{{#Wiki_filter:-- INSERVICE TESTING PROGRAM CALLAWAY PLANT J i I Prepared for UNION ELECTRIC COMPANY Prepared by POWER PRODUCTION ENGINEERING Prepared and issued by:

                         /

fd,8f/ HN R. KNOKE, President / Dat.e 8109140154 810905 PDR ADOCK 05000482 A FDR

g ,.

                                                                , ,.  ....w,   ..a   . u..   .    - - - - - - - - - : a--- :-

W

                    .                                                                                                                        t TABLE OF CONTENTS                                                       .

Page INTRODUCTION il 1.O INSERVICE TESTING OF PUMPS 1.1 General Information . . . ........... 1-1 1.2 Program Information . . . ........... 1-1 1.3 Test Frequency . . . . . . ........... 1-1 1.4 Request for Relief . . . . ........... 1-2 2.0 INSERVICE TESTING OF VALVES 2.1 General Information . . . ........... 2-1 2.2 Program Information . . . . . . . . . . . . . . 2-1 2.3 Piping and Instrumentation Drawings . . . . . . 2-5 2.4 Request for Relief . . . . . . . . . . . . . . . 2-6 2.5 Explanation of Abbreviations and N.,tes . . . . . 2-6 3.0 INSERVICE TESTING PROGRAM 3.1 ISI Pump Program 3.2 ISI Valve Program Appendix A - Relief Requests for Pumps Appendix B - Relief Requests for Valves

        ._            _ - - _ _ _ _ _ _ - _ _ _ _ _ _ _ . _ - _                            h                                                     l
y. . . . . . ..a . -. as. .. . .

I:1TRODUCTION e e The Inservice Testing Program for Callaway Plant was developed in compliance with the rules and regulations of 10CFR50.55a and Section XI of the ASME Boiler and Pressure Vessel Code, 1977 Edition through Summer 1979 Addenda. Where these rules were determined to be impractical, specific relief was written. Section 1.0 discusses the Inservice Testing Program of applicable ASME Class 1, 2 and 3 pumps. Section 2.0 discusses the Inservice Testing Program of applicable ASME Class 1, 2 and 3 valves. Both of these programs were developed to the guidelines suggested in an NRC lette_ dated January, 1978. , f e e ii

a ,. ...,.u....c. s . . .:. .. . 1.0 INSERVICE TESTING CF PUMP 3 11 General Information l The Inservice Testing Program for ASME Class 1, 2 and 3 pumps was developed in accordance with, and meets the requirements of ASME Boiler and Pressure Vessel Code, Section XI, Subsection IWP, 1977 Edition through Summer 1979 Addenda. The Inservice Testing Irogram for pumps will remain in effect through the next 10 year inservice inspec-tion interval. Section 3.1 lists all Class 1, 2 and 3 pumps which are to be tested, along with the applicable param-eters to be measured. 1.2 Program Information The following information is included in the Inservice Testing Program for pumps: A. Pump Number lists the pump identification number as shown on the P&ID's. B. Pump Name describes the pump's functional identification as it is related to system operation. C. ISI Class is the Owner's classification of the pump per ISI requirements. D. Test Parameters indicates the required test quantities measured per Table IWP-3100-1. E. Notes are general statements which can'be referred to in the ISI Testing Program. Requests for Relief (see 1.4) are also de-noted here as PRR(#). 1.3 Test Frequency An inservice test shall be run on each pump nominally every three months during plant operatien. If this frequency can reasonably be accomplished during shut-down periods it will be, however, this is not mandatory.

           . Where a pump is not tested on a three month frequency during plant shutdown, it will be tested prior to declaring the system operable, per Technical Specifi-cations.

1-1

3 . . . . . . . , . . . . . . . . . .....___._u._- _ _ . _ . - .. . , 1.4 Request for Relief

      ~

Where ASME Section XI requirements were determined

  • to bc impractical, a request for relief was written.

These requests were developed to the guidelines suggested in an NRC letter dated January 1975. Where relief from an ASME Code requirement is granted within the provisions of 10CFR50.55a (g) (6) (i) , it will be incorporated into the Callaway Inservice Testing Program. Relief requests are shown in Appendix A. Please note that Pump Relief Request #1 is generic. It is not referenced in the program, but applies to all pumps listed. 1.5 Special Test Where a pump is operated more frequently than every 3 months, it need not be stopped for a special test, provided the requireuents of IWP-3400b are met. 1-2

y n,- .,. ..  : e . - . : s.1. a..; L._, w -..:. . - ~ ~ . - . 2.0 INSERVICE TESTING OF VALVES '

      -                                                                             t 2.1    General Information The Inservice Testing Program for ASME Class 1, 2 and 3 valves was developed in accordance with, and meets the requiremente of ASME Boiler and Pressure Vessel Code, Section XI, Subsection IWV, 1977 Edition through Summer 1979 Addenda.

The Inservice Testing Program for valves will remain in effect throughout the next 10 year inservice in-

spection interval.

The Inservice Testing Program lists all ASME Class 1, 2 and 3 valves that have been assigned valve cate-gories. Except for valves directly in the flow path (B passive), valves exempted per IWV-1200 are not lis tec' . This listing is located in Sectica 3.2. The tables are organized by system in order of the assigned P&ID's number and ere listed its Section 2.3. 2.2 Program Information The following information is included in the Inservi. Testing Program for valves: A. Valve Number lists the valve identification number as shown on the P&ID's. B. P&ID and Coordinates references the P&ID on which the valve appears and its coordinates. C. ISI Class is the Owner's classification of the valve per ISI requirements. D. Valve Category indicLtes the category assigned to the valve based on the definitions of IWV-2200. E. Valve Size lists the nominal pipe sire of the valve in inches. F. Valve Type lists the valve design. G. Actuator Type lists the type of valve actuator. H. Valve Position indicates the nbrmal position of the valve during plant operation; either no) molly open (O), normally closed (C) or both (0/C).

 ,,                   . : ~,: 1.u-     .                        .

I. Stroke Direction indicates the direction which an active valve must stroke to perform its safety - function. Also, the direction in which the valve 5 will be stroked to satisfy the exercising require

  • ments of IWV-3410 or IWV-3520. This may be spec-ified as open (O), closed (C) or both (0/C).

J. Test lists the test or tests that will be performed for each valve to fulfill the requirements of Sub-section IWV. Seat Leak Test AT V'alve will be seat leak tested at the appropriate functional differential pressure. Full Stroke Exercise Test BT Valve will be full stroke exercised for operability in the direction necessary to fulfill its safety function. Partial Stroke Exercise Test BTP Valve will be partial stroke exe.ccised when full stroke exercising is impractical. Check Valve Partial Exercise Test CVP Check valve will be partial stroke exercised, (i.e. disc moves away from seat) when full stroke exercising is impractical. Check Valve Exercise Test CVT Check valve will be exercised to the position required to fulfill its function. This functional test will be verified by the operation of the required system. Fail-Safe Test FST All valves with fail-safe actuators will be tested to verify proper fail-safe operation upon loss of l actuator power. i Position Indicating Test PIT l Automatically accuated valves with remote indication will be verified in accordance with IWV-3300. Relief Valve Set Point Check RVT Relief and safety valve set points will be verified in accordance with IWV-3510. l , K. Test Mode indicates the frequency at which the above mentioned tests will be performed. The following abbreviations are used: l l I l l 2-2

a,.. 2n- .- m m .ua . s u--- - ------- ; u-- -------- - -- - . - --- - - - - - - - - - - - - Cold Shutdown CS Valve testing at cold shutdown is valve testing which commences not later than seventy-two (72)

                                                                                                            } ,

hours after cold shutdown and continues until required testing is completed or plant startup, whichever occurs first. Completion of all re-quired valve testing is not a requisite to plant startup. Valve testing which is not completed during a cold shutdown will be performed during subsequent cold shutdowns to meet the Code spec-ified testing requirements. No valve is required to be tested more often than once every 90 days. Note: Completion of all valve testing during cold shutdown is not required if plant operating conditions will not permit the testing of specific valves. Normal Operation GP Valve tests with this designation will be per-formed once every three months. Reactor Refueling RR Valve tests wita this designation will be con-ducted at reactor refueling outages only. L. Max Stroke Time lists the maximum allowed full stroke time measured in seconds from signal in-itiation until stroke completion is indicated. Testing is to be completed for all stroke times listed whenever the valve is full stroke tested (ref. IW7-3413). M. Relief Request references the relief request con-tained in Appendix B that applies to the particular valve. N. Remarks lists clarification remarks. 2.3 Piping & Instrumentation Drawings l The following P&ID's contain valves which are part of the Inservice Testisg Program: 2-3

g. i SYSTEM P&ID REVISION M-02AB01 7  : MAIN STEAM SYSTEM - M-02AB02 8 FEEDWATER SYSTEM M-02AE02 9 AUXILIARY FEEDWATER SYSTEM M-02AL01 8 REACTOR COOLANT SYSTEM M-02BB01 8 M-02BB02 10 M-02BB03 7 CHEMICAL & VOLUME CONTROL SYSTEM M-02BG01 8 M-02BG02 10 M-02BG03 10 M-02BG05 9 REACTOR MAKE-UP WATER SYSTEM M-02BL01 7 STEAM GENERATOR BLOWDOWN SYSTEM M-02BM01 7 EORATED REFUELING WATER STORAGE SYSTEM M-02BN01 7 FUEL POOL COOLING AND CLEAN-UP SYSTEM M-02EC01 8 M-02EC02 7 ESSENTIAL SERVICE WATER SYSTEM M-02EF01 8 M-02EF01 7 M-02EF02 6 COMPONENT COOLING WATER SYSTEM M-02EG01 7 M-02EG02 9 M-02EG03 10 RESIDUAL HEAT REMOVAL SYSTEM M-02EJ01 8 HIGH PRESSURE COOLANT INJECTION M-02EM01 5 SYSTEM M-02EM02 5 M-02EN01 4 CONTAINMENT SPRAY SYSTEM ACCUMULATOR SAFETY INJECTION SYSTEM . M-02EP01 9 AUXILIARY TURBINES-AUXILIARY M-02FC02 7 FEEDWATER PUMP TURBINE 2- 4

 ,                   ,   ,              L._..   .. .    .

CONTAINMENT HYDROGEN CONTROL , SYSTEM . M-02GS01 6 CONTAINMENT PURGE SYSTEM M-02GT01 9 LIQUID RADWASTE SYSTEM M-02HB01 10 DECONTAMINATION SYSTEM M-02HD01 4 EMERGENCY FUEL OIL SYSTEM M-02JE01 6 COMPRESSED AIR SYSTEM M-02KA01 10 M-02KA02 8 FIRE PROTECTION SYSTEM M-02KC02 8 STANDBY DIESEL GENERATOR M-02KJ01 1 M-02KJ03 1 M-02KJ04 1 M-02KJ06 0 REACTOR BUILDING AND HOT MACHINE SHOP FLOOR AND EQUIPMENT DRAIN SYSTEM M-02LF09 7 NUCLEAR SAMPLING SYSTEM M-02SJ01 6 M-02SJ04 A 4 e 2-5

2. 2.4 Request for Relief Where ASME Section XI requirements were determined 5 to be impractical, a request for relief was written. These requests were developed to the guidelines suggested in an NRC letter dated January 1975. (See Appendix B) 2.5 Explanation of Abbrevic.tions and Notes See the following pages. 2-6

                                                                                                                                                                                      ; p-1                      .I ,             ;
                                                                                                                                                                       'E I                                                           ,

Ssar.i"* INSERVICE TEST.'NG PROGRAM rown u;. ., ~.Si OuASS 1,2 & 3 VALVES Production 1

                                                                                                                                                                                   /;

Enginuring

   !i_      "sk..                       _

CALLAWAY NUCLE AR PLANT I SYSTEM P & 83 REVISION - DATE PAGE i' EXPLANATION OF ABBREVIATIONS O 5/81 1 of 4 . ,, i

                         '            r *                              ,                           ,

I,

                                                                                                                                                                ,,                j       6
                                                                                                                                                 )               #*

g O A g [e s h A . k A

                        /
? ..l
                                                                                                                                                                 .sg ie,              ,     i*                     s .-

t BA BALL ',

                                                                                                                             '(,          $, t ,-                .j,'.                '
,                                                                                                                                                  . . ,                                6
                                                                                                                       !.                   n                        rC 4 .-

s =i : Ijl .t

                                                                                      ;                                      !    'fI'j'!,;,'                     t                 .

i CK 'i CHECK ,f ! ' t, .' d:l't; E i

                                                                                                                                                                                    'l      i j.-          .
3 i 1 iL ';

GA - i GATE i j m . , . . , fi , !! . .h3. s  : J r .

                                                                                                                       +                    q!            .

h [. ;-

                                                                           -                                                 .            S i, i.                                       ,

GLOBE l,l ' . l' ,( j I, ' !. GL ,,i l . .g [ .l y

'                                                                                                                      '_ ! !                 "t                                  l
                                                                                                                             !        5 .q j RV                                                    r       RELIEF        i !'     l!               ,        si i             y!:
                                                                                                                             ?         - i                                        pi i                                                                                                                                      '

i '

                                                                                                                   ..                          l!                 ;               lf!'

j:l SAFETY. SV f,

                                                                                                                   !   !l                                           .l j         j
                                                                                                                                      -     p                                    i, : .

THREE WAY lj 'i ; TW , t .! ,

                                                                                                                                                                               )i ANGLE CLO.BE                                                    I AGL                                                                                                                           e I

i

                                                       -.                .                   .           .. . . . . .-          .- ~, ,,..                 . . .o t,

SR "a'.i"" (NSERVICE TESTING PROGRAM rown  ; f U/ f.., ISI CLASS 1,2 & 3 VALVES Production Enginndng "s ".'i. CALLAWAY NUCLEAR PLANT l P & 10 A EVISION . DATE PAGE SYSTEM EXPLANATION OF ALBREVIATIONS , O 5/81 l' 2 of 4 l t l

                      //         g / / k g q i / ,4 y Q - f[ .

BUTTERFLY 11 . H I'

                                                                                                                                                            ,l
                                                                                                                                                                             ;I BTF                                                                                             i                  :

q jJ l i,

                                                                                                                                                                .,              ,l i                                                                                                  '

DIAPHRAGM '  ; DIA .' b - - j*I l}' :

                                                                                                                                                          .'         .       ,P
                                                                                                                                                          .i i-                                                       L i                                                 '

M l . MANUAL: ' p[ ,}'

                                                                                                                            !                             ] j, '

i i ,

                                                                                                                                                          .j! ,             ,

AIR OPERATOR ! i;- !I~ AO . ii" 'I' .l.l

                                                                                                                                                          !! '            u j ll                         ;;      '.;
                                                                                                                                                              '           f' '

1 MO MOTOR' OPERATOR , li,;:i

                                                                                                           .            .-                                :i
  • f' f!,
i, I: -
                                                                                                                                                          'I',

8 SA SELF ACTUATED'!!'  : i 4 ' il>

                                                                                                                                             .; ,                         l' SO                                                       SOLENOID                       ',i        +

ll 1 , AT SEAT *LEdK TEST r f

                                                                                                                                            ; t.         C'                   ,
                                                                                                                                                                                         ?

INSERV;CE TESTING PROGRAM m.,  !'  ! Y 'N"N'.7"' i l UE,,,, ISI CLASS 1,2 & 3 VALVES  ! Produe lon 'l Enginuring -'

               "i,".'i.                          CALLAWAY NUCLEAR PLANT P & 10                              REVISION . DATE          PAGE SYSTEM EXPLANATION OF ABBREVIATIONS                                                                         O      5/81       >

3 of 4 -

                                                                                                                                                                          -i i
                                               /                                                                                                               t a%

l l f f a, 4 h } } h  ;

                                                                                                                                             ;                         j '+                   t I                                                                                                                                      FULL STROKE i l.'d               . ..

BT l EXERCISE TEST' :I[ [l l

                                                                                                                                             , ,,           II:'       ll
                                                                                                                                                                       . i. i I
j' }j PARTIAL STROKB i:

BTP EXERCISE TEST- b

                                                                                                                                                                                             ,I' lI h7 j,,.,                        r:'
                             - -                                                                                           i     ,    PARTIAL CHECKt ,                   :1      '

i  ;; VALVE EXERCISE 4' 9 ' i i CVP TEST ' i!  ;; i '!., t-

) "
                                                                                                                                                                       .. i .            #1i CHECK VALVE "l                   H'!                         '

i Lj1 EXERCISETESTl !lll [ j !'. ~?1 i 4 i i , FST FAIL SAFE TEST . f. j.. ~ ., li

                                                                                                                                             ,J                 .

1.- POSITION I!i f;-f PIT INDICATING TEST {: ', ' [! e

                                                                                  -                                                   SAFETY OR RELIEF                      i-RW                                                         VALVE TEST          '
                                                                                                                                                                                !       ji 4
                                                                                                                                                                                -{

CS COLo.'sHuroowN P i i 1

                                                                                              ~
,                                                                                                              .p i                    ; ; .lLY

[i . if l Ta'!,'"' INSERVICE TEST!NG PROGRAM ' r .., i,

                                                                                                                                                                         't;                  O       '

U$',,,, ISI CLASS 1,2 & 3 VALVES . Production ' t

                                                                                                                                                                                             !i.

Enginuring '  :; T.'i. . CALLAWAY NUCLEAR PLANT F P & ID R EVISION . DATE

  • AGE SYSTEM '

EXPLANATION OF ABBREVIATIONS O 5/81 4 of 4 '; jj ]t:- ' i , - . i . , 1

                     //          y/ /iS g y i                             /$ q %l' i

ii '

                                                                                                                                                                       .la
                                                                                                                                                                         ~ , ;' ' ' y
                                                                                                                                                                          .u,
                                                                                                                                                                       'I h:

h; OP  ! NORMAL l' OPERATI l i. ; 4 i iH !_ i i

                                                                                                                                                                        ,;t h':l 's ;
                                                                                                                                                                                         . l         ..

i . i. REACTOR REFUELINC .l ;;;.g: j i y( RR ., a - i vtt

                                                                                     ,                           ! ;-                              1                      II!): hi i
                                                                                                . VALVE'RELIEFll,.'                                        u               ri                       -
                                                                                    #            REQUEST                                          I!                      h:[.'kj .

i i

                                                                                                                                                  !I                     r,I i f, f,             r t

i

-' I

[- .I l j 4 ii . 1 .I,,l.

