~ _ _..
y+
1
?'
l fJune 7, 1984-Docket Nos. 50-213, 245, 336,[423 LS05-84-06-012 Mr. W. 'i. Counsil, Vice President Nuclear' Engineering And Operations Connecticut Yankee Atomic Power Company.
and Northeast Nuclear Energy Company:
Post Office Box 270 Hartford, Connecticut - 06141
Dear Mr.' Counsil:
SUBJECT:
. ALTERNATE LOCATION FOR CERTAIN EMERGENCY OPERATIONS FACILITY (EOF)
Re:
Millstone Units 1,- 2, and 3 - Haddam Neck Nuclear Power Plant This letter responds to your. letter of February 3,:1984 with regard to the establishment of a consolidated alternate location for certain Emergency.
Operations Facility (EOF) functions in the Corporate Emergency Operations Center in Berlin, Connecticut for both the Millstone Nuclear-Power Station -
and the Haddam Neck Plant. This center is located approximately 20, miles from"the Haddam Neck Plant and approximately ~40 miles from the Millstone Nuclear Power Station.
You are hereby advised that the Commission' finds-that your position 1s-
. r.ceptable with regard to the location of this alternate facility for.both plant sites. Approval of the other features of this facility as well as the approval of your other Emergency Respcnse Facilities (ERFs) for both plants will be determined during post implementation appraisals to be 1
conducted at the Haddam Neck and Millstone plant: sites by the NRC_when all your ERFs have been completed.
- Sincerely, rn-teln M G won G. -
e r
Darrell G. Eisenhut, Director. '
. Division of Licensing-4
_ Office of. Nuclear Reactor Regulation _-
b55T
- TDltpage,
- 0RB #5 Reading
'SEP8 6
ACRS(10)
/
-Local PDR ELJordan
~NRC PDR-
'JNGrace
.NSIC'
~
s
'DCrutchfield.1
.LA JLyons.
JShea-
~
=KHeit '
\\.BDooli.ttle $
OELD:
DL:
'#5iDL:
- 5 DL 18,#5 D
1 DL:0RB #3 DL:
JLy
- jc cJSh3 MCrutchfield B tle.KHeitner ia - D 6 ///84
& /5 /84 j ' (o/p /84, lo/
84-(o/S/84 6 84
}/84" 3
,; B406190605 840607 3 PDR ADOCK 05000213 F.
- PDR,
~
. [@;.A #fCgIo UNITED STATES 4
y?s,. < l' g NUCLEAR REGULATORY COMMISSION g
g E
WASHINGTON, D. C. 20555
,8, June 7, 1984
....+
Docket Nos.
50-213, 245, 336, 423 LS05-04-06-012 Mr. W. G. Counsil, Vice President Nuclear Engineering And Operations Connecticut Yankee Atomic Power Company and Northeast Nuclear Energy Company Pest Office Box 270 Hartford, Connecticut 06141
Dear fir. Counsil:
SUBJECT:
ALTERNATE LOCATION FOR CERTAIN EMERGENCY OPERATIONS FACILITY.
(E0F)
Re:
Millstone Units 1, 2, and 3 - Haddam Neck Nuclear Power Plant This letter responds to your letter of February 3,'1984 with regard to the estcalishment of a consolidated alternate location for certain Emergency Operations Facility (EOF) functions in the Corporate Emergency Operations Center in Berlin, Connecticut for both the Millstone Nuclear Power Station and the Haddam Neck Plant. This center is located approximately 20 miles from the Heddam Neck Plant and approximately 40 miles from the Millstone Nuclear Power Station.
Youarahr.ebyadvisedthattheCommissionfindsthatyourposition1[
acceptable with regard to the location of this alternate facility for both plant sites. Approval of the other features of this facility as well as the approval of your other Emergincy i.asponse Facilities (ERFs) for both plants will be determined during post implementation appraisals to be conducted at the Haddam Neck and Millstone plant sites by the NRC when all your ERFs have been completed.
Sincerely, s
a E s hhu or Division of Licensing Office of Nuclear Reactor Regulation cc: See next page r
i D
June 7, 1984 Mr. W. G. Counsil Arthur Heubner, Director cc Gerald' Garfield, Esquire Radiation Control Unit
^
Day, Berry & Howard Department of Environmental Counselors at Law Protection One Constitution Plaza State Office Building Hartford, Connecticut 06103 Hartford, Connecticut 06115 John F. Opeka Board of Selectmen Vice President, Nuclear Operations.
Town Hall Northeast Utilities Service Company Haddam, Connecticut 06103 Post Office Box 270 Hartford, Connecticut 06141 Superintendent Haddam Neck Plant State of Connecticut RFD #1 Office of Policy and Management Post Office Box 127E 06424 ATTN: Under Secretary Energy East Hampton, Connecticut Division 80 Washington Street Resident Inspe.ctor Hartford, Connecticut 06115 Haddam Neck Nuclear Power Station c/o U.S. NRC U.S. Environmental Protection Agency East Haddam Post Office East Haddam, Connecticut 06423 Region I Office ATTN: Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Dr. Thomas E. Murley, Regional Administrator Nuclear Regulatory Commission, Region I 631 Park Avenue 19406 King of Prussia, Pennsylvania Northeast Nuclear Energy Company ATTN:
Superintendent Millstone Plant
.P. O. Box 128 Waterford, Connecticut 06358 Resident Inspector c'/o U.S. NRC Millstone Plant P. O. Box 811' Niantic, Connecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385-
^
w