March 17, 1997
Southern Nuclear Operating Company. Inc.
ATTN: Mr. D. N. Morey
Vice President
Farley Project
P. O. Box 1295
Birmingham. AL 35201-1295
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-348/97-01 AND 50-364/97-01.
Dear Mr. Morey:
On February 15. 1997 the NRC completed an inspection at your Farley Nuclear
Plant (FNP) facility. The enclosed report presents the results of that
inspection.
During the six-week period. your conduct of activities at FNP was generally
characterized by safety-conscious operations, sound engineering and
maintenance practices, and careful radiological work controls.
However, a
violation of NRC requirements was identified involving surveillance testing of
the 1A Penetration Room Filtration system. We are concerned because multiple
steps of the test procedure were either omitted or not performed as written.
The violation is cited in the enclosed Notice of Violation (Notice) and the
specific circumstances surrounding it are described in detail in the enclosed
report.
Please note that you are required to respond to this letter and
should follow the instructions specified in the enclosed Notice when preparing
your response.
The NRC will use your response, in part. to determine whether
further enforcement action is necessary to ensure compliance with regulatory
requirements.
We also call your attention to the discussion contained in the enclosed report
regarding the Concerns Program at Farley.
Following the last Unit 2 refueling
outage, a number of contractors expressed certain concerns in writing that
were not processed according to your Concerns Program.
Since we are concerned
that all employee concerns are resolved promptly and effectively, please
provide us with a written response within 30 days of this letter explaining
why your program failed to process written employee concerns and what
corrective actions you plan to take.
,
l
l
i
9704010207 970317
ADOCK 05000348
i
!
O
l%IIl!\\$llflf5
.
1a
_._____.m
. _ _ _ _ _ _ . _ _ _ . _ _ . -
.._. _ . _ _ ._ _ _
__
4
e
,
.'
'
'
!
4
March 17, 1997
l
4
t
!
i
i
,
Southern Nuclear Operating Company Inc.
j
ATTN: Mr. D. N. Morey
i
Vice President-
Farley Project
<
i_
P. O. Box 1295
Birmingham, AL 35201-1295
'
i
j
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-348/97-01 AND 50-364/97-01,
j
j
Dear Mr. Morey:
!
On February 15, 1997 the NRC completed an inspection at your Farley Nuclear
Plant (FNP) facility.
The enclosed report presents the results of that
i
]
inspection.
During the six-week period, your conduct of activities at FNP was generally
,
characterized by safety-conscious operations, sound engineering and
!
i
maintenance practices, and careful radiological work controls.
However, a
!
violation of NRC requirements was identified involving surveillance testing of
j
the 1A Penetration Room Filtration system.
We are concerned because multiple
steps of the test procedure were either omitted or not performed as written.
'
i
!
The violation is cited in the enclosed Notice of Violation (Notice), and the
specific circumstances surrounding it are described in detail in the enclosed
,
report.
Please note that you are required to respond to this letter and
i
i
i
should follow the instructions specified in the enclosed Notice when preparing
!
'
your response.
The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory
requirements.
We also call your attention to the discussion contained in the enclosed report
!
regarding the Concerns Program at Farley.
Following the last Unit 2 refueling
outage, a number of contractors expressed certain concerns in writing that
- '
were not processed according to your Concerns Program.
Since we are concerned
l
that all employee concerns are resolved promptly and effectively, please
!
provide us with a written response within 30 days of this letter explaining
i
why your program failed to process written employee concerns and what
j
corrective actions you plan to take.
t
i
.
!
!
f
!
(!.
4
9704010207 970317
'
ADOCK 05000348
G
%
,
i
nd
-
.
.-
.
-
..
._
-_
- . .
. _ _ _
_
_ . _ . _ _ _ _
_ _ _ . __
_ _ _ _ _ _ _ _ _ _
. _ __
_
.
-
..
SNC.
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of
4
'
this letter and its enclosures will be placed in the NRC Public Document Room.
Sincerely.
(Original signed by Pierce H. Skinner)
Pierce H. Skinner. Chief
4
)
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos.:
50-348 and 50-364
License Nos..
Enclosure:
1.
2.
Inspection Report 50-348/97-01
and 50-364/97-01
1
cc w/encls:
.
M. J. Aj1 uni
'
Licensing Manager
Southern Nuclear Operating
Company. Inc.
P. O. Box 1295
t
l
Birmingham. AL 35201-1295
4
R. D. Hill, Jr.
General Manager. Farley Plant
Southern Nuclear Operating
Company. Inc.
)
'
P. O. Box 470
1
Ashford. AL 36312
G. S. Waymire. Su3ervisor
'
Safety Audit and Engineering Review
Farley Nuclear Plant
P. O. Box 470
'
Ashford. AL 36312
J. D. Woodard
Executive Vice President
Southern Nuclear Operating
,
Company. Inc.
.
P. O. Box 1295
Birmingham. AL 35201
!
State Health Officer
'
Alabama Department of Public Health
434 Monroe Street
Montgomery. AL 36130-1701
cc w/encls cont'd:
(See Page 3)
.
-
.
.
3
cc w/encls:
Continued
M. Stanford Blanton
Balch and Bingham Law Firm
P. O. Box 306
1710 Sixth Avenue North
Birmingham. AL 35201
Chairman
Houston County Commission
P. O. Box 6406
Dothan, AL 36302
Distribution w/ encl:
J.-Zimmerman, NRR
P. H. Skinner. RII
R. P. Carrion. RII
W. P. Kleinsorge. RII
M. E. Ernstes, RII
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
7388 N State Hwy 95
Columbia, AL 36319
pith \\d
orrtre
pii sp
pit-opp
off nep
SIGNATURE
[d
!.
NAME
RPCarrion:dka
PHSkinner
TKRoss
JBartley
DATE
02 // 2 / 97
ON l
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
COPY?
[Y[S) NO
[fES)
NO
YES
NO
VES
NO
YES
NO
VES
NO
-
L+ r lLI AL ktLunu LUr'Y
V,A UMt.h i hAMt ; A: \\r A/UlllR,ut i
-
- -
-
-
-
-
-
- .. -
-
_.
- . _ . - - .-
. _
_ _ . _
- - -
.
. - -
-
.- . .
.
TO'd ~10101
.
.._ ..
..
. ..
. . . . . , , .
4
i
3
cc w/encls: Continued
M. Stanford Blanton
Balch and Bingham Law Firm
P. O. Box 306
,
1710 Sixth Avenue Nort.h
'
Birmingham. AL 35201
Chairman
Houston County Commission
'
P. O. Box 6406
Dothan. AL 36302
Distribution w/aic1:
i
J. Zimmerman, NRR
l
P. H. Skinner RII
R. P. Carrion. RII
W. P. Kleinsorge.- RII
Ernstes. RII
-
NRC Resident Inspector
U.S. Nuclear
ulatory Ccmission
7388 N State
95
Columbia. AL
319
6
\\
'
/
.
fWrffs
Af f t!!N
Rff.hte
Ef f.39
k?f Me
j
EIBl&hK
hur
Raertwas
P e free-
Ns N
Me ey
CAff
03 /
/ 97
03 /
/ 99
03 / 17 / 97
03 / N / 91
58 /
/ 97
C3 /
/ 97
coPr?
Yts
e
vrg
ua
A no
yrs
@)
vc
w
ns
oc
arIGIA sw wrr
w..rt.di w r .u /LIIR.J6
O
T0*d
684S TEC POP i
01
WCid:1
Wd92:2T 466T-41-E0