                                                                                     '                                                                                           ,' . b
                                                                                                                                 . i..         3.jg [.                     . .. ;. 7
                                                                                                                                 !.yI.'..

i

                                                                                                                                                                           . '. d: '
                                                                                                                                                                           ; 'll .

t i11.,  ! 1 5' g; ('

                                                                                                   .l{       6 t             i.-l         ij;fi
                                                                                                                                                                          ,:1 i             jI
                    ,-                                                                             . , , , .h i'            ,

e' t

                                                                                                           ,                     (               Ij l l'           i"'                  ,
                                                                                                           '                                                                                    5)?

l6' y i h -

                                                                                                                                                                                               ?
                                                                                                                                                                           ,1 I

l! tp I

  • ji ,jh, I ilk J
                                                                                                                                                                        ' l: - .t.!;-

i I!,L ' *I l: U!

                                                                                                               ..f!'                                 'i
                                                                                                                                                                .                            ,i . ,

[:

rw _. , A _. _ . .m_ .i _ .z..._. . A _ ~mg . _ _ _

     - =.=..         = - - - - - = .            .

___-.,,,,. =~==.=--:--=~ - - - - - - - - EXPLANATION OF NOTES Page 1 of 1

                                                                             - - .                                                  _ .   . . -           . _ . . . . - . - - _ _ - - .                                 ~.
1. This valve is checked for locked closed or locked open position.
2. This valve is a pressure relief valve and will be tested
                                     ~ 'at the frequency stated in IWV-3511.
3. This valve is a passive valve and does not require testing.
4. This valve cannot be full stroke exercised.
5. This valve cannot be partially stroke exercised during plant operation.
6. All motor operated valves fail-as-is and therefore do not require a fail safe test per IWV-3415.
7. An intersystem LOCA seat leakage test will be performed in accordance with Owner's requirements.
8. This valve is tested when the containment spray header is tested per Technical Specification.
9. This valve is A passive and will only receive a seat leakage test.
10. The seat leakage test for this valve will be performed in accordance with 10CFR50 Appendix J requirements.
11. This valve is within a non-safety related system, how-ever, it is used for containment isolation and there-fore will receive a seat leakage test in accordance
                                              .with 10CFR50 Appendix J requirements.
12. Position of valve is determined to be non-safety re-lated and therefore requires no testing. ,

un G

3 . . . . .~.....~..m.....m.. . _ . . ..- _ e

       .                                                                           I e

3.O INSERVICE TESTING PROGRAM l t l i l I I I

     .                                              t e

SECTION 3.1 INSERVICE TESTING PROGRAM - PUMPS CALLAT': .LANT P r r t t

              %";'["'                                                                                      INSERVICE TESTING PROGRAM                                       " **JociioR o

Po w e r ISI CLASS 1,2 & 3 PUMPS En gineerin g

                                                                                                                                                                                                         "^
                "s"'ie m                                                                                     CALLAWAY NUCLEAR PLANT                                       "'o'S'o"- otJg 1 1 o, 3
                                                                                                               $                                 TEST PARAMETE RS PUMP NUMBE R                                                                                   PUMP N AME     3    P & ID AND                                                                  NOTES

{ CC JR DIN AT E S SPEED INLET DIF F. FLOW Vf BR ATION BE ARING E PRES. PRES. RATE TEMP, PALOl A MOTOR DRIVEN AUXILIARY 3 M-02AL01 NA YES YES YES YES NO 1 FEEDWATER PUMP A E-4 PRR-3 i PALOl B MOTOR DRIVEN AUXILIARY 3 M-02AL01, NA YES YES YES YES NO 1 FEEDWATER PUMP B G-4 PRR-3 M-02AL01 , PALO2 TURBINE DRIVEN 3 B-4 YES YES YES YES YES NO 1 r AUXILIARY FEEDhATER & PRR-3 PUMP M-02FC02 . PBG02 A BORIC ACID TRANSFER 3 M-02BG05 NA YES YES YES YES NO 1 PUMP B-6 PRR-3 , PBG02 B BORIC ACID TRANSFER 3' M-02BG05 NA YES YES YES YES NO 1 PUMP A-6 p , PBG05 A CENTRIFUGAL CIIARGING 2 M-02BG03 NA YES YES YES YES NO 1 i PUMP C-5 PRR-3 PBG05 B CENTRIFUGAL CHARGING 2 M-02BG03 NA YES YES YES YES NO 1 PUMP B-5 . PRR-3 f

St a n d a rdated Ng,;n INSERVICE TESTING PROGRAM "" * *i, c ,io , , I Pge; ISI CLASS 1,2 & 3 PUMPS En ginee ring sy ,tm CALLAWAY NUCLEAR PLANT "'5 "QWf 2 t,"3 N TEST PAR AM"7 E RS PUMP NUMBER PUMP NAME 3 P & ID AND NOTES U COORDINATES SPE E D INLET DIF F. FLOW Vf BR ATION BE ARING U PRES. PRES. RATE TEMP. M-U2EF01 NA YES YES YES YES NO 1, 2 PEF 01 A ESSENTIAL SERVICE 3 WATER PUMP G-6 PRR-3 M-U2EF01 NA YES YES YES YES NO 1, 2 PEF 01 B ESSENTIAL SERVICE 3 WATER PUMP C-6 PRR-3 3 M-02EG01 NA YES YES YES YES NO 1 PEG 01 A COMPONENT COOLING WATER PUMP G-4 PRR-3 . M-02EG01 NA YES YES YES YES NO 1 PEG 01 B COMPONENT COOLING 3 WATER PUMP D-4 pRR-3 3 M-02EG01 NA YES YES YES YES NO 1 PEG 01 C COMPONENT COOLING WATER PUMP E-4 PRR ' 3 M-02EG01 NA YES YES YES YES NO 1 PEG 01 D COMPONENT COOLING WATER PUMP B-4 PR -3 l RESIDUAL IIEAT 2 M-02EJ01 NA YES YES YES YES NO 1 PEJ01 A l REMOVAL PUMI' G-6 PRR-3 l 2 M-02EJ01 NA YES YES YES YES NO 1 PEJ01 B RESIDUAL IIEAT RLIOVAL PUMP C-6 ' PRR-3

          "M";'["'

g INSERVICE TESTING PROGRAM '$'focuon Po w e r ISI CLASS 1,2 & 3 PUMPS Engineering

                                                                                                                                                                 "^
              "s">'a m                           CALLAWAY NUCLEAR PjANT                                                                    a'vj $ o" y^/f1      3o,"3 N                                    TEST PARAMETE RS                                                                     j PUMP NUMBE R                   PUMP N AME     ) C P & ID AND R Dif 4AT ES
                                                                                                                                               . _ .           NOTEb         l 3                     SF'e t D INLET  DIF F.                          FLOW     Vf B R ATION dE ARING E                              PRES. PRES.                               RATE                     TEMP.                   I M-02EM01          I NA       YES   YES                                YES        YES              NO         1 PEM01 A                SAFETY INJECTION       2 i

PUMP E-6 PRR-3 M-02EM01 NA YES YES YES YES NO 1 PEM01 B SAFETY INJECTION 2 PUMP D-6 PRR-3 2 M-02EN01 NA YES YES YES YES NO PEN 01 A , CONTAINMENT SPRAY PRR-3 PUMP G-6 _ j , 2 M-02EN01 NA YES YES YES YES NO - PEM01 B CONTAINMENT SPRAY PRR-3 PUMP B-6 J No NO 1  ; PJE01 A EMERGENCY FUEL OIL 3 M-02JE01 NA YES YES YES ' E-7 PRR-2 i TRANSFER PUMP PRR-3

                                                                                                                                                                        ~

M-02JE01 NA YE5 YES YES NO 1 PJE01 B EMERGENCY FUEL OIL 3 NO TRANSFER PUMP A-7 PRR-2 PRR-3

                                                                            . 2. m ." .s. u . s..          _- ..

i NOTE 1

  • Pump discharge pressure is measured and compared '

with inlet pressure to determine differential ,' pressure. NOTE 2 - Pump inlet pressure is determined with level in ultimate heat sink. l a l 4 l l I

y , m- ,wa+=.A A A be'o .Me we- n 6 e s .> ~ en-- e e

     .                                                                                                                                         1 SECTION 3.2 INSERVICE TESTING PROGRAM - VALVES CALLAWAY PLANT 9

e

t1 SE"N'!,'"' INSERVICE TESTING PROGRAM rower ISI CLASS 1,2 & 3 VALVES Production U$ j',,, Engineering

                  'lly",'i.                                 CALLAWAY NUCLEAR PLANT P & ID      REVISION - D AT E      PAGE SYSTEM MAIN STEAM SYSTEM                                                M-02AB01          0           5/81     1 of 137
                                           /
                                                                                                        *2 4                          REMAC: S l

VALVE NUMBER T (k I I Y t gt n

                                      /                                                                    /

0 0 NA Notes 1, 3 V007 G-6 2 B 10" GA M l 0 0 NA Notes 1, 3 V018 G-3 2 B 10" GA M ) 5 Notes 1, 3 i 10" GA M 0 9 NA i V029 D-6 2 B 0 NA Notes 1, 3 V040 D-3 2 B 10" GA M 0 A0 C O/C BT C5 Note 5 PV1 G-3 2 B 10" GL FST CS , PIT RR BT Note 5 PV2 D-3 2 B 10" l GL A0 C O/C FST CS CS PIT RR PV3 D-6 2 B 10" GL A0 C O/C g g Note 5 PIT RR A0 C O/C BT CS Noto- 5 ' PV4 G-6 2 B 10" GL FST CS PIT RR

            )   i 7                                                         *~;    !.     ?;                 .       '

7 g 3 ni n 1 S o re K i e t f R c n o A ui g E M G 2 E edo n A R e. rE P oP . r 2 2  ? 2 2 2 2 2 1 e e e e e e e E 8 t t t t t t t T/ o o o o o o o o A 5 N N N N N N N N

                                       .il D.

N O I S O I V E R 4 2 D 0 I

                   &A 3

1 / P 2 0 M T - A N M R A T T T T T T G L T T S V V V V V V V V OEP V R R R R R R R R RLR O PAV A O O O O G3 E L O O O O 0 N& C I

                                /

T 2 ,U S1 ES N C C C C C C C C 4 TSY A g E LA A A A A A A A A CICW I S S S S S S S S S VI LA R L E A V V V V V V V V S S S S S S S S S N C 4 I 6 6 6 6 6 '6 6 6 J f v M C E C C C C C C C T S J Y S M 2 2 2 2 2 1 2 2 A E T S 6 7 7 6 5 5 7 7 N 1 1 1 1 1 F F F I 1 1 1 1 1 A R M E B

 '                           M
  "       ,' i,              U N                                              8         9       5        6        7
 ?'s ;,, ""i,        M       E 5

4 6 4 7 4 4 4 5 5 5

 'u N"

p E T S V L A 0 V 0 V 0 V 0 V 0 V 0 V 0 V 0 V S Y v S

                         !        1i[l                    llq                   I             '     !     ll
               'M"N'8"'                                                                                                       INSERVICE TESTING PROGRAM                                             cou, US',,,                                                                                                               ISI CLASS 1,2 & 3 VALVES                                       Production Engineering "il^,'. . .                                                                                                    CALLAWAY NUCLEAR PLANT SYSTEM                                                                                                                                                                    P & ID  REVISION - DATE     PAGE MAIN STEAM SYSTEM                                                                                                                        M-02AB02     0        5/81      3 of 137 VALVE NUMBER                                                          J                                           4     4           [4            [                 4                     REMARKS l

V058 F-5 2 C 6" SV SA C O RVT Note 2 V059 F-5 2 C 6" SV SA C O RVT Note 2 V065 D-7 2 C 6 SV SA C O RVT Note 2 1: V066 D-7 2 C 6" SV SA C O RVT Note 2 V067 D-6 2 C 6" SV SA C O RVT Note 2 V068 D-5 2 C 6" SV SA C O RVT Note 2 V069 D-5 2 C 6" SV SA C O RVT Note 2 V075 C-7 2 C 6" SV SA C O RVT Note.l '

                          "M " 'a'.','" '                         INSERVICE TESTING PROGRAM                                                                                      rower ISI CLASS 1,2 & 3 VALVES                                                                               Production UN',,,                                                                                                                                                  Enginuring
                              'iix",',,,,,                          CALLAWAY NUCLEAR PLANT P & 10                            REVISION - DATF.       PAGE SYSTEM MAIN STEAM SYSTEM                                                            M-02AB02                                 0         5/81         4 of 137 O   e                                           4                         REMARKS VALVE NUMBER T

9 0 4 4 g4 4., ii 6" SV SA C O RVT Note 2 V076 C-7 2 C 6" SV SA C O RVT Note 2 V077 C-6 2 C b i O RVT Note 2 j l V078 C-5 2 C 6" SV SA C I l 1 SV SA C O RVT Note 2 V079 C-5 2 C 6" NA Notes 1, 3 V085 D-4 2 B 4" GA M O O i

                                                                                                                                                                    .                            t M                     O          O   NA                                                     Notes 1, 3 V087             C-4     2    B     4"    GA BT   OP GL      AO                    C          O   FST  OP         10 HV 5             D-4     2     B    4" PIT  RR BT   OP GL       AO                   C          O   FST  OP          10                                         .-   .e llV 6            C-4     2     B    4" PIT  RR

_s

^ - - - - - - - - - -                                                             T - - - " ' - ' - - '
        "NN'.',"                                                 INSERVICE TESTING PROGRAM                                              rower U$',,,                                                             ISI CLASS 1,2 & 3 VALVES                                     Production Enginurin g "4",'i.                                                  CALLAWA'Y NUCLEAR PLANT                                                            -

SYSTEM P & ID REVISION - DATE PAGE MAIN STEAM SYSTEM M-02AB02 0 5/81 5 of 137 0 VALVE NUMBER v 4 4 g4 [ q- 4 4 Q REMAR KS . / . i BT CS IIV 11 11 - 3 2 B 2C" GA AO O C BTP OP 5 PIT RR

<        IIV 12             G-3                 2 B             2"     GL       AO     C        C      NA                             Note 3 1

BT CS IIV 14 F-3 2 B 28" GA AO O C BTP OP 5 i PIT RR  : IIV 15 F-3 2 B 2" GL AO C C NA Note 3 BT CS IIV 17 D-3 2 B 28" GA AO O C BTP OP 5 PIT RR ' ilV 18 D-3 2 B 2" GL AO C C NA Note 3 BT CS IIV 20 C-3 2 B 28" GA AO O C BTP OP 5 PIT RR

ilV 21 C-3 2 B 2" GL AO C C NA Note 3'

V

'N"Ed'"'
       ,                             INSERVICE TESTING PROGRAM                                             ro . . ,
  "8d'. ,                                   ISI CLASS 1,2 & 3 VALVES                                        Prod uction Enginuring "s y",'i . .                       CALLAWAY NUCLEAR PLANT SYSTEM                                                                      P & ID    R EVISION . D AT E       PAGE MAIN STEAM SYSTEM                                         M-02AB02         0         5/81           6 of 137
                      $                       %                                     N VALVE NUMBER                    f    p     p      gg      go    go                  f                            PEMARKS BT   OP llV 48          D-4    2    B    1"    GL    AO     O       C     FST  OP        5 PIT  RR BT   OP IIV 49          C-4    2    B    1"    GL    AO     O       C     FST  OP        5 RR                                                ;

PIT LV 7 B-4 2 B 2" GL AO C C NA Note 3 f.

                                                                                                                          ?

f-C NA Note 3 LV 8 D-5 2 B 2" GL AO C E-4 GL AO C C NA Note 3 LV 9 2 B 2" L LV 10 G-4 2 B 2" GL AO C C NA Note 3

                      "E"2'.','" '                                                INSERVICE TESTING PROGRAM                                          rower

. U$',,, ISI CLASS 1,2 & 3 VALVES Production Enginening "4",'i . CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION - DATE PAGE FEEDWATER SYSTEM M-02AE02 0 5/81 7 of 137 VALVE NUMBER O p p g c, o go d 4 4 REM AR KS

                                                                                                                            /

V120 C-4 2 C 14" CK SA O O/C CVT CS Note 5 V121 F-4 2 C 14" CK SA O O/C CVT CS Note 5 V122 F-7 2 C 14" CK SA O O/C CVT CS Note 5 , V123 C-7 2 C 14" CK SA O O/C CVT CS Note 5 1 V124 C-3 2 C 4" CK SA C O CVT CS Note 5 1 V125 F-3 2 C 4" CK SA C O CVT CS Note 5 , l V126 F-6 2 C 4" CK SA C O CVT CS Note 5 l l V127 C-6 2 C 4" CK SA C O CVT CS No te

  • S'

{ i

                         "L" ?,'.','" '                                           INSERVICE TESTING PROGRAM                                           rower Uf ll,,,                                               ISI CLASS 1,2 & 3 VALVES                                        Prod uction Engineering "s,"li.

CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION - DATE PAGE FEEDWATER SYSTEM M-02AE02 0 5/81 8 of 137 O 4 VALV'~ NUMBER cp p p g4 g g 4 U REMARKS V329 F-4 2 B 3" GA M C C NA Note 3 ' V330 C-4 2 B 3" GA M C C NA Note 3 , t e V331 C-7 2 B 3" GA M C C NA Note 3 i V332 F-7 2 B 3" GA M C C NA Note 3 BT CS FV 39 G-3 2 B 14" GA AO O C BTP OP 5 FST CS PIT RR BT CS B OP FV 40 C-3 2 B 14" GA AO O C p, 5 PIT RR RT CS P OP 5 FV 41 C-6 2 B 14" GA AO O C p g PIT RR BT CS 14" 5 FV 42 G-6 2 B GA AO O C NPp - PIT RR

b - l t f 7 8 3 n" 1 S K o it c "

              "            f o

R A

     ,   u '8       E            M
     .d             G            E
     . or E"         A P

9 R oP r 3 3 3 3 . 1 e e e e E 8 t t t t T A / o o o o D 5 N N N N N C O I S IV 0 E R 4 2 D 0 I E

                     & A P 2 0

M T - A N M R A ll GS L A A A A OEP V g N N N N RLR Dt PAV A C G3 E L S C C C N& C I T2 U , [ S1 N ES C C C C 4 TSY A p E LA O O O O CICW I S A A A A VI LA p R L E A L L L L S G G G G N C p I 1 1 1 1 8 v M B B B B E T S Y S 2 2 2 2 R E T A W 4 4 7 7 D - - - - s E G D D G - E R F E

 ','.,Y B

M

 '           ,' i,                 U   3       4       5         6 y                 N   4       4       4         4 M          E
 $' N' '                E T

V L V V V V E" U S A F F F F

  • V V S

l '

i V j ii V

e g n 7 ni 3 S K ion t e 1 R c n f A 3 3 3 ui g E G o M E

     . d    n                R                                                                     ,                ,

aroE A P 0 , 1 I oP 1 1 P 4 4 s s "s e e e e 'e t t t t t E 1 T 8 o o o o o N N N N N A D 5 / N 1 1 O I S R R-I V 0 R R E R V V 4 1 D 0 l L {

                   & A P 2                                                                                    A 0                P              P             P               A O                             N                   N M         T           M
                          -               O                            O A         N               4 R         A                            T              T             T               T                   T V        A GS L                                   V              V             V      A N

V C A N C N OEP V C C C RLR O.q PAV A C

                                          /

C

                                                         /

C

                                                                       /       O       O           O       O        O G3 E       L              O            O              O             O N& C I

4 T2,U C C C C O S1 ES N g

                                          /

O

                                                         /

O

                                                                       /

O O C O T ASY g E LA A A A A A S M CICW I S S S S M S M VI LA 4 R L K A K A E K K K A S A M C C C G C G C G N C E T g I S " " " " " " Y " " 8 8 6 6 6 6 8 S 0 1 R Oo E T v A B C B C B W C C C D E E F 3 3 3 3 3 3 3 Y 3 R A / I L 4 3 4 3 4 3 I 4 4 X - - - - F E E C U B D 1 1 F A R E B

    '                            M
     "          m
            ,', i U                                                                           9         1
    !' ,    ."v                   N            1            2             3        5       6           8 0       0           0      0         1 M           E          0              0             0 N'

M" D"i E T S V L A 0 V 0 V 0 V 0 V 0 V 0 V 0 V 0 V

   '                  Y           V S

i I I l1,l' 1 l

Standardized -l INSERVICE TESTING PROGRAM po e, n Ng, at Production Po . . , ISI CLASS 1,2 & 3 VALVES Engineering "s'y"5. - CALLAWAY NUCLEAR PLANT SVSTEM P & ID REVISION DATE PAGE AUXILIARY FEEDWATER SYSTEM M-02AL01 0 5/81 1} of 137 [ 4 8 4 VALVE NUMBER 9 p p gg gg gg c2 REMARKS C-4 C 8" CK SA C O CVT NA VRR-1 Note 4 V012 3 GA M O 0 NA Notes 1, 3 V014 B-3 3 B 8" l CK SA C O CVT NA VRR-1 Note 4 r V015 B-4 3 C 8" GL M O O NA Notes 1, 3 V028 G-5 3 B , 2" CK SA C O CVT OP V029 G-5 3 C 2" l 6" CK SA C O CVT CS Note 5 V030 H-5 3 C O O NA Notes 1, 3 V031 H-5 3 B 6" GA M M O O FA Notes-I, 3 V032 F-6 3 B 4" GA

                     4 2'8"'                                                                                          INSERVICE TESTING PROGRAM                                po. . ,

Prod uction f U0.., ISI CLASS 1,2 & 3 VALVES Enginenin g "4"'i . . CALLAWAY NUCLEAR PLANT 01 0 5 81 1 of 137 AUXILIARY FEEDWATER SYSTEM M-0 g g p 4 REMARKS VAL VE NUMBER I d4 t f s CS Note 5 I V033 F-7 2 C 4" CK SA C O CVT 4" GL M O O NA Notes 1, 3 , a V034 F-7 i 2 B n B 4" GA M O O NA Notes 1, 3 (; V035 11 - 6 3

                                                                                                                                                                                                         ).

j. O CVT CS Note 5 - V036 11 - 7 2 C 4" CK SA C k NA Notes 1, 3 V037 11 - 7 2 B 4" GL M O O O O NA ,Noces 1, 3 l V040 E-5 3 B 2" GL M 3 C 2" CK SA C O CVT OP V041 F-5 C 6" CK SA C O CVT CS Notd'5 V042 D-5 3

V "M "N'.',"' ' INSERVICE TESTING PROGPAM rower ISI CLASS 1,2 & 3 VALVEF eroduction

  $,,                                                                                                                                                           Enginee rin g "s y",'..                              CALLAWAY NUCLEAR PL. -            _
                                                                                   & lD          REVISION - DATE                                                PAGE SYSTEM AUXILIARY FEEDWATER SYSTEM                                    N     ..sL01                                0                              5/81      l_3 o f 137 v       4      4      Y 4      p    o          e 4     4                                                                      REMARKS VALVE NUMBER W
                                         /

B 6" GA M O O NA Notes 1, 3 V043 D-5 3 B 4" GA M O O NA Notes 1, 3 V044 C-6 3 5 C-7 C 4" CK SA C O CVT CS Note 5  !. V045 2 t l 4" GL M O O NA Notes 1, 3 V046 C-7 2 B , B 4" GA M O O NA Notes 1, 3 V047 D-6 3 i CK SA C O CVT CS Note 5 V048 D-7 2 C 4" GL M O O NA Notes 1, 3 V049 D-7 2 B 4" O NA Notos-1, 3 V052 B-5 3 B 3" GL M O

INSERVICE TESTING PROGRAM po. . ,

                  "Nj'@i"*'                                                                                                                        Production ro . ,,                                                          ISI CLASS 1,2 & 3 VALVES Easia'e'las "4">'i m                                                  CALLAWAY NUCLEAR PLANT P & ID  R EVISION - DATE     PAGE SYST EM AUXILIARY FEEDWATER SYSTEM                                                         M-02AL01       0        5/81    14 of 137 p       p               o                       4                       REMARKS VALVE NUMBER                                                               {     7g       t C      3"      CK     SA     C       O     CVT   OP V053         B-5       3 C     8"      CK      SA    C        O    CVT   CS                      Note 5 V054         B-5       3 Notes 1,      3              !

B 8" GA M O O NA V055 B-5 3 O O NA Notes 1, 3 V056 E-6 3 B 4" GA M 2 C 4" CK SA C O CVT CS Note 5 V057 E-7 O O NA Notes 1, 3 V058 E-7 2 B 4" GL M O NA Notes 1, 3 V061 G-6 3 B 4" GA M O G-7 2 C 4" CK SA C O CVT CS Notd'5" V062

V S M "N'.','" ' INSERV!OE TESTING PROGRAM ro . ,

     "$', , ,                                     ISI CLASS 1,2 & 3 VALVES                                 Prod uction Engineerin g
       'li"A.                              CALLAWAY NUCLEAR PLANT SYST EM                                                                         P & ID REVISION - D AT E    PAGE AUXILIARY FEEDWATER SYSTEM                                  M-02AL01     0         5/81     15 of 137
                      //                                                                      q            '-
                   ~

y/ l4 4,ys

                                           /
                                                                                 /}

G-7 B 4" GL M O O NA Notes 1, 3 V063 2 V066 D-6 3 B 4" GA M O O NA Notes 1, 3 CVT CS Pote 5 i, V067 D-7 2 C 4" CK SA C O 4" GL

                                                ^

O O NA Notes 1, 3 V068 D-7 2 B M 4" GA M O O NA Notes 1, 3 V071 B-6 3 B V072 B-7 2 C 4" CK SA C O CVT CS Note 5 , 4" GL M O O NA Notes 1, 3 V073 B-7 2 B G-6 B 6" GA M C C NA Note's~l', 3 V076 3

T

*E"$,"                                INSERVICE TESTING PROGRAM                                          ro. ,

ISI CLASS 1,2 & 3 VALVES Production

   "$0 ,,                                                                                                         Engineering "s'y",'i .                            CALLAWAY NUCLEAR PLANT P & ID  REVISION - D AT E      PAGE SYSTEM AUXILIARY FEEDWATER SYSTEM M-02AL01      0         5/81    16 of 137
                                                                                                            /
                                ! af    ,f     ,f l
                                                       ,f ' / $ $ Y f              f ll                   ""*"**

C C NA Notec 1, 3 V077 E-6 3 B 6" GA M GL MO O C BT Op Note 6 HV 5 11 - 6 2 B 4" PIT RR 5 O NA Note 3 IIV 6 G-6 2 B 4" GL AO O C BT Op Note 6 IIV 7 F-6 2 B 4" GL MO O , PIT RR GL AO O O NA Note 3 llV 8 E-6 2 B 4" GL MO O C BT OP Note 6 IIV 9 D-6 2 B 4" PIT RR GL AO O O NA Note 3 llV 10 D-6 2 B 4" GL MO O C BT OP Note 6' IIV 11 C-6 2 B 4" PIT RR

   ' Edit.',' " '                            INSERVICE TESTING PROGRA*4                                                  ro.u ISI CLASS 1,2 & 3 VALVES                                         Prod uction f

U l,'. ,, Enginuring "ly"a. CALLAWAY NUCLEAR PLANT P & ID REVISION DATE PAGE SYSTEM TiUXILIARY FEEDWATER SYSTEM M-02AL01 1 9/81 17 of 137 4' REMARKS VALVE NUMBER T I I I4 R th

                                                                                      /               '                                 ,

4" GL AO O O NA Note 3 ilV 12 B-6 2 B 6" BTF MO C O BT OP 15 Note 6 IIV 30 F-3 3 B PIT RR Sec. , e Note 6 i 6" BTF MO C O BT OP 15 IIV 31 E-3 3 B PIT RR Sec. C O BT OP 15 Note 6 IIV 32 C-3 3 B 8" BTF MO PIT RR Sec. C O BT OP 15 Note 6 IIV 33 B-3 3 B 8" BTF MO PIT RR Sec. O C BT OP 15 Note 6 HV 34 11 - 3 3 B 8" GA MO Sec. PIT RR O C BT OP Note 6 llV 35 D-3 3 B 8" GA MO 15 PIT RR Sec. 10" GA MO O C BT OP 15 Note 6 HV 36 B-3 3 B RR PIT Sec.

f S M "2'.d"

          ,                             INSERVICE TESTING PROGRAM                                                 eo  e, Uf !',,,                                          ISI CLASS 1,2 & 3 VALVES                                     Prod uction E" 8 '" * " '" s "4",'i .                                   CALLAWAY NUCLEAR PLANT                                                                          ,

SYSTEM P & 10 REVISION - D AT E PAGE REACTOR COOLANT SYSTEM M-02BB01 1 g/81 18 of 137 0 4 VALVE NUMBER v y 4 4 g4 4 R EM ARKS 1 C-8 3" GA M O O NA Notes 1, 3 8085 1 B E-4 1 C 3" CK SA O/C O/C CVT OP [ 8378 A 4 I 1 C 3" CK SA O,' O O/C CVT OP f 8378 B E-4 ( i l 8379 A E-7 1 C 3" CK SA O/(' O/C CVT OP 8379 B E-7 1 C 3" CK SA O/C O/C CVT OP AT CS 10" CK SA C O CVT CS Notes 5, 7 8948 A E-4 1 C VRR-10 AT CS .

                                   .10"           CK     SA      C      O    CVT  CS          VRR- 10         Notes 5, 7 8948 B         D-4   1     C AT   CS C-6   1     C    10"           CK      SA     C      O    CVT  CS          VRR-10 l Notes $,7 8948 C
"No" 'a'.', ' " ' INSERVICE TESTING PROGRAM ro e,
    "/$,,                                              ISI CLASS 1,? & 3 VALVES                                         Production Engineering

! 'Yr",'i . . CALLAWAY NUCLEAR PLANT SYSTEM P & lO REVISION - DATE PAGE i REACTOR COOLANT SYSTEM M-02BB01 1 9/81 19 of 137 VALVE NUMBER g (f p p gg O g c ' REMARKS EJ348 D E-6 1 C CK SA C O AT CS VRR-10 Notes 5, 7 10"I CVT CS E-5 1 C 6" CK SA C O AT CS VRR-3 Notes 5, 7 8949 A CVT RR . 8949 B C-5 1 C 6" CK SA C O AT CS VRR-3 Notes 5, 7 CVT RR 8949 C C-6 1 C 6" CK SA C O AT CS VRR-3 Notes 5, 7 CVT RR 8949 D G-6 1 C 6" CK SA C O AT CS VRR-3 Notes 5, 7 CVT RR V001 D-5 1 C 1" CK SA C O CVT RR VRR-3 Note 5 V007 G-4 2 B 3/4" GL M O O NA Note 3 1" SA C O CVT RR VRR-3 Note,5. V022 D-4 1 C CK 1 l -

INSERVICE TESTING PROGRAM po.e ,

                      'N"$'.f"                                                                                                         Production
                        $',,,,                                               ISI CLASS 1,2 & 3 VALVES Engineering
'Y,",' . CALLAWAY NUCLEAR PLANT P & ID FIEVISION . DAT E PAGE SYST EM REACTOR COOLANT SYSTEM M-02BB01 0 5/81 20 of 137
                                                  / / y//hqqs                                                /} g VRR-3        Note 5 V040                D-6       1         C   1"     CK     SA    C        O    CVT   RR l

1 i 3/4" GL M O O N r. Note 3 V046 B-6 2 B E-6 1 C 1" CK SA C O CVT RR VRR-3 Note 5 i V059 , 2" GL M O O NA Notes 1, 3 V065 F-8 1 B BT CS B-5 2 B 1" GL SO C O/C FST CS Note 5 ilV 8001 A PIT RR 1 BT CS B-4 1" GL SO C O/C FST CS Note 5

HV 8001 B 2 B PIT RR BT CS 1" GL SO C O/C FST CS Note 5

! HV 8002 A A-6 2 B PIT RR l BT CS 1" GL SO C O/C FST CS Notd 5 HV 8002 B A-5 2 B PIT RR

7 g 3 n 1 ni o re f it e c n o 6 ui g E 6 r e d n G1 wroE A P 2 oe 5 5 r . s s a e e t t E 1 T 8 o o A/ D 5 N O I S IV 0 q N N

                             )/

E t F 0 0 1 2 2 0 1 1 DB I

                   & 2B P

0 SR SR M CR CR T M A N R A s T T GS L TI TI OEP RLR PAV A V g BP C

                                      /

BP C

                                                  /

G3 E N& C I T2,U S1 L N y O C O C ES T ASY E LA CICW b O M O M I VISA R E L L

                              /,        A          A S         A                         G           G

. NI C

                              /        "

2 2 M E T S Y S y 1 B 1 B T N A L O

                              /          1         1 C

O R O T C

                              /          4 E

6 1 1 A l E R A B

   '", ,,",y
           ,'i
                               -         2 0

7 2 7 0

   'd }'f"s            M N"U E

T S Y S

                                -         8 V

P 8 V P

  !           i                       ll;f:i              l-   ,
                                                                 !4 ! !: !: I j   4 i
   "N."%','"'                              INSERVICE TESTING PROGRAM                                        rower ISI CLASS 1,2 & 3 VALVES                                Prod uction ufll,,,                                                                                                  Engineering "s,"l .                                CALLAWAY NUCLEAR PLANT P & 10  REVISION DATE     PAGE SYSTEM REACTOR COOLANT SYSTEM                                            M-02BB02     0       5/81    22 of 137 g     4       4      g4            q.O           4   4                   R EM ARKS VALVE NUMBER
                                                                                       /

i 1 6" RV SA C O RVT Note 2 8010 A 11 - 7 C. 1 C 6" RV SA C O RVT Note 2 8010 B 11 - 6 1 1 C 6" RV SA C O RVT Note 2 8010 C 11 - 5 V082 B-4 2 B 3/4" AGL M O O NA Note 3 i C-4 3/4" AGL M O O NA Note 3 V083 2 B C-4 1 C 2" CK SA C C NA Note 3 V084

                            .               I 1      B       3"
                                              ' GA      MO    O       OC     BT   OP                  Note 6 j

IIV 8000 A E-7 f PIT RR E-7 1 B 3" GA MO O O/C BT OP Note,6 llV 8000 B PIT RR

                                   *E'C.',"                              INSERVICE TESTING PROGRAM                                           rowe, ISI CLASS 1,2 & 3 VALVES                                     Prod uction "fd'.. .-                                                                                                   Engineering
                                       'lly"'i.                               CALLAWAY NUCLEAR PLANT P & ID REVISION - D ATE      PAGE SVSTEM M-02BB02      l         9/81      23 of 137 REACTOR COOLANT SYSTEM
                                                                            /
                                                      //              g / / /b y g s / ;6 y/
                                                                                          /

Notes 9, 10 IIV 8026 E-3 2 A 1" DIA AO C C AT RR 1" DIA AO C C AT RR Notes 9, 10 11V 8027 E-3 2 A B 1" GL SO C 0 BT OP Note 3 11V 8157 A E-1 3 1" GL SO C 0 BT OP Note 3 IIV 8157 B E-1 3 B BT OP PCV 455 A E-7 1 B 3" GL SO C O/C PIT RR i PCV 455 B A-4 1 B 4" BA AO O/C N/A N/A N/A Note 3 PCV 455 C B-4 1 B 4" BA AO O/C N/A N/A N/A Note 3 BT OP ,, PCV 456 A E-8 1 B 3" GL SO C O/C PIT l RR j

t 1"E','"' INSERVICE TESTING PROGRAM Power Production "ff.., ISI CLASS 1,2 & 3 VALVES Enginuring "4".'i . . CALLAWAY NUCLEAR PLANT P & ID REVISION - DAT E PAGE SYSTEM REACTOR COOLANT SYSTEM M-02BB03 0 5/81 24 of 137 O & VALVE NUMBER v y 4 4 Yg [O R EM ARKS I 4" GL M O O NA Note 3 Vll3 G-2 3 B 4" GL M O O NA Note 3 Vll4 G-2 3 B AT RR SA CVT CS Notes 5, 10 I vll8 C-5 2 A,C 2" CK O O/C i O NA Notes 1, 3 V119 C-4 2 B 2" GL M O CK SA O O/C CVT CS Note 5 . V120 C-4 1 C 2" SA O O/C CVT CS Note 5 V121 C-4 1 C 2" CK O O NA Note 3 V122 C-4 3 C 2" CK SA SA C O RVT Not6*2 V124 B-3 3 C 3/4" RV

