for exigent action. Therefore, the staff does not plan to review on an exigent basis your proposed TS application unless the information required by 10 CFR 50.91(a)(6)(iv) is provided on the docket. \

Q 9764220245 97041e PDR

'ADOCK OSOOg1 (, ggy

.- .. - - = . . _- - - -

i Mr. Dwight E. Nunn April 18,1997 If you have any questions on the staff's actions regarding this matter, you 4

can contact me at (301) 415-1372. l Sincerely, ORIGINAL SIGNED BY l l

William H. Bateman, Project Director Project Directorate IV-2 Division of Reactor Projects III/IV i Office of Nuclear Reactor Regulation Docket Nos. 50-361 DISTRIBUTION: .

and 50-362 Docket File l PUBLIC cc: See next page PDIV-2 Reading JRoe EAdensam WBateman MFields EPeyton ACRS, TWFN OGC, 013B18 KPerkins, WCF0 AHowell, RIV DOCUMENT NAME: EXIGENT.LTR OFC PDIV-21PM PDIV-2/LA PDIV-2/D ,n NAME ddE:ye Efey}E WBatema h DATE 4//#797 4/17/97 4/10/97 ,

0FFICIAL RECORD COPY

t 4

s Nr. Dwight E. Nunn April 18, 1997 If you have any questions on the staff's actions regarding this matter, you can contact me at (301) 415-1372.

Sincerely, 1

i William H. Bateman, Project Director  !

Project Directorate IV-2 l Division of Reactor Projects III/IV i Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 t

cc: See next page f

k E Mr. Dwight E. Nunn April 18, 1997 cc:

. Mr. R. W. Krieger, Vice President Resident Inspector / San Onofre NPS Southern California Edison Company c/o U.S. Nuclear Regulatory Commission San Onofre Nuclear Generating Station Post Office Box 4329 P. O. Box 128 San Clemente, California 92674 San Clemente, California 92674-0128 Mayor

!. Chairman, Board of Supervisors City of San Clemente

County of San Diego 100 Avenida Presidio 1600 Pacific Highway, Room 335 San Clemente, California 92672 San Diego, California 92101 l

, Mr. Harold B. Ray j i~

Alan R. Watts, Esq. Executive Vice President '

Woodruff, Spradlin & Smart Southern California Edison Company-  ;

. 701 S. Parker St. No. 7000 San Onofre Nuclear. Generating Station i Orange, California 92668-4702 P.O. Box 128 i

San Clemente, California 92674-0128 Mr. Sherwin Harris i Resource Project Manager a Public Utilities Department l' City of Riverside l 3900 Main Street Riverside, California 92522 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management ,

California Department of Health Services l P. O. Box 942732  !

Sacramento, California 94234-7320 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Terry Winter Manager, Power Operations San Diego Gas & Electric Company P.O. Box 1831  :

San Diego, California 92112-4150 '

Mr. Steve Hsu Radiologic Health Branch State Department 'of Health Services Post Office Box 942732 Sacramento, California 94234