Discusses Insp Repts 50-245/97-03,50-336/97-03 & 50-423/97-03 on 970203-07.Three Apparent Violations of NRC Requirements Identified.Predecisional Enforcement Conference to Discuss Violations,Scheduled for 970407
ML20140B896
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/26/1997
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kenyon B
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20140B899 List:
References
EA-97-104, NUDOCS 9704010434
Download: ML20140B896 (4)


See also: IR 05000245/1997003

Text

.

t

l

fu:

UNITED STATES

8

3

,g

NUCLEAR REGULATORY COMMISSION

WASHINGTON. D.C. 20666 0001

I

o

,o

March 26, 1907

l

I

l

EA No.97-104

'

Mr. Bruce D. Kenyon

'

President and Chief Executive Officer

Northeast Nuclear Energy Company

P. O. Box 128

Waterford, Connecticut 06385-0128

Dear Mr. Kenyon:

l

SUBJECT:

NRC COMBINED INSPECTION REPORT 50-245/97-03;50-336/97-03:

50-423/97-03; and NOTICE OF VIOLATION

This letter refers to the routine safety inspection conducted by Messrs. G.C. Smith,

E.B. King and P.R. Frechette of this office on February 3-7,1997, of activities authorized

j

f

i

by NRC License Nos. DPR-21, DPR-65, and NPF-49 at the Millstone Site, Waterford,

Connecticut and to the discussion of our findings held by Mr. Smith with members of your

staff at the conclusion of the inspection. The security program was inspected during this

j

period. The inspection consisted of selective reviews of procedures and records, inspector

observations, and interviews with security personnel.

!

Based on the results of this inspection, three apparent violations of NRC requirements were

identified and are being considered for escalated enforcement action in accordance with

the " General Statement of Policy and Procedure for NRC Enforcement Actions"

(Enforcement Policy), NUREG-1600. No Notice of Violation is presently being issued for

these inspection findings. In addition, please be advised that the number and

characterization of apparent violations described in the enclosed inspection report may

change as a result of further NRC review. The violations involve the failure to control

vehicles in the protected area properly, the failure to control safeguards information, and

the failure to perform personnel searches properly prior to granting protected area access.

We are particularly concerned because the first two of these violations were cited in the

past and it appears that your corrective actions have not been effective.

A predecisional enforcement conference to discuss these apparent violations has been

scheduled for April 7,1997 at 1:00 p.m., in the Region I office. The decision to hold a

i

predecisional enforcement conference does not mean that the NRC has determined that a

violation has occurred or that enforcement action will be taken. This conference is being

held to obtain information to er able the NRC to make an enforcement decision, such as a

common understanding of the facts, root causes, missed opportunities to identify the

apparent violations sooner, corrective actions, significance of the issues and the need for

lasting and effective corrective action. In addition, this is an opportunity for you to point

out any errors in our inspection report and for you to provide any information concerning

i

your perspectives on 1) the severity of the violations, 2) the application of the factors

h

l

9704010434 970326

DR

ADOCK 0500

5

.

.

-.

.

. . . ~ - _ -

. -

- _ _

. - .

. _ _ - .

..

__ -.-

-

l

~

s.

l

.

.

Mr. Bruce D. Kenyon

3

cc w/ encl:

N. S. Carns, Senior Vice President and Chief Nuclear Officer

R. T. Laudenat, Acting Director - Regulatory Affairs for Millstone Station

M. H. Brothers, Vice President - Millstone, Unit 3

J. McElwain, Unit 1 Recovery Officer

M. Bowling, Jr., Unit 2 Recovery Officer

D. M. Goebel, Vice President, Nuclear Oversight

J. K. Thayer, Recovery Officer, Nuclear Engineering and Support

P. D. Hinnenkamp, Director, Unit Operations

J. F. Smith, Manager, Operator Training

F. C. Rothen, Vice President, Work Services

J. Stanziewics, Training Recovery Manager

R. Johannes, Director - Nuclear Training

L. M. Cuoco, Esquire

J. R. Egan, Esquire

V. Juliano, Waterford Library

Department of Public Utility Control

S. B. Comley, We The People

State of Connecticut SLO Designee

Citizens Awareness Network

R. Bassilakis, CAN

J. M. Block, Attorney, CAN

S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative Terry Concannon

E. Woollacott, Co-Chairman, NEAC

l

l

_._

..

.,

-

- - . - - . .

. - . .

.

.

_ .

-.

.

__

- .-

'

l

.

.

.

Mr. Bruce D. Kenyon

3

I

cc w/ encl:

!

N. S. Carns, Senior Vice President and Chief Nuclear Officer

l

R. T. Laudenat, Acting Director - Regulatory Affairs for Millstone Station

M. H. Brothers, Vice President - Millstone, Unit 3

J. McElwain, Unit 1 Recovery Officer

i

'

M. Bowling, Jr., Unit 2 Recovery Officer

D. M. Goebel, Vice President, Nuclear Oversight

>

J. K. Thayer, Recovery Officer, Nuclear Engineering and Support

P. D. Hinnenkamp, Director, Unit Operations

J. F. Smith, Manager, Operator Training

,

F. C. Rothen, Vice President, Work Services

J. Stanziewics, Training Recovery Manager

R. Johannes, Director - Nuclear Training

L. M. Cuoco, Esquire

J. R. Egan, Esquire

V. Juliano,.Waterford Library

Department of Public Utility Control

S. B. Comley, We The People

j

State of Connecticut SLO Designee

Citizens Awareness Network

R. Bassilakis, CAN

J. M. Block, Attorney, CAN

S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative Terry Concannon

'

E. Woollacott, Co-Chairman, NEAC

i

1

,

_

__

.-

.

.

Mr. Bruce D. Kenyon

4

Distribution w/enet:

Region i Docket Room (with concurrences)

W. Axelson, DRS

W. Lanning, Deputy Director of Inspections, SPO, RI

M. Kalamon, SPO, RI

C. Miskey, DRS

DRS Files

NRC Resident inspector

Nuclear Safety Information Center (NSIC)

PUBLIC

FILE CENTER, NRR

D. Screnci, PAO

L. Cunningham, NRR

Distribution w/enci (VIA E-MAIL):

D. Screnci, PAO

J. Anderson, PM, SPO, NRR

W. Dean, OEDO

P. McKee, Deputy Director of Licensing, SPO, NRR

S. Reynolds, Technical Assistant, SPO, NRR

G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR

L. Plisco, Chief, SPO, NRR

S. Dembek,.PM, SPO, NRR

D. Mcdonald, PM, SPO, NRR

M. Callahan, OCA

R. Correia, NRR

R. Frahm, Jr., NRR

inspection Program Branch (IPAS)

DOCUMENT NAME: 1:\\ BRANCH 6\\SECURRPT.973

To receive a copy of this document, indicate in the bos:

"C" = Copy without attachment / enclosure

"E" = Copy with attachment /enclosu,e

'N" = No copy

j

OFFICE

RI/DRS

/

E RI/SPD

lE RI/0RA

.s

,

,,

NAME

KEIMIG /_

DURR ' M -

WALKER T W

kn(M wf V

DATE

3/2f/97 F

3/,/fT97

3/ W 97'

Al2/,[#7

0FFICE

RI/j;PO

l

l

NAME

L MlNT

DATE

3725/97

0FFICIAL RECORD COPY