  "E";'i["'

g INSERVICE TESTING PROGRAM po. ,1 ISI CLASS 1,2 & 3 VALVES Production ro.n Enginuring "ssn. CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION DATE PAGE REACTOR COOLANT SYSTEM M-02BB03 O 5/81 25 of 137 - VALVE NUMBER p p gg gO go A RIMARKS 9 I GL M O O NA l Note 3 V143 G-2 3 B 4" GL M O C NA Note 3 V144 G-2 3 B 4" AT RR O O/C CVT CS Notes 5, 10 V148 C-2 2 A,C 2" CK SA O NA Notes 1, 3 V149 C-4 2 B 2" GL M O i CK SA O O/C CVT CS Note 5 V150 C-4 1 C 2" t CK SA O O/C CVT CS Note 5 V151 C-4 1 C 2" CK SA O O NA Note 3 V152 C-4 3 C 2" C O RVT Mote 2 V154 B-3 3 C 3/4" RV SA

    "M2'8"'                                  INSERVICE TESTING PROGRAM                                             co.n "f$'. . ,                                      ISI CLASS 1,2 & 3 VALVES                                       Production Enginuring "4">'i . .                            CALLAWAY NUCLEAR PLANT P & ID   REVISION - DATE     PAGE SYST EM REACTOR COOLANT SYSTEM                                            M-02BB03                         26 of 137 VALVE NUM3ER                    g (p     p      p      g4             gg               4   4                      REMARKS f

4" GL M O O NA Note 3 V173 G-2 3 B 1 GL M O O NA Note 3 V174 G-2 3 B 4" AT RR SA O CVT CS Notes 5, 10 V178 C-5 2 A,C 2" CK O/C GL M O O NA Notes 1, 3 V179 C-4 2 B 2" 2" CK SA O O/C CVT CS Note 5 V180 C-4 1 C CK SA O O/C CVT CS Note 5 V181 C-4 1 C 2" SA O NA Note 3 V182 C-4 3 C 2" CK O P C O RVT Note 2 V184 B-3 3 C 3/4" RV SA

      'M " 's'.',' " '                         INSERVICE TESTING PROGRAM                                          '

rower Uf j',,, ISI CLASS 1,2 & 3 VALVES Prod u ction E" 8'"" 'i" 8

           'lix",'i.                            CALLAWAY NUCLEAR PLANT SYST EM                                                                        P & ID   REVISION - DAT E         PAGE REACTOR COOLANT SYSTEM                                   M-02BB03   _

O 5/81 27 of 137

                                                           /
                            / / y/;'A                       !

q q s /;6 y - V203 G-2 3 B 4" GL M O O NA Note 3 V204 G-2 3 B 4" GL M O O NA Note 3 AT RR V208 C-5 2 A,C 2" CK SA O O/C CVT CS Notes 5, 10 C-4 2" GL M O O NA Notes 1, 3 V209 2 B V210 C-4 1 C 2" CK SA O O/C CVT CS Note 5 V211 C-4 1 C 2" CK SA O O/C CVT CS Note 5 V212 C-4 3 C 2" CK SA O O NA Note 3 V214 B-3 3 C 3/4" RV SA C O kVT Note' 2

     "M28'"                                  INSERVICE TESTING PROGRAM                                         ro.u
       "$, , ,                                       ISI CLASS 1,2 & 3 VALVES                                   Prod uction En ginurin g "sy"A . .                            CALLAWAY NUCLEAR PLANT P & ID  REVISION - D AT E     PAGE SYST EM REACTOR COOLANT SYSTEM                                      M-02BB03     O          5/81     28 of 137 VALVE NUMBER                    v       p      p     g4        0    go           4   4                       REMARKS B      4"     GL     M      O       O     NA                          Note 3 V235         F-2    3 I

B 1" GL M O O NA Note 3 V236 F-2 3 4" GL M O O NA Nate 3 1 V237 F-2 3 B 3 B 1" GL M O O NA Note 3 l V238 F-2 B 4" GL M O O NA Note 3 V239 F-2 3 ' 9 B 1" GL M O O NA Note 3 V240 F-2 3 4" GI. M O O NA Note 3 V241 F-2 3 B B 1" GL M O O NA Note' 3 V242 F-2 3

8'A" 's'.',' " ' INSERVICE TESTING PROGRAM rower

                                                  !SI CLASS 1,2 & 3 VALVES                                             Prod uction E" 8'" '" '" 8 "A",',, ,.                           CALLAWAY NUCLEAR PLANT P & ID  REVISION - DATE              PAGE SYSTEM REACTOR COOLANT SYSTEM                                      M-02BB03      0         5/81             29 of 137 v       4     4         g4    0    q.O             4   4                              R EM ARKS VALVE NUMBER GL     M         O     O     NA                           Note 3 V261         C-2    3     B     3" 3"     GL               O     G     NA                           Note 3 V262         C-2    3     B                   M 3"     GL      M        O     O     NA                           Note 3 V263         C-2    3     B B     3"     GL      M        C     O     NA                            Note 3 V264         C-2    3 O/C    BT    CS                       Notes 5,           6 IIV 13           C-2    3     B     3"     GA      MO       O PIT   RR BT    CS                        Notes 5,          6 IIV 14          C-2     3     8     3"    GA      MO       O    O/C PJT    RR BT    CS                        Notes 5,          6 IIV 15          C-2     3     B     3"    GA      MO        O   O/C PIT   RR BT    CS                          Notes.5, 6 IIV 16           C-2    3     B     3"     GA      MO       O   O/C PIT   RR
     "M " 's'.',' "'                          INSERVICE TESTING PROGRAM                                           Power
        $', , ,                                        ISI CLASS 1,2 & 3 VALVES                                    Prod uction Enginening "s",',,,,,                             CALLAWAY NUCLEAR PLANT SYSTEM                                                                            P&ID      REVISION - DAT E    PAGE REACTOR COOLANT SYSTEM                                        M-02BB03        1        9/81    30 of 137
                                                                     /

4O O 4 REMARKS vat.VE NUMBER v 4 4 g4 4

                     /                 /                              /

O NA Note 3 11V 8141 A E-3 2 B 3/4" GL AO O L NA Note 3 IIV 8141 B E-3 2 B 3/4" GL AO O O O O NA Note 3 HV 8141 C E-1 2 B 3/4" GL AO NA Note 3 IIV 8141 D E-3 2 B 3/4" GL AO O O AT RR 2" GL MO O O/C BT OP 10 Note 10 llV 8351 A C-5 2 C PIT RR AT RR 2" GL MO O O/C BT OP 10 Note 10 llV 8351 B C-5 2 C RR PIT AT RR 2" GL MO O O/C BT OP 10 Note 10 IIV 8351 C C-5 2 C PIT RR ' AT RR O O/C BT OP 10 Note 10 Ilv 8351 D C-5 2 C 2" GL MO PIT RR

! i

i I 7 8 3

        "            1 ni                      S o"

i ' t f K R 0 0 u" c E G2 o A M 3 3 3 1 1

 . doI"a        A 3 E

R wr oP' P , 1 1 6 6 1 3 3 r 3 s s s s s e e e e e e 'e 1 e t t t t t t t t o E8 T o o o o o o o A/ N N N N N N N D 5 N N O SI I

                'J0 D

y

                             *)

0 ) 1 1 1 D0 I G

                 &B P 2                                             RSR         RSR 0

M T - RCR RCR A N M R A T T G S L A A A TTI TTI A N A N A N OEP V N N N ABP ABP RLR t PAV A O C C O C O G3 E L O O N& C I T2 S1, U N O O O O O C O O ES 4 T ASY p EC LA O O O O O CIS W I M E T M M M M M A A A VI LA S p R L Y S L L E G L L L L W L S A L A G G G G T G G N C O p I R I ' T " 4 " " " " " " N " 5 / 2 2 2 1 2 3 O 3 1 3 C g E M y U B B A A B B B L B O V 2 2 2 2 1 2 L 2 2 A C I M 3 3 2 2 3 7 7 E 3 - - l

                                              -                                                          F l

D D D D D E G C R E B 5 6 ' M 0 2 3

 "            m                 U                                      0           1       4       4      4
        ,  ' i.                             2         9       0                                           1

! , , "v i N E 0 2 3 1 1 8 1 8 1 8 8 M 8 N0l E V 2 V 5 V 5 V E" 8' T S Y L A V V I I v i l V I I V I I V I I S i

f l l D g 7 n 3 ni 1 ' o r

  • i u f " 0 0 3 t
                                #                                                            3       3 c n        E o    "            1          3                   1       3
     ,uig            G1         '                                                                      ,        ,

do n " , , , M3 , , arE 9 1 1 1 1 5 1 oP 5 r s s s s s s s e e e e e e e e t t t t t t t E 1 t o o o o o o o T 8 o N N N N A/ N N N N D5-N O I S f I V 0 E R y 1 0 0 1 G

                      & 2B        h P

0 RS S R RC C R M T M A N R A h T A T V T A A A A GS L TV N N N N AC N C A OEP V RLR [ PAV A C

                                               /           O         C        C       O        O       O         O G3 E         L O

N& C I T2,U $ C O O O O O O S1 ES N O T ASY E LA $ A S M A S A S M M M M CICW M E VISA I T R L L S $ K L G L G L G L G Y K L K E A S C G C C A A A A S C L N I O R $ " " " _ T 4 4 4 " " " " N " O 3 / / / 1 1 3 3 3 1 1 C E M E C, B C C, B B B B U A L A O V O

                              &                                                  2       2        2       2        2 2            2        2 L

A C I 3 7 6 4 3 M 4 7 7 - E I F E E D C C C C I C i

                                  "               1            8        9 1

5 3 8 9 9 9 0 0 1 0

     'a.

M ' 8 1 0 1 1 l 2 2

    %" $' ,"4            E T

S

                                   "#             3 8

0 V V V V V V V Y S l - !l lt l l

  "E"$'!,'"'                                        INSERVICE TESTING PROGRAM                                              ro. . ,

UN',,, ISI CLASS 1,2 & 3 VALVES Production Engineering "4",'i , - CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION . DATE PAGE CllEMICAL & VOLUME CONTROL SYSTEM fi-02BG01 0 5/81 33 of 137 VALVE NUMBER y g p p gg O g 4 4 C R EMAR KS IIV 8147 F-7 2 B 3" GL AO O O NA Note 3 AT RR llV 8152 F-2 2 A 3" GL AO O C T 10 Note 10 PIT RR IIV 8153 A D-7 1 B 1" "5 SO C C NA Note 3 IIV 8153 E D-7 1 B 1" GL SO C C NA Note 3 i llV 8154 A D-8 1 B 1" GL SO C C NA Note 3 1" GL SO C C NA Note 3 IIV 8154 E D-8 i B AT RR 10 Note 10 IIV 8160 F-3 2 A 3" GL AO O C { ] RR PIT 1" GL AO C C NA Note 3 llCV 123 E-5 2 B

7 g 3 n 1 ni S o re K i e t f R c n o A ui g E M edo n G4 A E R r E P3 op p 5 5 e e e # 1 t t E T8 o o A/ N N D5-N O I S I0 V E H 1 D I0

                   &G PB                SSR      SSR 2

M 0

                              /

CCR CCR T - A N M R A TT TT G S L TSI BFP TSI BFP OEP V RLR PA A og V C C G3 E L g N5 C I T U sin ES O O 4 T ASY g E LA M E O O A CICW I S T S A VI LA Y p R L S L L E A L O G G S C R N T p / I N O " C " 3 3 E g M U y L B O B V

                          &      Q L              1        1 A

C I M E 7

                          !               7
i. - -

(. G G R E B 0

 '                                         9 i

M U 5 6 N 4 4 f .

 '{; r "4".

o M E E V V V M" g T S L A C C

 "                    Y         V          L       L S

Y

l ,jI i  !  ! 7 g 3 ni n 1 o re f it e c n ui g E o n G 5 A

e. doe r P3 oP p 3 3 3 .

1 e e e E 8 t t t T A / o o o D 5 N N N N O I S f V0 I E R 2 D 0 I G

               & B        kw P 2 0

M T - A N M / R A r GS L A A A OEP V N N N RLR PAV A 4 G3 E L O O O N& C I T2,U f S1 ES N O O O T ASY r E LA h O CICW S M M A I M VI LA R E L E T S h[ A L F

                                                                             ~

S A Y S G G T B N C L I O R f " " " T 6 6 6 N O C r E E M B B B U L O V

                       &                   3           3            3 L

A C I 5 5 5 M - - - E l 1 1 G 1 1 m i C 0

 "      ,'i
        .",y                                                         3

' ,. 1 5 1

$' 0. "l          M E

2 0 0 2 V E" "8 T S Y V V T S Il l l LIll

  "N"$'.'/"'                              INSERVICE TESTING PROGRAM                                                                               ro.u ISI CLASS 1,2 & 3 VALVES                                                    Production U l,'f,,,

Enginuring "4".'i . CALLAWAY NUCLEAR PLANT P & ID REVISION - D AT E PAGE SYST EM CllEMICAL & VOLUME CONTROL SYSTEM M-02BG03 O 5/81 36 of 137

                                                                                                   !           e p                                        /4 4      T4             o              4                                          REMKRKS VALVE NUMBER                      v(     4                                               t
                                                                                                           /       .

I i 1" SA C O RVT Note 2 8118 E-4 2 C RV I 2 C 2" RV SA C O RVT Note 2 8123 11 - 3 i DIA O O NA Notes 1, 3 8341 D-6 2 B 4" M GA O O NA Note 3 8338 D-3 2 B 3" M NA tetes 1, 3 8394 E-6 2 B 4" DIA M O O l 3" DIA M O O NA Note 3 8398 A G-4 2 B B 3" DIA M O O NA Note 3 8398 B F-4 2 l D-3 2 B 3" GA M O O NA Note'3 8402 A

      'M"af.','"'                                          INSERVICE TESTING PROGRAM                                          po . . ,

U$',,, ISI CLASS 1,2 & 3 VALVES Prod uction Engineering "s,",'... CALLAWAY NUCLEAR PLANT P A ID PE VISION . D AT E PAGE SYSTEM M-02BG03 O 5/81 37 of 137 CilEMCIAL & VOLUME CONTROL SYSTEM

                                                                                                   /

VALVE NUMBER y v 4 4 gg O - 40 4 REMARKS

                                                                   /

8402 B D-3 2 B 3" GA M O O NA Note 3 8440 E-6 2 C 4" CK SA O O NA Note 3 8471 A C-6 2 B 6" GA M O O NA Notes 1, 3 2 B 6" GA M O O NA Notes 1, 3 8471 B B-6 8481 A C-4 2 C 4" CK SA C O CVT OP 8481 B B-4 2 C 4" CK SA C O CVT OP B 3" DIA M C C NA Motes 1, 3 8482 G-6 2 3" GA M O O NA Note,3. 8483 A D-3 2 B

i

                                'N"$'8"'                                INSERVICE TESTING PROGRAM                                        ro. . ,

U$',,, ISI CLASS 1,2 & 3 VALVES Prod uction Enginuring "s ,",' . CALLAWAY NUCLEAR PLANT P & ID REVISION - DAT E PAGE SYSTEM CilEMICAL & VOLUME CONTROL SYSTEM M-02BG03 O 5/81 38 of 137 VALVE NUMBER v p p g4 go go ilEMARKS 8483 B D-3 2 B 3" GA M O O NA Note 3 8484 F-6 2 B 3" DIA M O O NA 1,'otes 1, 3 8485 A C-4 2 B 4" GA M O O NA Notes 1, 3 GA O O NA Notes 1, 3 8485 B B-4 2 B 4" M 8497 E-4 2 C 3" CK SA O O NA Note 3 8546 A C-7 2 C 8" CK SA C O CVT CS Note 5 B-7 2 C 8" CK SA C O CVT CS Note 5 8546 B nom A. 8629 F-5 2 3 3" DIA M C C NA Notes 1, 3

                                         . 477d's"4T.
  d." 's'.',' " '                             INSERVICE TESTING PROGRAM                                        Po. . ,

Prod uct;on U$', ,, ISI CLASS 1,2 & 3 VALVES Enginuring

        'ity",',,,.                               CALLAWAY NUCLEAR PLANT P & 10 REVISION - DAT E     PAGE SYSTEM CllEMICAL & VOLUME CONTROL SYSTEM                               M-02BG03     O         5/81    39 of 137 i

Q R EM ARKS VALVE NUMBER g (k p p [4 M td ~ V091 C-4 2 C 2" CK SA C O CVT OP O O NA Notes 1, 3 V092 D-4 2 B 2" GL M B-4 2 C 2" CK SA C O CVT OP j V095 1 ) O O NA Notes 1, 3 V096 C-4 2 B 2" GL M 2" GL M O O NA Note 3 V100 D-3 2 B 2" GL M O O NA Note 3 V101 C-3 2 B 2" GL M O O NA Note 3 V102 D-2 2 B GL M O O NA Note 3 V105 C-3 2 B 2"

1 l. 8 7 ni a 3

           '             1 io" t

c a f 3 3 3 3 u '8 E Go , , a A , ,

u. ord E oP P 0 4 1 1 1 1 3 3 p 3 3 s s s s e e e e e e e e t

t t t t t t t E 1 o o o o o o o o T 8 N N N A/ D5 N O I S I V O y N N N N N E I F 3 6, M T D 0 I

                   &B P 2 G

0

                                  /

M A N R A i A A A A GS L A A A A OEP RLR PAV A V ys N N N N N O N O N O N C O O O O G3 E N& C I T2,U S1 L N g/ O O O O O O O C ES TSY E LA CICW A M E hf M M M M M M M M 1 VJ A I R E S S L L A T S Y S L

                                  /            L G

A I D A I D L G L G L G L G A I D C N I O R T O N // " " " " " " 4 y 2 2 2 4 3 2 2 / C 3 E M U B B B B B B L B B O V L

                                  /             2        2          2     3        3        3       3         2 A

C I M E l l C

                                  /             2 C

2 G 3 G 4 G 5 D 5 C 5 A 3 1 1 i

           ,'",,                                                     9     6        1        9       8         8 6        7                                  5       6         7 0        5
 !S                  M                         0 1

3 1 3 1 2 2 2 2 2

 'C"$. "i "I

E T S Y V V V V V V V V S l\ I , l -

INSERVICE TESTING PROGRAM po. . .

   'N"$'.?"'

