Forwards Insp Repts 50-348/97-01 & 50-364/97-01 on 970215 & Notice of Violation
ML20140B777
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/17/1997
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20140B782 List:
References
NUDOCS 9704010207
Download: ML20140B777 (4)


See also: IR 05000348/1997001

Text

-

,

,

March 17, 1997

Southern Nuclear Operating Company. Inc.

ATTN: Mr. D. N. Morey

Vice President

Farley Project

P. O. Box 1295

Birmingham. AL 35201-1295

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-348/97-01 AND 50-364/97-01.

AND NOTICE OF VIOLATION

Dear Mr. Morey:

On February 15. 1997 the NRC completed an inspection at your Farley Nuclear

Plant (FNP) facility. The enclosed report presents the results of that

inspection.

During the six-week period. your conduct of activities at FNP was generally

characterized by safety-conscious operations, sound engineering and

maintenance practices, and careful radiological work controls.

However, a

violation of NRC requirements was identified involving surveillance testing of

the 1A Penetration Room Filtration system. We are concerned because multiple

steps of the test procedure were either omitted or not performed as written.

The violation is cited in the enclosed Notice of Violation (Notice) and the

specific circumstances surrounding it are described in detail in the enclosed

report.

Please note that you are required to respond to this letter and

should follow the instructions specified in the enclosed Notice when preparing

your response.

The NRC will use your response, in part. to determine whether

further enforcement action is necessary to ensure compliance with regulatory

requirements.

We also call your attention to the discussion contained in the enclosed report

regarding the Concerns Program at Farley.

Following the last Unit 2 refueling

outage, a number of contractors expressed certain concerns in writing that

were not processed according to your Concerns Program.

Since we are concerned

that all employee concerns are resolved promptly and effectively, please

provide us with a written response within 30 days of this letter explaining

why your program failed to process written employee concerns and what

corrective actions you plan to take.

,

l

l

i

9704010207 970317

PDR

ADOCK 05000348

i

!

O

PDR

l%IIl!\\$llflf5

.

1a

_._____.m

. _ _ _ _ _ _ . _ _ _ . _ _ . -

.._. _ . _ _ ._ _ _

__

4

e

,

.'

'

'

!

4

March 17, 1997

l

4

t

!

i

i

,

Southern Nuclear Operating Company Inc.

j

ATTN: Mr. D. N. Morey

i

Vice President-

Farley Project

<

i_

P. O. Box 1295

Birmingham, AL 35201-1295

'

i

j

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-348/97-01 AND 50-364/97-01,

j

AND NOTICE OF VIOLATION

j

Dear Mr. Morey:

!

On February 15, 1997 the NRC completed an inspection at your Farley Nuclear

Plant (FNP) facility.

The enclosed report presents the results of that

i

]

inspection.

During the six-week period, your conduct of activities at FNP was generally

,

characterized by safety-conscious operations, sound engineering and

!

i

maintenance practices, and careful radiological work controls.

However, a

!

violation of NRC requirements was identified involving surveillance testing of

j

the 1A Penetration Room Filtration system.

We are concerned because multiple

steps of the test procedure were either omitted or not performed as written.

'

i

!

The violation is cited in the enclosed Notice of Violation (Notice), and the

specific circumstances surrounding it are described in detail in the enclosed

,

report.

Please note that you are required to respond to this letter and

i

i

i

should follow the instructions specified in the enclosed Notice when preparing

!

'

your response.

The NRC will use your response, in part, to determine whether

further enforcement action is necessary to ensure compliance with regulatory

requirements.

We also call your attention to the discussion contained in the enclosed report

!

regarding the Concerns Program at Farley.

Following the last Unit 2 refueling

outage, a number of contractors expressed certain concerns in writing that

'

were not processed according to your Concerns Program.

Since we are concerned

l

that all employee concerns are resolved promptly and effectively, please

!

provide us with a written response within 30 days of this letter explaining

i

why your program failed to process written employee concerns and what

j

corrective actions you plan to take.

t

i

.

!

!

f

!

(!.

