ML20140C800

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-423/85-69 on 851112-14,20-22 & 25-27.No Violation Noted
ML20140C800
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/17/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20140C802 List:
References
NUDOCS 8601290001
Download: ML20140C800 (2)


See also: IR 05000423/1985069

Text

__ . . . - -

?

.

JAN 17 tyg

Docket No. 50-423

'

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

,

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection Report No. 50-423/85-69

1

This refers to the routine safety inspection conducted by Mr. H. vanKessel of

this office on November 12-14; 20-22; 25-27, 1985, at Millstone Nuclear Power

Station, Unit 3, Waterford, Connecticut, of activities authorized by NRC License

No. CPPR-113 and to the discussions of our findings held by Mr. vanKessel with

Messrs. J. Crockett and D. B. Miller, Jr. of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

, records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely, -

f

h / &'f(l

64 r,

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-423/85-69

8601290001 860117 3 Ck

PDR ADOCK 0500

g

I

'

.

f

l OFFICIAL RECORD COPY IR MILL 3 85-69 - 0001.0.0

1 01/11/86

J

- _ . _

-- - .- . , , . - ,

. _ _.

.

4

.

Northeast Nuclear Energy Company 2

cc w/ enc 1:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

'W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bcc w/ encl:

, Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

E. McCabe, Section Chief 3B, DRP

G. Walton, SRI, BV-2

T. Shedlosky, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

RI:DRSS RI:DRSS RI:DRSS RI:D S RI:DRSS

vanKessel/ mfd

Finkel Golla E

g

1/6/86 1/lb/86 1//p/86Mki. 1/N /86 1// 7/86

0FFICIAL RECORD COPY IR MILL 3 85-69 - 0002.0.0

1 01/11/86

.

't

. - -