UN',,, ISI CLASS 1,2 & 3 VALVES Production Enginening "4",'i . ,o GALLAWAY NUCLEAR PLANT P & lD REVISION - DATE " AGE SYSTEM CIIEMICAL & VOLUME CONTROL SYSTEM M-02BG03 0 5/31 41 of 137 D VALVE NUMBER p p p4 q. S q- 4 REM AR KS AT RR llV 8105 E-2 2 A 3" GA MO O C BT OP 10 Note 6 PIT RR IIV 8106 E-2 2 B 3" GA MO O C BT OP ' lote 6 PIT BR l 2" GL MO C O BT OP Note 6 l IIV 8109 E-5 2 B PIT RR l 1 2" GL MO O O/C BT OP Note 6 IIV 8110 E-3 2 B PIT RR , 2 B 2" GL MO O O/C BT OP Note 6 llV 8111 E-4 PIT RR 3" GL AO O O NA Note 3 FCV 121 D-4 2 B 3" GL AO O O NA Note 3 IICV 182 E-3 2 B 4" GA MO O C BT CS Notes.5, 6 LCV 112B F-6 2 B PIT RR

                          -2
                                    'M"$'.'/                                        INSERVICE TESTING PROGRAM                                             rown T', , ,                                                   ISI CLASS 1,2 & 3 VALVES                                      Production Enginu ring "4"'i.                                          CALLAWAY NUCLEAR PLANT SYSTEM                                                                                           P & ID REVISION - DATE       PAGE CllEMICAL & VOLUME CONTROL SYSTEM                                          M-02BG03     1        9/81       42 of 137
                                                         / / y / f p sy g , / )
                                                                                                                                                          ~

q -

                                                                             /          /

LCV ll2C F-6 2 B 4" GA MO O C BT CS Notes 5, 6 PIT RR 8483 A B-3 2 B 3" GA M O O NA zNote 3 V589 B-4 2 C 1" CK SA C O/C CVT OP V590 C-4 2 C 1" CK SA C O/C CVT OP llV 8357 A C-4 2 B 1" GL SO C O/C BT OP PIT RR llV 8357 B B-4 2 B 1" GL SO C O/C BT OP PIT RR FCV 111B G-d 2 B t 2" DIA A0 C N/A Hote 3 d e e I l

                                          "E"E','"'                                       INSERVICE TESTING PROGRAM                                          rower U                                                        ISI CLASS 1,2 & 3 VALVES                                 Prod uction Enginuring "ix",'i . .                                      CALLAWAY NUCLEAR PLANT SYST EM                                                                                   P & ID   HEVISION - DATE     PAGE CilEMICAL & VOLUME CONTROL SYSTF.M                                   M-02BG05       1        9/81   43 of 137 l
                                                                 //                  g//n ggi // q                                        /

Notes 1, 8461 A D-7 3 B 3" DIA M O O NA 3 8461 B D-7 3 B 3" DIA M O O NA Notes 1, 3 8463 B-7 3 B 3" DIA M O O NA Note 1,3 p 8465 A B-7 3 B 3" DIA M C C NA Note 3 8465 B A-7 3 B 3" DIA M C C NA Note 3 1 3475 A-7 3 B 1" DIA M O O NA Notes 1, 3 V147 B-6 3 C 3" SA C O CVT OP B-6 3 B 3" DIA M O O NA Notet-1, 3 Vl48

                                                                 "M"'5'8"'                                                                                      INSERVICE TESTING PROGRAM                                            ro. . ,

ISI CLASS 1,2 & 3 VALVES Prod uction Enginuring "s,".'i . . CALI..AWAY NUCLEAR PLANT P & ID R E VISION . D AT E PAGE SYSTEM CilEMICAL & VOLUME CONTROL SYSTEM M-02BG05 0 5/81 44 of 137 go 4 REMARKS VALVE NUMBER J g (p 4 y g4 l B 3" DIA M O O NA Notes 1, 3 V149 B-5 3 B 3" DIA M O O NA Notes 1, 3 V152 B-4 3 B 2" DIA M O O NA Note 3 V153 B-3 3 B-6 3 C 3/4" CK SA C NA NA Note 12 V155 O NA Notes 1, 3 V156 C-6 3 B 3/4" DIA M O DIA M O O NA Notes 1, 3 l V157 G-4 3 B 2" DIA M C C NA Note 3 V159 G-4 3 B 2" DIA M C C NA Note,3, V160 G-4 3 B 2"

    4"da'.'/"'                                              INSERVICE TESTING PROGRAM                                          ro . . ,

U$',,, ISI CLASS 1,2 & 3 VALVES Production Engineering "4",'i. CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION - DATE PAGE CIIEMICAL & VOLUME CONTROL SYSTEM M-02BG05 0 5/81 45 of 137

                             / / y/i;4 49,                                                           /,6 y                           -

V135 A-6 3 C 3" CK S ,' C O CVT OP l 1 DIA M O O NA Notes 1, 3 V166 A-6 3 B 3" C 3/4" CK SA C NA NA Note 12 V167 B-6 3

                                                                                                                                                +

NA Notes 1, 3 V168 C-6 3 B 3/4" DIA M O O DIA M O O NA Notes 1, 3 V169 G-4 3 B 2" 2" DIA M C C NA Note 3 V172 B-4 3 B B 2" DIA M C C NA Note 3 V173 B-5 3 3" CK SA C O CVT CS No te ,5., V174 A-4 2 C

                         'N."$'."'                            INSERVICE TESTING PROGRAM                                   Po.e ,
                           "$',, , ,                                  ISI CLASS 1,2 & 3 VALVES                               Production Engineering "s y",'. .                          C a.LLAWAY NUCLEAR PLANT SYSTEM                                                                    P & 10 REVISION - DATE      v' AT,e CIIEMICAL & VOLUME CONTROL SYSTEM                         M-02BG05    0         5/81     cu of 137
                                                         /
                         ~~'"~""

l l/ $l l'/h // // / f /'$ lll "~'"" l V177 B-2 2 B 2" DIA M C C NA Notes 1, 3 4 V183 A-4 2 B 2" DIA M C C NA Notes 1, 3 i V184 A-4 2 C 2" CK SA C NA NA Note 12 V187 B-2 2 8 1" DIA M C C NA Note 3 i V188 B-2 2 C 1" CK SA C NA NA Note 12 V209 B-6 3 B 3/4" GL M O O NA Notes 1, 3 V210 C-6 3 B 3/4" GL M O O NA Notes 1, 3 . V320 G-4 3 B 1" DIA M C C NA Note '3"

   'M " da'.',' "'                                        INSERVICE TESTING PROGRAM                                             ro.u U$ d',,,                                                     ISI CLASS 1,2 & 3 VALVES                                        Productior Engin .,ing "ly".'i .                                   CALLAWAY NUCLEAR PLANT                                                             __

SYST EM P & 10 REVISION - DATE PAGE CIIEMICAL & VOLUME CONTROL SYSTEM M-02BG05 0 5/81 47 of 137 ~

                                                                                                                  /

VALVE NUMBER v 0 y p gg gmo go 4 4 REMARKS V321 G-4 3 B 1" DIA M C C NA Note 3 V329 C-6 3 B 3/4" DIA M C C NA Note 3 V330 C-6 3 B 3/4" DIA M C C NA Note 3 V348 D-6 3 B 3/4" DIA M C C NA Note 3 V349 D-6 3 B 3/4" DIA M C C NA Note 3 IIV 8104 A-4 2 B 2" GL MO C O BT OP Note 6 PIT RR BT OP l FCV 110A B-3 3 B 2" GL AO C O FST OP PIT RR l e o l l

SM" 'a'.',"' ' INSERVICE TESTING PROGRAM rower U$ j',,, ISI CLASS 1,2 & 3 VALVES Production Engineering "4",'i . CALLAWAY NUCLEAR PLANT P & ID R EVISION . D A T E PAGE SYSTEM REACTOR MAKE-UP WATER SYSTEM M-02BLOl O 5/81 48 of 137 v 4 4 g4 q. g o q.O 4 R EM ARKS VAL.VE NUMBER

                                                                                   /                                                 /

AT RR 8046 B-3 2 A,C 3" CK SA O C CVT CS Note 11 AT RR BT CS IIV 8047 B-4 2 A 3" DIA AO O C FST CS 10 Note 11 PIT RR w i a e I l

c - - - - rowe, "M"?,'8 INSERVICE TESTING PROGRAM Production UN,', ,, ISI CLASS 1,2 & 3 VALVES Engineering

         'E",'i                                                              CALLAWAY NUCLEAR PLANT P & lD   REVISION . D AT E        PAGE SYSTEM M-02BM01         0         5/81        49 of 137 STEAM GENERATOR BLOWDOWN SYSTEM
                            / / g / / ,b y g s / J n B     4"         GA      M        O   O        NA                              Note 3 V001             F-7                                  2 4"        GA      M        O    O       NA                              Note 3 V002             F-6                                  2  B 2"        GL      M        C    C       NA                              Note 3 V004              F-8                                 2  B O       NA                              Note 3 V007             G-7                                 2  B    3/4"        GL       M       O O       NA                              Note 3 V008             G-7                                  2 B    3/4"        GL       M       O O       NA                               Note 3 V009             G-6                                  2  B    3/4"       GL       M       O C   C       NA                               Notes 1, 3 V010             G-7                                  2  B      1"        GL      M O    O       NA                                Note *3 V012             D-7                                  2  B      4"        GA       M 1

l 9 g 7 n 3 ni 1 S o re K it e f R A 3

   ,uig c n       E      o      M
  .d n            G0            E H

- .oProe A P 5 3 3 3 3 3 1 3 l _ r s e e e e e e t e 'et 1 t t t t t t E 8 o o o o o o o o T N N l N N N N N A / f D 5 N J IO S 0 I V E R A 1 D 0 4 l M

                   & B P 2 0

M T - A N M R A A A A A A A A A GS L N N N N N N N N OEP V RLR . q PAV A O C O O O C O O G3 E L 0s N& C I T2,U O C O O O C O O S1 ES N g T ASY g E LA M M M M M M M M CICW I S M VI LA E p R L T S A A E A Y A L L L G L G L G G G S S G G G N C p l I N " " W " 4 4 4 " " " O " "

                                                                       /      /       1      4        4 D                    4     2         /

3 3 3 W 0 O L v B R B B B B B B B B O T A R 2 2 2 2 2 2 E 2 2 N E G 8 7 7 6 7 7 6 M 6 - A - - E E E E C C E D D T S R E

               .,                   B
   '                                M
     ",     , i.                    U                                    9      0       1      3        4
            ,'",                    N             3     5         8 1      1      2       2      2        2 1
    'T.                 M           E 1

0 0 0 0 0 0 0 A T' , "J, E V L 0 V V V V V V V V L" T S Y A v S I1fll l l

SN" 'C.',"' ' INSERVICE TESTING PROGRAM po.u UE,, ISI CLASS 1,2 & 3 VALVES Production S Enginnsing "s,",'i . . CALLAWAY NUCLEAR PLANT SVSTEM P & ID f1EVISION DATE PAGE STEAM GENERATOR BLOWDOWN SYSTEM M-02BM01 0 5/81 51 of 137

                         //               g/ /b iy g s // q Note 3 V026              C-8     2         B     2"    GL      M     C      C    NA 3/4"    GL      M     O      O    NA                        Note 3 V029              C-7     2         B O    NA                        Note 3 V030              D-7     2         B   3/4"    GL      M     O NA                        Note 3 V031              D-6    2         B   3/4"    GL      M     O      O 1"   GL      M      C      C    NA                       Notes 1, 3 V032              C-7     2        B 2         B     4"    GA     M      O      O    NA                       Note 3 V034              A-7 B     4"    GA      M     O      O    NA                       Note 3 V035              A-6     2 2"    GL      M     C      C    NA                        Note *T V037              A-8     2         B
  'E"'s'.'/"'                           INSERVICE TESTING .oROGRAM                                       rower D,,                                         ISI CLASS 1,2 & 3 VnLVES                                  Prod uction Engineering "4",'i .                            CALLAWAY NUCLEAR PLANT P & ID                       PAGE SYST EM                                                                              { REVISION - DATE M-02BM01    l     0    5/81     52 of 137 STEAM GENERATOR BLOWDOWN SYSTEM
                                                                                                        /

VALVE NUMBER O p p gg q, go go 4 REMARKS V040 A-7 2 B 3/4" GL M O O NA Note 3 i V041 B-7 2 B 3/4" GL M 0 0 NA Note 3 V042 B-6 2 B 3/4" GL M O O NA Note 3 1" GL M C C NA Notes 1, 3 V043 A-7 2 B 3" C C AT RR Notes 1, 9, 11 V045 A-4 2 A GA M A 3" GA M C C AT RR Notes 1, >. 1 V046 A-3 2 2 B 2" GL M C C NA Notes 1, 3 Vl90 A-5 2" GL M C C NA No tds" 1, 3 V191 C-5 2 B

SN. "Ei"' INSERVICE TESTING PROGRAM ro ., Production us',,, ISI CLASS 1,2 & 3 VALVES Enginenin g

      'i," 'i .                                CALLAWAY NUCLEAR PLANT P & ID     REVISION - D AT E    PAGE SYSTEM STEAM GENERATOR BLOWDOWN SYSTEM                                 M-02BM01           0       5/81     53 of 137 4      g4       O    go              4      4                      REMARKS VALVE NUMBER                       yv      4                  g i

2 B 2" GL M C C NA Notes 1, 3 Vl92 D-5 B 2" GL M C C NA Notes 1, 3 Vl93 F-5 2 2" GL M C C NA Note 3 V343 A-7 2 B C-7  ?" GL M C C NA Note 3 V344 2 P GL M C C NA Note 3 V345 E-7 2 B 2" G-7 B 2" GL M C C NA Note 3 V346 2 BT CS 4" GL AO O C FST CS 10 Note 5 HV 1 F-5 2 B PIT FR BT CS E-5 2 B 4" GL AO O C FST CS 10 Note.5 HV 2 PIT RR

   "M3'.i"'                                 INSERVICE TESTING PROGRAM                                             ro. ,
     %,,                                            ISI CLASS 1,2 & 3 VALVES                                       Production l                                                                                                                     Engineering "s'y",'i .                            CALLAWAY NUCLEAR PLANT P & ID    R E VISION . D AT E      PAGE SYSTEM STEAM GENERATOR BLOWDOWN SYb.~<                                 M-02BM01         0        5/81        54 of 137 O

VALVE NUMBER v O p p gg O REMARKS BT CS GL AO O C FST CS 10 Note 5 IIV 3 C-5 2 B 4" PIT RR BT CS GL AO O C FST CS 10 Note 5 IIV 4 A-5 2 B 4" PIT RR G-7 2 B 1" GL SO C C NA Note 3 llV 19 N E-7 2 B 1" GL SO C C NA Note 3 IIV 20 1" GL SO C C NA Note 3 IIV 21 D-7 2 B IIV 22 B-7 2 B 1" GL SO C C NA Note 3 GL SO C C NA Note 3 llV 35 G-7 2 B 1" C C NA Note,3 ilV 36 E-7 2 B 1" GL SO

                                                         "E"$'8"'                                               INSERVICE TESTING PROGRAM                                        ro .,

ISI CLASS 1,2 & 3 VALVES Production f U l,'. , Engineering "s,"A . . CALLAWAY NUCLEAR PLANT SYST EM P & ID R EVISION . D AT E PAGE STEAM GENERATOR BLOWDOWN SYSTEM M-02BM01 0 5/81 55 of 137 vat.VE NUMBER p p gg O go 4 REMARKS y (P IIV 37 C-7 2 B 1" GL SO C C NA Note 3 llV 38 B-7 2 B 1" GL SO C C NA Note 3 ., i ilV 65 G-6 2 B 1" GL SO C C NA Note 3 E-6 2 B 1" GL SO C C NA Note 3 IIV 66 C-6 1" GL SO C C NA Note 3 IIV 67 2 B 2 B 1" GL SO C C NA Note 3 11V 68 B-6 i i i d e 1

T 's.','"' INSERVICE TESTING PROGRAM ro.u ISI CLASS 1,2 & 3 VALVES Production U$d',,, Enginening "s,",'i . CALLAWAY NUCLEAR PLANT P & lD REVISION . D AT E PAGE SYSTEM BORATED PEFUELING WATER STORAGE SYSTEM M-02BN01 0 5/81 56 of 137 i 7 4 REMARKS VALVE NUMBER (k [ [ [4 $

                                                                                                        /      /

C C NA Notes 1, 3 . 8717 B-5 2 B 8" GA M O O NA Notes 1, 3 V0ll F-4 2 B 24" GA M C NA Notes 1, 3 C-3 2 3 2" GL M C V013 i C C NA Notes 1, 3 V014 A-3 2 B , 2" GL M C NA Notes 1, 3 F-3 2 B 6" GA M C V017 O O /C BT OP Note 6 IIV 3 C-3 2 B 12" GA MO PIT RR MO O O/C BT OP Note 6 IIV 4 A-3 2 B 12" GA PIT RR I BT OP Note.6 B-5 2 B 8" GA MO O O/C IIV 8806A PIT RR

ro.e,

                 Jg"{ij'8'                           INSERVICE TESTING PROGRAM ISI CLASS 1,2 & 3 VALVES                                     Production ro. ,                                                                                                       Engineering
                      'Y " 'i .                           CALLAWAY NUCLEAR PLANT P & ID H EVISION - D AT E    PAGE SYST EM BORATED REFUELING WATER STORAGE SYSTEM M-02BN01     .1          9/81      57 of 137
                                ,    /     /  B y/l44y:(!}q 8"     GA        MO    O       O/C   BT      OP                     Note 6 IIV 8806B         E-3    2 PIT     RR                                                   l l

BT UP Note 6 IIV 8812A B-3 2 B 14" GA MO O O/C PIT RR l O/C BT OP Note 6 IIV 8212B D-3 2 B 14" GA MO O PIT RR O C BT CS Note 6 liv 8813 B-7 2 B 2" GL MO PIT RR C C NA Note 3 IICV 8800A E-5 2 B 3" GL AO C C NA Note 3 HCV 8800B, E-5 2 9 3" GL AO C O BT Note 6 LCV 112D A-5 2 B 8" GA MO CS PIT RR O BT CS Note 6 LCV 112E E-3 2 B 8" GA MO C PIT RR

 4"$'.', ' " '                           INSERVICE TESTING PROGRAM                                        ro.,:

U$'. ,, ISI CLASS 1,2 & 3 VALVES Production Enginn ring "4",'i, . CALLAWAY NUCLEAR PLANT P & 10 REVIS80N - DA Tf PAGE SYSTEM FUEL POOL COOLING AND CLEAN-UP SYSTEM M-02EC01 0 5/81 58 of 137 __ p s / o l

                                                                                                                "'"^""
"^"""""
                       ,/     g Y   ' E    j~ j~ $ ~ f  E                 ~

f f *~ Sf D-7 D 2" GL M C C NA Note 3 V019 3 2" GL M C C NA Note 3 V020 E-7 3 B 11 - 5 3 B 12" BTF MO O O/C BT OP Note 6 ilVll PIT RR 12" BTF MO O O/C BT OP Note 6 llV12 F-5 3 B PIT RR ' l