4

9704010207 970317

'

PDR

ADOCK 05000348

G

PDR

%

,

i

nd

-

.

.-

.

-

..

._

-_

- . .

. _ _ _

_

_ . _ . _ _ _ _

_ _ _ . __

_ _ _ _ _ _ _ _ _ _

. _ __

_

.

-

..

SNC.

2

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

4

'

this letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely.

(Original signed by Pierce H. Skinner)

Pierce H. Skinner. Chief

4

)

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos.:

50-348 and 50-364

License Nos..

NPF-2 and NPF-8

Enclosure:

1.

Notice of Violation

2.

Inspection Report 50-348/97-01

and 50-364/97-01

1

cc w/encls:

.

M. J. Aj1 uni

'

Licensing Manager

Southern Nuclear Operating

Company. Inc.

P. O. Box 1295

t

l

Birmingham. AL 35201-1295

4

R. D. Hill, Jr.

General Manager. Farley Plant

Southern Nuclear Operating

Company. Inc.

)

'

P. O. Box 470

1

Ashford. AL 36312

G. S. Waymire. Su3ervisor

'

Safety Audit and Engineering Review

Farley Nuclear Plant

P. O. Box 470

'

Ashford. AL 36312

J. D. Woodard

Executive Vice President

Southern Nuclear Operating

,

Company. Inc.

.

P. O. Box 1295

Birmingham. AL 35201

!

State Health Officer

'

Alabama Department of Public Health

434 Monroe Street

Montgomery. AL 36130-1701

cc w/encls cont'd:

(See Page 3)

.

-

.

.

SNC

3

cc w/encls:

Continued

M. Stanford Blanton

Balch and Bingham Law Firm

P. O. Box 306

1710 Sixth Avenue North

Birmingham. AL 35201

Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

Distribution w/ encl:

J.-Zimmerman, NRR

P. H. Skinner. RII

R. P. Carrion. RII

W. P. Kleinsorge. RII

M. E. Ernstes, RII

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

7388 N State Hwy 95

Columbia, AL 36319

pith \\d

orrtre

pii sp

pit-opp

off nep

SIGNATURE

[d

!.

NAME

RPCarrion:dka

PHSkinner

TKRoss

JBartley

DATE

02 // 2 / 97

ON l

/ 97

03 /

/ 97

03 /

/ 97

03 /

/ 97

03 /

/ 97

COPY?

[Y[S) NO

[fES)

NO

YES

NO

VES

NO

YES

NO

VES

NO

-

L+ r lLI AL ktLunu LUr'Y

V,A UMt.h i hAMt ; A: \\r A/UlllR,ut i

-

- -

-

-

-

-

-

- .. -

-

_.

- . _ . - - .-

. _

_ _ . _

- - -

.

. - -

-

.- . .

.

TO'd ~10101

.

.._ ..

..

. ..

. . . . . , , .

4

i

SNC

3

cc w/encls: Continued

M. Stanford Blanton

Balch and Bingham Law Firm

P. O. Box 306

,

1710 Sixth Avenue Nort.h

'

Birmingham. AL 35201

Chairman

Houston County Commission

'

P. O. Box 6406

Dothan. AL 36302

Distribution w/aic1:

i

J. Zimmerman, NRR

l

P. H. Skinner RII

R. P. Carrion. RII

W. P. Kleinsorge.- RII

Ernstes. RII

-

NRC Resident Inspector

U.S. Nuclear

ulatory Ccmission

7388 N State

95

Columbia. AL

319

6

\\

'

/

.

fWrffs

Af f t!!N

Rff.hte

Ef f.39

k?f Me

j

EIBl&hK

hur

Raertwas

P e free-

Ns N

Me ey

CAff

03 /

/ 97

03 /

/ 99

03 / 17 / 97

03 / N / 91

58 /

/ 97

C3 /

/ 97

coPr?

Yts

e

vrg

ua

A no

yrs

@)

vc

w

ns

oc

arIGIA sw wrr

w..rt.di w r .u /LIIR.J6

O

T0*d

684S TEC POP i

01

WCid:1

Wd92:2T 466T-41-E0