St a n d a rdited rt;;i;- INSERVICE TESTING PRdGRAM po. , ISI CLASS 1,2 & 3 VALVES Production

%er Enginnring
"s" lim CALLAWAY NUCLEAR PLANT P & iD FIEVISION - D AT E PAGE SYST EM FUEL POOL COOLING AND CLEAN-UP SYSTEM M-02EC02 0 5/81 59 of 137
                                                      /
                            / / y / / p g .::p / J                        C    AT    RR q

Notes 1, 9, 11 V083 C-6 2 A 6" GA M C C AT RR Notes 1, 9, 11 V084 C-5 2 A 6" GA M C C AT RR Notes 1, 9, 11 V087 D-7 2 A 6" GA M C C C AT RR Notes 1, 9, 11 V088 D-7 2 A 6" GA M C AT RR Notes 1, 9, 11 2 A 3" GA M C V095 B-5 AT RR Notes 1, 9, 11 2 A 3" GA M C C V096 B-5

Standardized Nger INSERVICE TESTING PROGRAM po. , ISI CLASS 1,2 & 3 VALVES Prod uction Po w e, Enginening "s"A.- CALLAWAY NUCLEAR PLANT P & ID REVIS40N DATE PAGE ESSENTIAL SERVICE WATER SYSTEM M-i?2EF01 0 5/81 60 of l?7

                                                                                                                                                                  /

k REMARKS VALVE NUMBER / p p g4 [ td 4 4 30" CK SA C O CVT OP V001 G-5 3 C O NA Notes 1, 3 V002 G-4 3 B 30" BTF M O 30" CK SA C O CVT OP V004 D-5 3 C O NA Notes 1, 3 V005 D-4 3 B 30" BTF M O C C NA Notes 1, 3 V093 F-3 3 B 30" BTF M C NA Notes 1, 3 V094 E-3 3 B 30" BTF M C C C NA Notes 1, 3 V162 G-7 3 B 1" GA M C NA Notes 1, 3 V163 E-7 3 B 1" GA M C l

                                             4" 's'.',' " '                                       INSERVICE TESTING PROGRAM                                   Powe r UN',,,                                                   ISI CLASS 1,2 & 3 VALVES                               Production Enginee ring "i," 'i . .                                       CALLAWAY NUCLEAR PLANT SYSTEM                                                                                       P & ID FIEVISION DATE     PAGE ESSENTIAL SERVICE WATER SYSTEM                                       M-U2EF01      0       5/81    61 of 137
                                                                        //                   y/l4 gyl /} q                                                         -

V245 11 - 5 3 B 1" GL M O O NA Notes 1, 3 V246 E-5 3 B 1" GL M O O NA Notes 1, 3 V336 F-4 3 B 1" GA M C C NA Notes 1, 3 V337 D-3 3 B 1" GA M C C NA Notes 1, 3 IIV 65 B-6 3 B 30" BTF MO O C BT OP Note 6 IIV 66 B-3 3 B 30" BTF MO O C BT OP Note 6 IIV 97 F-6 3 B 3" GA MO O C BT OP Note 6 1 liv 98 D-6 3 B 3" GA MO O C BT OP Note *6

( 7 g 3 n! r n 1 S o e K . it e f R c n o A ui g E M r G E e do n A 2 R wrE P 6 oP P 6 6 1 e e E 8 t t T / o o A 5 N N D N O I S V 0 I E R 4 1 D 0F I

                        & E P 2 U            P     P M          T            -           O     O A                      M N            L                           -

R A GS L T T OEP V B B _ RLR O.q PAV A _ G3 E N& C I L O g O O T2,U S1 ES N g C C TSY A y E LA O O CICW M M VISA I g R L M L E E A T A G A G

 .      S          C S

Y

 -      NI S   g R                  "
 .                             E            "

3 3

 -                             T A

W v

 ,                             E                   B C             B I
  .                            V R

E _ S 3 _ 3 L A _ I T 4 4 _.. N E - - S F D _ S R E E

                     .              B
        '                           M        9      0 U

N 1 2 f

        'C s   ' , "4      M E

E V V D T V. t D E" u S A P P

     . S                  Y        V S
     .                                 !j              , :   i,I

l 7 g 3 n 1 S ni o er K it e f R A c n ui g E o M 3 3 3 3 3 3 3 3

 . d n       G 3           E A             R                   ,        ,        ,        ,
 . roE       P 6                      ,

1 1 1 1 1 1 1 oP 1 . r s s s s s s se s e e e e e e 1 e t t t t t t t E8 t o o o o o o o T A / o N N N N N N N D5 N N O I S O I V E R 4 1 D0 J P P E 2 0 M T - A N M R A A GS L A A A A A A A N N N N N N N N OEP V RLR og PAV A O O O O O O O O G3 E L N& C I T2,U O O O O O S1 ES N g O O O T ASY g E LA M M M M M M CICW I S M M VI LA M p R L E T A A A A A A A A E A S G G G G G G G G S C Y N S I p R E " " " " " " " " T 4 4 4 4 4 4 4 4 A O W E C B B B B B B B B I V R E S 3 3 3 3 3 3 3 3 L A I T 5 4 5 4 5 4 N 5 4 E - - - - F F E E S G G F F S E R E B ' . M

       ,' i,                  U         9        0        2        3        5      6        7       8

?. $' ,"y N 3 3 3 3 3 3 2 3

       ,          M           E                                                    0        0       0

$' $"l 8's" E T S V L A 0 V 0 V 0 V 0 V 0 V V V V Y V S Ill  ! l 1 ,

              "'                                                                                                             Poon
    'M";'ij' g         ,                                       INSERVICE TESTING PROGRAM ISI CLASS 1,2 & 3 VALVES                                      Production r, , , ,                                                                                                                Enginening "4".'i . -                                       CALLAWAY NUCLEAR PLANT P & 10   REVISION - DATE     PAGE SYSTEM M-02EP01       0        5/81     64 of 137 ESSENTIAL SERVICE WATER SYSTEM VALVE NUMBER                                y   g     p      p     g4                gg            4   4        U             R EMARKS O       O        NA                            Notes 1,    3 V052                    G-7   3      B        8"     BTF    M O        NA                            Notes 1,    3 V053                    G-6   3      B        8"     BTF    M      O                                                                l l

O NA Notes 1, 3 4" GA M O V054 G-7 3 B l O NA Notes 1, 3 GA M O V055 G-6 3 B 4" l O NA Notes 1, 3 V061 D-5 3 B 4" GA M O NA Notes 1, 3 4" GA M O O V062 D-4 3 B Notes 1, 3 GA M O O NA V063 D-5 3 B 4" NA Notes 1, 3 GA M O O V064 D-4 3 B 4' l L

8 1L"#/.'," INSERVICE TESTING PROGRAM rower ISI CLASS 1,2 & 3 VALVES Production

        %,,                                                                                                                              Engineering
             'i,"Am                                                    CALLAWAY NUCLEAR PLANT P & l0  REVISION DATE     PAGE SVST EM ESSENTIAL SERVICE WATER SYSTEM                                                    M-02EF01      0       5/81     65 of 137 0                   4                    REMARKS   +

VALVE NUMBER v O 4 4 g4 4 V065 B-5 3 B 4" GA M O O NA Notes 1, 3 V066 B-4 3 B 4" GA M O O NA Notes 1, 3 V068 C-5 3 B 4" GA M O O NA Notes 1, 3 V069 C-5 3 B 4" GA M O O NA ilotes 1, 3 V071 C-6 3 D 4" GA M O O NA Motes 1, 3 C-6 GA M O O NA 90tes 1, 3 V072 3 B 4" V076 B-6 3 C 2" CK SA O C CVT OP Notes 1, 3 V077 B-7 3 B 4" GA M O O NA

                                                                                        "M2','"'                                                                       INSERVICE TESTING PROGRAM                                              rower "fA'. . ,                                             ISI CLASS 1,2 & 3 VALVES                                         Production Engineering "4"'i e .                            CALLAWAY NUCLEAR PLANT SYSTEM                                                                                                                                  P & ID    R E VISION . DAT E        PAGE
l. ESSENTIAL SERVICE WATER SYSTEM' M-02EF01 C 5/81 66 of 137 g g VAltfE NUMBER p p g4 g 4 4 REMARKS r

l i B 4" GA M O O NA Notes 1, 3 V078 B-6 3 1 B 8" BTF M O O NA Notes 1, 3 V079 D-7 3 8" BTF M O O NA Notes 1, 3 i V080 D-6 3 B t l GA M O O NA Notes 1, 3 V081 D-7 3 B 4" , M O O NA Notes 1, 3 V082 D-6 3 B 4" GA

                                                                                                                                                                                                                                                              *c5 4

O NA Notes 1, 3 V104 H-8 3 B 30" BTF M O NA Notes 1, 3 V107 H-8 3 B 30" BTF M O O O NA No te s*.1, 3 Vll3 E-8 3 B 30" BTF M O e

    'M"'["*'

g INSERVICE TESTING PROGRAM rower ro . . , ISI CLASS 1,2 & 3 VALVES Production Engineering "ir">'i . . CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION . D ATE P/4G E ESSENTIAL SERVICE WATER SYSTEM M-02EF01 0 5/81 67 of 137 VALVE NUMBER v 4 4 g4 O q,0 4 REMARKS 3 B 30" BTF M O O NA Notes 1, 3 . Vll6 E-8 l BTF O O NA Motes 1, 3 - V272 G-7 3 B 8" M l e 8" BTF M O O NA Notes 1, 3 V273 G-6 3 B l 8" BTF M O O NA Notes 1, 3 V274 D-7 3 B 8" BTF M O O NA Notes 1, 3 V275 D-6 3 B D 30" BTF MO O C BT CS Note 6 IIV 23 F-7 3 PIT RR 30" BTF MO O C BT CS Note 6 IIV 24 E-7 3 B PIT RR B 30" BTF MO O C BT CS Note 6.. IIV 25 F-7 3 PIT RR

If _F - 7 g 3 n 1 ni o r e f it e ~ c n E o ui g r e do n G 8 ~ A 6 " . wrE P . oP 6

  • r' '

e 1 t E 8 o . T A/ N D. 5 N O I fi

 -                      S0 I

V

 -                      E R                                                                      .

i 1 j M O0 l

                          & F P

E 2 0 l/ SR CR PPR OOR T - A R N A M s TI T TSI TT GS L BP BFP OEP RLR PAV A V f'e C C

   - G3 E N& C I

T2,U S1 ES L N

                                      }'/        O              O T ASY                          hj E LA                                       O M

O A CICW I VI LA R E S L M E T

                                     'j           F              L G

S A S Y T B N C S I R E T

                                     #l           "

0 3 2 A W E C I lf B B V R E S l 3 3 L A I T N E l 7 E 7 B S S f E " m e

                 ,' i.
                 ."y
                                          ~

6 2 4 4 N' $."s M V V E" E T S

                                          "~        I I

I I

  • Y S
                                           ~

fIll Ill! lll l I 1l l i

                                                                                   'No"'a'.','"'                                INSERVICE TESTING PROGRAM                                                 row e, ISI CLASS 1,2 & 3 VALVES                                           Production "f"-e r Engineering "4",'i . m                              CALLAWAY NUCLEAR PLANT SYST EM                                                                                                     P & ID      REVISION - DATE       PAGE ESSENTIAL SERVICE WATER SYSTEM                                    M-02EF02           O       S/81       69 of 137
                                                                                                                       /                                                          /

VALVE NUMBER (p p p g4 O q.O 4 4 R EM APKS V039 F-7 3 B 4" GA M O O NA Notes 1, 3 GA M O O NA Notes 1, 3 - V040 F-6 3 B 4" V041 F-7 3 B 2 " GA M O O NA Notes 1, 3 V042 F-6 3 B 2" GA M O O NA Notes 1, 3 ' V046 E-6 3 C 2" CK SA O C CVT OP D-7 GA M O O NA Notes 1, 3 V047 3 B 4" 4" O O NA Notes 1, 3 - V048 D-6 3 B GA M 4" GA M O O NA No tes',3,, 3 V056 F-4 3 5

7 g 3 n 1 ni S o er K i e t f R c n o A ui g E M 3 3 3 3 3 3 r G E 3 3 e d n wr oE A 0 R , , , , , P , , , oP 7 1 1 1 1 1 1 1 r 1 s s s s s s s "s e e e e e e e e 1 t t t t t t t t E T 8 o o o o o o o o A/ N N N N N N N N D5 N O I S0 I V E R 4 2 D0 I 4

                     & F   E P

2 0 M T - A N M R A _ A A A A A A G L A A N N N S N N N N N OEP V RLR og PAV A O O O O O O O O G3 E L O N& C I g T2,U O O O O O O O O S1 ES N g TSY A g E LA M M M M M M M M CICW I S VI LA M E p R L T S A F A A A A F F T E T G G G G T S A Y S G B B 3 N C p I R E " " " " " " " T " 6 4 4 6 0 A 4 1 2 2 1 3 W O E v C I B B B B B B V B B R E S 3 3 3 3 3 3 3 3 L A I T N 3 7 6 4 3 3 2 E 3 - - - S - - C C B 5 C G S F G E R E

                  .                B
   '                               M
   "         ,'i                   U 0      8
   '/        .                     N             8         3          4      8        9 7                                                           0
   $ A'$ . "4" , EM                E 5        5         8          8      8 0

8 0 9 0 1 V. 0 0 0 M"U T t 0 V V V V V V V S Y A V V S _ P I  ;' i ,

S M "N'.'," INSERVICE TESTING PROGRAM rower "ff.., ISI CLASS 1,2 & 3 VALVES Production E" sin enin g "s,",'i . CALLAWAY NUCLEAR PLANT SVS*EM P & 10 FIEVISION - D AT E PAGE ESSENTIAL SERVICE WATER SYSTEM M-02EF02 1 781 71 of 137

                                                                                                                                                                                                       /

l

                                                                                              / / g//bggs                                                                                    // q Notes 1, Vll7                                       C-2                                                                    3  B  30"   BTF     M          O      O   NA                                              3 V146                                         F-7                                                                  3  B  2"     GA     M          O      O   NA                                   Notes 1, 3 i

GA M O O NA Notes 1, 3 V147 F-6 3 B 2" C-7 2" GA M O O NA Notes 1, 3 V148 3 B _ 2" O O NA Notes 1, 3 V149 C-6 3 B GA M AT RR G-7 2 A 14" BTF MO O O/C BT OP 30 Notes 6, 10 llV 31 PIT RR AT RR 2 A 14" BTF MO O O/C BT OP 30 Notes 6, 10 IIV 32 B-7 PIT RR AT. un llV 33 G-7 2 B 14" BTF MO O. 0/C' . BT OP 30 N te 6 .10 PIT RR

rowe, "L"'a'8"' INSERVICE TESTING PROGRAM Production

       "$'. . ,                                                                                             ISI CLASS 1,2 & 3 VALVES E"sinening "J,"'i . .                                             CALLAWAY NUCLEAR PLANT P & ID            MF 4 ISION - D AT E        PAGE SYSTEM ESSENTIAL SERVICE WATER SYSTEM                                                                                                          M-02EF02                1 9/81     _

72of 1 37 v 4 g4 O q.O ,l> REMARKS VALVE NUMBER y

                                                                                                                                       /

AT RR ' 14" BTF O O/C BT OP 30 Notes 6, 10 llV 34 B-7 2 B MO PIT RR G-2 3 B 30" BTF MO C O BT OP Note 6 llV 37 PIT RR BTF MO C O BT OP Note 6 , IIV 38 C-2 3 B 30" ' PIT RR 1 i B 30" BTF MO O C BT OP Note 6 IIV 39 F-2 3 ~ PIT RR 30" BTF MO O C BT OP Note 6 IIV 40 D-2 3 B RR PIT l B 30" BTF MO O C BT OP Note 6 llV 41 E-2 3 PIT RR 4 BTF MO O C BT OP Note 6 IIV 42 D-2 3 B 30" PIT RR BT OP ' IIV 43 E-7 3 B 2 GL AO O C FST OP PIT RR

  'E"Ei""'                                               INSERVICE TESTING PROGRAM                                                  roaer ISI CLASS 1,2 & 3 VALVES                                          Production f

U l,'. . , Enginenin g "s",'i . . CALLAWAY NUCLEAR PLANT , SYSTEM P & ID REVISION - OATE PAGE ESSENTIAL SERVICE WATER SYSTEM M-02EF02 1 9/81 73 of 137 O O REMARKS VALVE NUMBER v 4 4 g4 q. 4 AT RR llV 45 G-6 2 B 14" BTF MO O 0/C BT OP 30 Note 6,10 ' PIT RR AT RR llV 46 B-6 2 B 14" BTF MO O 0/C BT OP tiote 6,10 ,, PIT RR 30 AT RR 10" BTF MO O C BT OP Notes 6, 10 i IIV 47 G-6 2 A 30 PIT RR , AT RR 10" BTF O C BT OP 30 Notes 6, 10 llV 48 C-6 2 A MO PIT - RR AT RR A 14" BTF C O/C BT OP 30 Notes 6, 10 llV 49 G-6 2 MO PIT RR AT RR 2 A 14" BTF MO C O/C BT OP 30 Notes 6, 10 IIV 50 B-6

                                                                                            '3 IT    RR G-4       3      B               24"     BTF       MO   O/C        O'     BT     OP                       Note 6 llV 51 PIT     RR C-4             B               24"     BTF       MO               O      BT    OP                       Note 6..

llV 52 3 0/C PIT RR l

  *s"#/.','"'                                   INSERVICE TESTING PROGRAM                                            Pow ,

UN',,, ISI CLASS 1,2 & 3 VALVES Prod uction Engineering "i,",'i . CALLAWAY NUCLEAR PLANT SYST EM P & ID REVISION - DATE PAGE ESSENTIAL SERVICE WATER SYSTEM M-02EF02 0 5/81 74 of 137

                                                                                         /

VALVE NUMBER y v 4 4 g4 4O go 4 U REMARKS

                              /       /

HV 59 G-3 3 B 24" BTF MO O/C C BT OP Note 6 PIT RR IIV 60 C-3 3 B 24" BTF MO O/C C BT OP Note 6 ' PIT RR c. HV 87 E-3 3 B 1" GA SO O C BT OP PIT RR IIV 88 D-3 3 B 1" GA SO O C BT OP .- PIT RR  ; Os

r

  • T g 7 n 3 ni 1 S o re K it e R f A c n o 3 3 ui g E M 3 3 r G E e d n R aroE A P 5 , , ,

1 oP 7 1 1 1 - r s s s s 1 e e e e t t t E 8 t o T o o o A / N N N N D 5 N O I S V0 I E o R 4 1 D 0 I G

                   &E                                                               P                P P2                       P                 P                                      O 0                     O                 O                     O M          T           -

A M N R A A T A A T A T GS L. T N N V N V V N V C C OEP V C C RLR O C C PAV A C

                                            /       O C
                                                              /       O       C     /

O O / O G3 E L O O O N& C I T2,U C O C C O C C O S1 ES N g T ASY ' g A E LA A S M A S M M S M A S CICW I S VI LA M E 4 R L T K F K F L K F T K C E A S C T C T B G C B S C Y S B N '<, I R " " " " " 2 0 0 0 E 0 0 0 0 2 2 2 2 T 2 2 2 A W v G B C B C N C B C B I L O O C 3 3 3 3 3 3 3 3 T N E N 2 3 3 3 O 3 3 3 3 P - - - - D C M G G E E E D O C R E B M U 3 4 7 8 9 2 3 6 1

   ', ,"                            N          0                 0        0       0    1          1
            ,"4                     E 0                               0         0      0 0

J' j M 0 0 0 0 j E V V V V V V V V V U T L - k S A S Y V S l fll, l

8"'a'?"' 9 INSERVICE TESTING PROGRAM rower Uf$'. . , ISI CLASS 1,2 & 3 VALVES Production Enginening "s",'i. CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION - DAT E PAGE COMPONENT COOLING WATER SYSTEM M-02EG01 1 V81 76 of 137

                                                                                                                                             /

g 2l } ,$ fr ~ $ ' $r h $ f^ $ "'"""**

                                                                                                                                                             /

V017 C-3 3 B 20" BTF M O O NA Notes 1, 3 V018 D-2 3 B 2" GL M C C NA Notes 1, 3 c V130 D-6 3 C 18" CK SA 0/C O/C CVT CS Note 5 f I V131 D-6 3 C 18" CK SA 0/C O/C CVT CS Note 5 G-5 20" BTF M O O NA Notes 1, 3 V132 3 B 20" BTF M O O NA Notes 1, 3 V135 E-5 3 B 20" BTF O O NA Notes 1, 3 V138 D-5 3 B M 20" BTF M O O NA Notes'1, 3 V141 C-5 3 B

          "'                                                                                                      po. . ,
  "N";'ij' g        -                                    INSERVICE TESTING PROGRAM ro. e,                                              ISI CLASS 1,2 & 3 VALVES                                   Production Engineering "s's.-                                      CALLAWAY NUCLEAR PLANT SYST EM                                                                                  P & ID  REVISION - DATE     PAGE COMPONENT COOLING WATER SYSTEM                                         M-02EG01      0         5/81   77 of 137 VALVE NUMBER                  y                        p      g              g             4   4       U              REM \RKS
                                                                                                             /

3" GA O O NA Note 3 V146 G-7 3 B 14 GL M C C NA Note 3 V147 G-7 3 B 2" V143 C-7 3 B 3" GA M O O NA Note 3 [ 2" GL M C C NA Note 3 V150 C-7 3 B , C NA Notes 1, 3 V158 D-7 3 B 2" GL M C 2" RV SA C O RVT Note 2 V159 G-6 3 C C NA Notes 1, 3 . V169 D-7 3 B 2" GL M C O RVT Note 2,. V170 C-6 3 C 2" RV  ; SA C l I

   "M";'{'"

g INSERVICE TESTING PROGRAM romu ro . . , ISI CLASS 1,2 & 3 VALVES Prod uction

             '                                                                                                                                                   Enginening "4"ii. -                                                                          CALLAWAY NUCLEAR PLANT SVSTEM                                                                                                                             P & ID REVISION - DATE      PAGE COMPOt'ENT COOLING WATER SYSTEM                                                                                   M-02EG01     0         5/81    78 of 137
                                /
                                                                                                                                     /,6

\ -

                               //                      y// hey /                                 ,

NA s y Notes 1, 3 V182 F-7 3 B 3" GA M O O 3" GA M O O NA Notes 1, 3 Vl85 C-7 3 B 1" RV SA C O RVT Note 2 < V305 G-6 3 C . C 1" RV SA C O RVT Note 2 V306 C-6 3 ' f 3 B 1" . L MO C O BT OP Note 6 ilV 11 F-8 PIT RR B 1" GL MO C O BT OP Note 6 HV 12 C-8 3 PIT RR 1" GL MO C O BT OP Note 6 HV 13 F-7 3 B P I "' RR 1" GL MO C O BT OP Note 6 IIV 14 C-7 3 B PIT RR l

Y ,i ,: i . g 7 n 3 ni 1 S o re K i e t f R c n A ui g E o M 6 6 ed n G E A 9 R oE r P 7 5 5 oP . r 3 3 s s 1 e e e e E8 t t t t T/ o o o o A N N N N D. 5 N O I S V0 I E R 4 1 D 0 4 I G

                     &E P2                                              PPR    PPR 0          SR       SR M                                 CR       CR                       OOR    OOR T            -

A N M / R A GS L TT TT A N A N TTT TTT BSI OEP V BI P BI P B S I. FP FP RLR g PAV A C

                                           /

C C C C C G3 E L og

                                   /

O O N& C I T2 U , S1 ES N g O O C C O O T ASY g E LA O O O O O O CICW M M A A A A I S VI LA M p R L E T F F L L E A S T B T B L G L G G G S C Y S N p I R " " " " E " " 3 3 2 2 T 8 8 A 1 1 p( W G N g I B B B B B B L O O C 3 3 3 3 3 3 T N E N O 6 7 7 6 6 P 6 M - - G C G C O D D C R E B 0

 '               .           M       5        6
  '              e                                                       9     1
 "                           U       1        1          1      2
           . ' " i, N
 'E N' ,."s           M      E        V       V          V      V        V     V E       V       H        H         L      L        R     R T       L M"U                 S       A Y       V S
    "E"$'.?"'                              INSERVICE TESTING PROGRAM                                                                                                                           ro . . ,

U$', ,, ISI CLASS 1,2 & 3 VALVES Production Enginening "4"'i. CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION - DATE PAGE COMPONENT COOLING WATER SYSTEM M-02EG02 0 5/81 80 of 137 l y / l 4 17 g i

/) y -

V0lS G-7 3 B 20" BTF M O O NA Notes 1, 3 V035 G-6 3 B 20" BTF M O O NA Notes 1, 3 V036 G-5 3 C 18" CK SA O O NA Note 3 i r V038 F-4 3 B 3" GA M O O NA Notes 1, 3 V039 E-4 3 B 2 GA M O O NA Notes 1, 3 V040 F-4 3 B 2" GA M O O NA Notes 1, 3 V042 E-4 3 B 1" GA M O O NA Notes 1, 3 V043 F-2 3 B 3" GA M O O NA Notes.1, 3

                           'M"'s'8"'                                                           INSERVICE TESTING PROGRAM                                rower U$ E.,                                                                  ISI CLASS 1,2 & 3 VALVES                            Prod uction Engineering "sy",'i . ,o                                                     CALLAWAY NUCLEAR PLANT SYST EM                                                                                                            P&10 REVISION DATE     PAGE M-02EG02   0       5/81    81 of 137 COMPONENT COOLING WATER SYSTEM VALVE NUMBER                                  V T

g s REMARKS V044 C-7 3 B 20" BTF M O O NA Notes 1, 3 V060 C-6 3 B 20" BTF M O O NA Notes 1, 3 - V061 F-5 3 C 18" CK M O O NA Note 3 7 V063 C-4 3 B 3" GA M O O NA Notes 1, 3 i V064 B-4 3 B 2" GA M O O NA Notes 1, 3 l V065 B-4 3 B 2" GA M O O NA Notes 1, 3

                             'V067          A-4                     3 D     1"                    GA    M     O        O    NA                    Notes 1,    3 V068           C-2                    3  B     3"                   GA    M     O        O    NA                    Notes 1, 3

SL"'a'.t"' INSERVICE TESTING PROGRAM rower U l,'$ ,,, ISI CLASS 1,2 & 3 VALVES Prod uction Enginuring

        'Yy",'i. ,o                            CALLAWAY NUCLEAR PLANT SYST EM                                                                           P & ID        REVISION - DATE      PAGE COMPONENT COOLING WATER SYSTEM                               M-02EG02            0        5/81      82 of 137
                                                                                                         /                         c VALVE NUMBER                      v 0     y      p     g4             go                      4                      REMARKS i

V200 11 - 4 3 B 12" BTF M O O NA Notes 1, 3 i V201 D-4 3 B 12" BTF M O O NA Notes 1, 3 5 IIV 53 G-5 3 B 18" BTF MO O O NA Note 3  ! j f HV 54 F-5 3 B 18" BTF MO O O NA tiote 3 , IIV 101 G-4 3 B 18" BTF MO C O BT CS Note 6 PIT RR IIV 1 0 2 C-4 3 B 18" BTF MO C O BT CS Note 6 PIT RR TV 29 G-6 3 B 20" BTF. AO O C BT OP FST OP TV 30 C-6 3 B 20" BTF AO O C BT OP

  • i FST OP
w= : = . , . .- . - . . . . - - . . . . . , - . . .-. .. .-- . .- - - . . -

m t 8' ro . . , C'a'8"' INSERVICE TESTING PROGRAM Prod uction Uf !',,, ISI CLASS 1,2 & 3 VALVES Engineering "s",'i. CALLAWAY NUCLEAR PLANT P & ID REVISION . DATE PAGE SYSTEM M-02EG03 O 5/81 B3 of 137 COMPONENT COOLING WATER SYSTEM v 0 g g gg go 4 REMARKS VALVE NUMBER y V071 G-7 3 B 6" GA M O O NA Note 3 V085 F-5 3 B 4" GA M O O NA Note 3 l

i V087 E-5 3 B 3" GA M G O NA Note 3 {i c

NA Note 3 i V088 11 - 5 3 B 12" GA M O O B 12" GA M O O NA Note 3 V092 11 - 4 3 4" GA M O O NA Note 3 V093 D-3 3 B 4" GA M O O NA Note 3 V094 C-3 3 B 6" GA O O 7' A Note 3 V095 D-2 3 B M

                                                    ,, i t.   ?                        .

g 7 ni n 3 S o e r 1 K i t e R c n f A ui g E o M

      ,d             G           E n     A4          R 0,    oE r        P 8 3

oP 3 3 3 3 3 p 3 3 e e e e 1 t t t t E8 o o T/ o o A N N N D 5 N N O I S I V O E R 4 3 D 0 I G

                      &E P2 0

M T M A N R A GS L

   'O VE P A

N A N A N A N . . . _ RLR I _ PAV A . O O O O . . . G3 E L [ N& C I T2,U [ O . . . . S1 ES N O O O _ T ASY d E LA M M . M M I CICW S M M M VI LA R E S L A M E T S A G T G A G A G . . . . N C Y I S d' R " " . . . . E " " 4 . . 1 . 4 1 4 T A W v G B B . . . . N B B I L _ O - O , C 3 3 3 3 3 3 3 T N E _ N 3 3 3 3 3 3 3 3 O - P - - E E . . . A M C D O R C E B

    '                              M
     "         rA e"

U N 9 0 1 3 .

    '.                                       6      7                                             0 0
    ' i , o "4
      'j       w M        E V

9 9 0 9 0 0 1 1 1 1 v E" g

         ;P               E T        L          0 V        V      V         V           V S         A         V
    "                     Y         V S

I II jllq

             ,i   f     I) g na ! ! hf:

W ' Il g 7 n 3 ni 1 S o r K ie R t e f A c n E o M

     ,uig           G               E n       A 5             R
e. odrE P 8

oP 3 3 3 3 3 P 3 3 3 - e e e e e e e 1 e t t t t t t t t o o E 8 T / o o o o o o N A 5 N N N N N N D N . N O I S IV0 E C

                                      *      /

u 3 D 0 I G g

                      &E-P 2 0

M T - A M N h R A

                                                                                                      *.             A          A         A GS L                                                    A         A          A              A N      N              N          N         N OEP    V                          h N         N          N RLR                                $

PAV A O O O O O 0 O G3 E L O N& C I T2,U f O S1 N O O O O O O 0, ES T ASY x / E LA $ M M M CICW M M M M M VISA I M R L E $ L T A A A A A E A S A A G A G G G G G G S Y G N C S I R $ " " " " " " E " " 4 6 4 1 4 4 T 4 4 A W S G 2 N - B B B B B B I D B L O O 0 C 3 3 3 3 3 3 T 3 3 N E , N 9 O 3 3 2 3 - 3 3 3 P 3 M - G F G G G B B O H C "

      "      ,s 5

i.'

                                         ~                    6         8          9              0       l             2 1

4 1 l M ' 0 0 0 1 l

    $'jo"s  r              E T

S

                                         "#                   1 V

1 V 1 V 1 V i V 1 V 1 V l u Y S 1 \(Il l flf l llll l' 1

  "' "$'.',' " '                                                                                                                                                             rower 4                                      INSERVICE TESTING PROGRAM ISI CLASS 1,2 & 3 VALVES                                                                                                    Production U }'$ ,,,

Engineering "4",'i . m CALLAWAY NUCLEAR PLANT P & ID isEVISION - DATE PAGE SYST E M COMPONENT COOLING WATER SYSTEM M-02EG03 O 5/81 86 of l37 o 4 4 REMARKS VALVE NUMBER 4 4 g4 t i B 6" GA M O O NA Note 3 V116 B-2 3 B 4" GA M O O NA Note 3 Vil7 B-3 3 a Note 3 'i B-3 3 B 1" GA M O O NA Vll8 , r. L, GA M O O NA Note 3  !; V123 D-4 3 B 4" 4" CK SA O O NA Note 3 V124 D-4 3 C 12" GA M O O NA Note 3 V125 A-5 3 B 12" GA M O O NA Note 3 V128 D-5 3 B 3 C 12" CK SA O O NA Note' P V129 D-5 1 l -

                                                                                                                                      .7 "M3'!,"'                                  INSERVICE TESTING PROGRAM                                             rower UN',,,                                         ISI CLASS 1,2 & 3 VALVES                                        Production Engineering "s',",'i .                             CALLAWAY NUCLEAR PLANT P & tD    FIE VISION - D AT E      PAGE SYSTEM M-02EG03        I          Y81       87 of 137 COMPONENT COOLING WATER SYSTEM
                            / / g//hygs//y 12"     CK     SA     O       C AT CVT RR CS                          Note 5,10 V204             11 - 4 2     C G-6          B     6"      GA     M     O        O    NA                                Note 3                    -

V309 3 O Note 3 i' 3" GA M O O NA , V331 G-3 3 B . r B 3" GA M O O NA Note 3 V332 P-3 3 3" GA M O O NA Note 3 V333 D-3 3 B i 3" GA M O O NA Note 3 V334 C-3 3 B i GA M O O NA Note 3 V370 A-4 3 B 4" AT RR O C BT OP 30 Notes.6, 10 llV 58 H-5 2 A 12" GA MO .. PIT RR

S xdridized po. , Ng;'y, INSERVICE TESTING PROGRAM Prod uction ISI CLASS 1,2 & 3 VALVES rgwer, Engineering sr. - CALLAWAY NUCLEAR PLANT P & lO REVISICN - D ATE PAGE SYST EM COMPONENT COOLING WATER SYSTEM M-02EG03 1 9/81 88 of 137

               ,   /t          y / Q ,4 g g s
                                                                            ;           AT           RR
                                                                                                         /)               y               -

C BT Op 30 Notes 6, 10 llV 59 C-5 2 A 12" GA MO O PIT RR AT , RR C BT OP 30 Notes 6, 10 HV 60 B-5 2 B 12" GA MO O PIT  !!R , AT RR .I C BT CS 30 Notes 6, 10 t. - HV 61 C-4 2 A 4" GA MO O PIT RR 4 . AT RR Notes 6, 10 GA MO O C BT OP 30 HV 62 E-4 2 B 4" RR PIT BT CS ' B 14" BTF AO O/C C FST CS Note 5

HV 69A F-8 3 PIT RR f

BT CS O/C C FST CS Note 5 HV 69B F-6 3 B 14" BTF AO PIT RR BT CS ' C FST CS Note 5 HV 70A F-8 3 B 14" BTF AO O/C

                           '                                                           PIT            RR BT           CS O/C        C    FST           CS                          Note 5+

IIV 70B F-6 3 B 14" BTF AO PIT RR

ro . . , i.'l.t'/,""' INSERVICE TESTING PROGRAM P oduction

              """,,,,                                                                        ISI CLASS 1,2 & 3 VALVES En gin niin g "i,",', , ,,,                                                          CALLAWAY NUCLEAR PLANT P & 10     REVISION - DATE       PAGE SYSTEM COMPONENT COOLING WATER SYSTEM                                                            M-02EG03        1          9/81    89 of 137 4     4                        REMARKS VALVE NUMBER 4     4      g4 AT  RR 12"         GA     MO     O        C    BT   OP        30              Notes 6, 10 IIV 71              H-5   3      B PIT  RR l                                                                                                                   N.ite 3 HV 126              G-5   3      B                              12"        GA     MO     C       C     NA                                                     :

h 12" GA MO C C AT RR Notes 9, 10 { HV 127 G-5 2 A k. 5 A 12" GA MO C C AT RR Note 9,10  ;. HV 130 D-5 2 t 12" GA MO C C AT RR Notes 9, 10 HV 131 C-5 2 A , C AT RR Note 9,10 HV 132 B-4 2 A 4" GA MO C 4" GA MO C C AT RR Notes 9, 10 HV 133 C5 ,2 , A

r 8

       %$'.','"'                             INSERVICE TESTING PROGRAM                                             re.. ,
        '$', , ,                                      ISI CLASS 1,2 & 3 VALVES                                       Production      ,

Engineering f "sO. ,,, CALLAWAY NUCLEAR PLANT SYST EM P & q0 REVISION - DATE PAGE RESIDUAL HEAT REMOVAL SYSTEM M ^2EJ01 O 5/81 90 of 137

                          //         y//Aggs                 /                  i i
                                                                                          // q  '

8708 A F-7 2 C 3" RV SA C O/C RVT Note 2 l i l l 8708 B C-7 2 C 3" RV SA C O/C RVT Note 2 i - b * }l 8724 A G-5 2 B 10" GA M O O NA Notes 1, 3  : l - 1

8724 3 C-5 2 B 10" GA M O O NA Notes 1, 3 '

i 8730 A G-4 2 C 10" CK SA C O CVT OP 4 8730 B C-4 2 C 10" CK SA C O CVT OP i 3841 A E-2 1 C 6" CK SA C C/O AT CS Notes 5, 7 4 CVT CS l  : .- 8841 B D-2 1. C 6" CK SA C C/O AT CS Notes 5, 7 CvT CS l

  'Nj'["'

ro., INSERVICE TESTING PROGRAM ISI CLASS 1,2 & 3 VALVES pm, Production Engineering "s'r".'i . - CALLAWAY NUCLEAR PLANT

  aTEM                                                                                   P & ID REVISION - DATE     PAGE 4                     RESIDUAL HEAT REMOVAL SYSTEM                                      M-02EJ01     0        5/81     91 of 137
                             //                 g /,/4 4 9 ,/;)

CK

                                                             /

SA C O/C CVT CS q Note 5 8958 A F-6 2 C 14" 8958 B B-6 2 C 14" CK SA C O/C CVT CS Note 5 >< i 8969 A G-3 2 C 8" CK SA C O CVT OP p 8969 B A-4 2 C 8" CK SA C O CVT OP f I C V033 H-5 3 B 18" BTF M O O NA Note 3 B 18" BTF M O O NA Note 3 V038 D-5 3 ( 1" GL M O O NA Notes 1, 3 - V070 G-5 3 B 1" GL M O O NA Notes,,L, 3 V071 D-5 3 B

                                                             'NIEf"'                                          INSERVICE TESTING PROGRAM                                                                                 r,.e,
                                                               "$',', , ,                                                              ISI CLASS 1,2 & 3 VALVES                                                          Predrcti:a Engineering "s,",'i . .                                   CALLAWAY NUCLEAR PLANT SYSTFM                                                                                                                         P & lD       REVISION - D AT E    PAGE RESIDUAL llEAT REMOVAL SYSTEM                                                                         M-02EJ01           0         5/81    92 of 137 p                       p           g4      O                  e             4       4                       REMARKS VALVE NUMBER                         y I

HV 14 11 - 5 2 B 1" GL SO C C NA Note 3 HV 15 A-5 2 B 1" GL SO C C NA Note 3 - 12" GA MO C O/C BT CS 120 No'.es 5, 6 HV 8701A F-8 1 B PIT RR . l 12" GA MO C O/C BT CS 120 Notes 5, 6 ilV 8701B B-8 1 B

  • PIT RR B 10" GA MO O O/C BT CS Note 6 HV 8716A E-4 2 PIT RR D-4 2 10" GA MO O O/C BT CS , Note 6 HV 8716B B PIT RR l
  • G-4 B 8" GA MO C O BT OP Note 6 HV 8804A 2 PIT RR HV 8804B A-4 2 B 8" GA MO C O BT OP Note.6u PIT RR t

i

     'N"'#8"'                                  INSERVICE TESTING PROGRAM                                                            ras,
       $',,,                                                  ISI CLASS 1,2 & 3 VALVES                                               Predrcti:n Engineering "s,",'i .                               CALLAWAY NUCLEAR PLANT SYSTEM                                                                                            P & ID     REVISION - DATE      PAGE RESIDUAL llEAT REMOVAL SYSTEM                                                 M-02EJ01         0          5/81   93 of 137 I                                /

VAL.VE NUMBER v 4 4 g4 P 4 REMARKS

                                                                                            /

t ! IIV 8809A G-3 2 B 10" GA MO O O/C BT OP 13 Note 6 PIT RR IIV 8809B C-3 2 B 10" GA MO O O/C BT OP 13 Note 6 l PIT RR llV 8811A E-7 2 B 14" GA MO C O/C BT OP 18 Note 6 PIT RR llV 8811B D-7 2 B 14" GA MO C O/C BT OP 18 Note 6 PIT RR llV 8840 E-3 2 B 10" GA MO O O/C BT OP 13 Note 6 PIT RR FCV 610 H-6 2 B 2" GL MO O C BT CS Notes 5, 6 4 PIT RR FCV 611 A-5 2 B 2" GA MO O C BT CS Notes 5, 6 PIT RR

 ;  FCV 618            F-5      2     B     8"    BTF                   AO     C     C        NA                               Note 3.-

w YM'.'," INSERVICE TESTING PROGRAM re.n

        "$'. . ,                                        ISI CLASS 1,2 & 3 VALVES                                 Productiou Engineering "i,",'i . .                             CALLAWAY NUCLEAR PLANT SYSTEM                                                                         P & ID   RE VISION . DATE f PAGE RESIDUAL llEAT REMOVAL SYSTEM                              M-02EJ01      0         5/81       94 of 137 cp    p      p     p4        0    g          4   4        U                REMARKS VALVE NUMBER 4

FCV 619 B-5 2 B 8" BTF AO C C NA Note 3 1 HCV 606 G-4 2 B 10" BTF AO O O NA Note 3 I 6 IICV 607 C-4 2 B 10" BTF AO O O NA Note 3 , HCV 8825 E-2 2 B 3/4" GL AO C C NA Note 3 .. IICV 8890A T-2 2 B 3/4" GL AO C C NA Note 3 1 IICV 8890B C-2 2 B 3/4" GL AO C C NA Note 3 e t Orn

    'N 'il'.?"'                              INSERVICE TESTING PROGRAM                                                 re..,
      $'. . ,                                         ISI CLASS 1,2 & 3 VALVES                                           Pred::ctisa Enginnsing "s ,",'i . .                            CALLAWAY NUCLEAR PLANT SYSTEM                                                                                    P & lb  H EVISION - D4."8    PAGE IIIGil PRESSURE COOLANT INJECTION SYS'1EM                               M-02EM01        0        5/81    95 of 137 i

VALVE NUMBER g 4 4 4 4 go 4 4 9EMARKS

                                      /                             /

8921 A E-5 2 B 4" GA M O O NA Notes 1, 3 i 8921 B D-5 2 B 4" GA M O O NA Notes 1, 3 8922 A E-5 2 C 4" CK SA C O CVT RR VRR-4 Note 5 8922 B D-5 2 C 4" CK SA C O CVT RR VRR-4 Note 5 1 8926 A E-7 2 C 8" CK SA C O CVT OP 8926 B D-7 2 C 8" CK SA C O CVT OP I AT 1 CS ' V001 P-3 1 C 2" CK SA C O/C CVT RR VRR-5 Notes 5, 7 l AT CS 2" CK SA C O/C CVT RR VRR-5 Notes 95, 7 I V002 E-3 1 C

7

 'IC'#8"'                                                                                        INSERVICE TESTING PROGRAM                                       ro. . ,

Uf.., ISI CLASS 1,2 & 3 VALVES Producti::n f Enginee ring "4",'i . . CALLAWAY NUCLEAR PLANT P & ID DEVISION - DATE PAGE SYSTEM HIGH PRESSURE COOLANT INJECTION SYSTEM M-02EM01 O 5/81 96 of 137

                                                                                        ,, g                            (( gg p         y4                        4  4                      REMARKS VALVE NUM8ER AT    CS CK     SA        C     O/C CVT   RC         VRR-5       Notes 5, 7 V003                  D-3    1                                                     C     2" AT    CS CVT   RR         VRR-5       Notes 5, 7               -

V004 C-3 1 C 2" CK SA C O/C I. C 1" CK SA C O CVT OP , V005 A-6 2 D CK SA C C AT RR Notes 9, 10 . V006 F-6 2 h,C 1" 2 C 1" CK SA C O CVT OP V007 A-5 O NA Notes 1, 3 V089 F-3 2 B 2" AGL M O O NA Notes 1, 3 . V090 E-3 2 B 2" AGL M O O O NA Notes,J, 3 V091 D-3 2 B 2" AGL M

     'M!'ii'."'                                 INSERVICE TESTING PROGRAM                                                                   r,w e, Ugi.,,                                                ISI CLASS 1,2 & 3 VALVES                                                            Prod uction Engineering "4".'i, o                                     CALLAWAY NUCLEAR PLANT SYSTEM                                                                                     P & ID                         REVISION DATE       PAGE IIIGil PRESSURE COOLANT INJECTION SYSTEM                                 M-02EM01                              0       5/81     97 of 137 VALVE NUMBER                 J         &     f         f       54           e- &    g        4                          4                     REMARK 4 V092            D-3      2      B       2"        AGL    M         O    O      NA                                                 Notes 1, 3 2"        AGL    M         O    O      NA                                                 Notes 1,     3 V095            C-2      2      B                                                                                                                            <

i AGL M O O NA Notes 1, 3  ;, V096 C-2 2 B 2" 1 i, 2 B 2" AGL M O O NA Notes 1, 3 VC97 B-2 2 B 2" AGL M O O NA Notes 1, 3 V098 B-2 2" GL M O O NA Notes 1, 3 V099 F-6 3 B

                                              ?"         GL              O    O       NA                                                Notes 1, 3 V103             D-6      3     B                        M 4"        GA     MO       C   O/C      BT   OP                             10            Notes $, 6 IIV 8802A           E-4      2      B PIT   RR
                                                                   "4j;'i["'                                                       INSERVICE TESTING PROGRAM                                                                                                         p ,.,

ISI CLASS 1,2 & 3 VALVES Production ran Engineering "Ca- CALLAWAY NUCLEAR PLANT P & ID PAGE SYSTEM l REVISION-DATE HIGH PRESSURE COOLANT INJECTION SYSTEM M-02EM01 l 0 5/81 98 of 137 REMARKS V ALVE NUMBER 4T 4 Y c 4d 4 BT OP 10 Notes 5, 6 HV 8802B D-4 2 B 4" GA MO C O/C PIT RR 6" GA MO C O BT OP Note 6 HV 8807A G-7 2 B + PIT RR 6" GA MO C O BT OP Note 6 HV 8807B F-7 2 B - PIT RR GL MO O C BT OP Note 6 HV 8814A D-6 2 B 1" PIT RR , GL MO O C BT OP Note 6 HV 8814B B-5 2 B 1" PIT RR GA MO O C BT OP Note 6 HV 8821A E-4 2 B 4" RR PIT C .BT OP Note 6 s llV 8821B D-4 2 8 4" GA MO O PIT RR C C NA Note'B-HV 8823 C-4 2 B 3/4" GL AO

   'Ndi'."'                                INSERVICE TESTING PROGRAM                                                                              re.u U l,'f ,,,                                                                    ISI CLASS 1,2 & 3 VALVES                                          Production Engineering "s ,".'i . .                                  CALLAWAY NUCLEAR PLANT SYSTEM                                                                                                                 P & ID   REVISION - DATE       PAGE HIGH PRESSURE COOLANT INJECTION SYSTEM                                                          M-02EM01           O        5/81         99 of 137 VALVE NUMBER                     v 0      p                                    p      g4            go                   4   4                         REMARK 5 HV 8824            D-3    2     B      3/4"                       GL                AO     C       C       NA                               Note 3 HV 8835            B-4    2     B        4"                        GA               MO     O      O/C      BT    OP                         Note 6 r>IT  RR HV 8871            G-5    2     A      3/4"                        GL               AO     C       C       AT    RR                          Notes 9, 11           ,

IfV 8881 G-4 2 B 3/4" GL AO C C NA Note 3 A 1" GL AO C C AT RR Notes 9, 10 HV 8888 F-6 2 l HV 8889A G-2 1 B 3/4" GL AO C C NA Note 3 i l HV 8889B G-3 1 B 3/4" GL AO C C NA Note 3 - i NA Note 3..;. ilV 8889C G-2 1 B 3/4" GL AO C C l r

                "N 'd'.f"'                                                                     INSERVICE TESTING PROGRAM                                       em,
                  "$',,,                                                                               ISI CLASS 1,2 & 3 VALVES                                  Production Engineering "i,".'i .                                                                    CALLAWAY NUCLEAR PLANT P&10 REVISION - D ATE     PAGE 5YSTEM IIIGil PRESSURE COOLANT INJECTION SYSTEM                                        M-02EM01   0       5/81       100 of 137 I

VALVE NUMBER O g ,g gg O go 4 REMARKS ! l IIV 8889D G-2 1 B 3/4" GL AO C C NA Note 3 i E-7 6" GA MO O O NA Note 3 llV 8923A 2 B D-7 6" GA MO O O NA Note 3 , HV 8923B 2 B

7 r.

6" GA MO O O NA Note 3 $ 11V 8924 G-8 2 B l AT RR Notes 9, 11 l HV 8964 G-6 2 A 3/4" GL AO C C j i e l . A

'E 'd'."'                                INSERVICE TESTING PROGRAM                                                         ro.. ,
  "$,'. . ,                                                      ISI CLASS 1,2 & 3 VALVES                                     Producti:n Engineering "s",'i . .                                        CALLAWAY NUCLEAR PLANT SYSTEM                                                                                              P & lD  REVISION - D ATE     PAGE IIIGli PRESSURE COOLANT INJECTION SYSTEM                                        M-02EM02      0         5/81     101 of 137 p                    p                                     4                          REMARKS VALVE NUMBER                       g (p                                   4          q.                   4 8815            D-3     1    C      3"                   CK     SA       C    O/C    CVT     CS                     Note 5                   ;,

V014 E-6 2 C 1" CK SA O C CVT OP , l

                                                                                                                                                     ~

V015 E-6 2 B 1" GL M O O NA Note 3 4 9 r: V017 D-6 2 C 1" CK SA O C CVT OP ' 1" GL O O NA Note 3 V018 D-6 2 B M 1" GL M C C NA Notes 1, 3 V019 D-6 3 B AGL O NA Notes 1, 3 - V107 E-3 1 B 1" M O 1" AGL M O O NA Notes,,1, 3  : V108 G-3 1 B

                                                                                           .g.

I

    's " 'a'.','"'                                            INSERVICE TESTING PROGRAM                                                      Pa.,

ISI CLASS 1,2 & 3 VALVES Productisn

         /

UU.., Engineering "i,".'i . . CALLAWAY NUCLEAR PLANT SYST EM P & ID REVISIO% DATE PAGE IIIGH PRESSURE COOLANT INJECTION SYSTEM M-02EM02 1 9/81 102 of 137 103 L'T.

                                                 //       y//n ggi /) y                                                                         -

t VlO9 F-3 1 B 1" AGL M O O NA Notes 1, 3 V110 D-3 1 B 1" AGL M O O 1;A Notes 1, 3 1 V151 B-5 2 B 1" GL M C C NA Notes 1, 3 i i V240 C-7 2 C 1" CK SA C O CVT CS Note 5 [ s V241 B-7 2 C 1" CK SA C O CVT CS Note 5 A-6 2 B 1" GL M C C NA Notes 1, 3 V246 GL M C C NA Notes 1, 3 V247 A-7 2 B 1" 4" GA MO C O/C BT CS 10 Note $6, 6 IIV 8801A D-4 2 B PIT RR

7 INSERVICE TESTING PROGRAM roer "M"N'.i'" Production ugio,, ISI CLASS 1,2 & 3 VALVES Engineering "s,".'i . CALLAWAY NUCLEAR PLANT P & ID REVISION - DATE PAGE M-02EM02 1 S'81 103 of 137 llIGli PRESSURE COOLANT INJECTION SYSTEM 4 REMARKS VALVE NUMBER 8 p p f4 4" GA MO C O/C BT CS 10 Note 5, 6 liv 8801B D-4 2 B PIT RR BT CS Notes 5, 6 HV 8803A C-7 2 B 4" GA MO C O/C . j ' PIT RR Y-C BT CS Notes 5, 6 HV 8803B A-7 2 B 4" GA MO O/C PIT RR BT CS C O/C FST CS Note 5 IIV 8837 A C-7 2 B 1" GL SO I PIT MR BT CS C O/C FST CS Note 5 HV 8837B B-7 2 B 1" GL SO

                                                                                 '                                                                       PIT      RR C           C              NA                                              Note 3 HV 8843                                                         C-4     2  B   3/4"           GL           AO BT      3p C              FST     Op                                      Note 5                    ,

IIV 8870A E-5 2 B 1" GL AO O PIT RR BT OP AO C FST Note 5 HV 8870B E-5 2 B 1" GL O OP " ' ' PIT RR

w. '
                                               , S. t, i

7 3 g 1 ni n o re f o i e t c n ui g E G 4

     .d n       A 0
     . roE      P1 oP                                                             e r                       3 1        e E8          t o

n T/ A D5 N N O I S IVO E R 2 J M T D0 I

                &E P2 M

0

                        /           PPR OOR A                 M N

R A s TT GS L OEP RLR PAV A G3 E V g A N C TSI BFP C N& C I T2,U S1 L N y C O ES M TSY E LA CICW A E T S Y S b O A O A I VI LA a E S S L A N O I T C

                        /    L G

L G N I C E J N I / "4 4 y / / T 3 3 N A L O B O B C E R U S

                         /    2            2 S

E R P l i G

                        /     3 C

6 D I l i

  '           .               2             3
  ' ,     ,' i,               8             8
            "                 8             8
  '.,,"i, d'             M           8             8
  '! U"p          E T

M S V V Y S I I H

                                         )                   l    ;

l

INSERVICE TESTING PROGRAM Po . . ,

   "R"$'.f"'
u;l,',,, ISI CLASS 1,2 & 3 VALVES Production Engineering "s,"l . CALLAWAY NUCLEAR PLANT SYSTEM P & ID HEVISION - DATE PAGE CONTAINMENT SPRAY SYSTEM M-02EN01 0 5/81 105 of 137 O

VALVE NUMBER v 0 4 4 Y 4 gO 4 4 REMARKS G-7 C 12" CK SA C O NA VRR-7 Note 4 V002 2 G-7 C 12" CK SA C O/C CVP OP VRR-8 V003 2 t 10" CK SA C O CVP OP VRR-8 i V004 G-5 2 C . 3" GA M O O '

                                                                           ' NA                          Notes 1, 3 V005        F-6     2     B 1

B-7 2 C 12" CK SA C O NA VRR-7 Note 4 l V008 i 2 C 12" CK SA C O/C CVP OF VRR-8

!    V009         B-7 2    C       10"    CK      SA      C      O        CVP   OP         VRR-8 V010        B-5 1

O NA Notes 1, 3 V011 B-6 2 B 3" GA M O ]

YI/.','"' pc.. , INSERVICE TESTING PROGRAM Production U/ O.., ISI CLASS 1,2 & 3 VALVES Engineering "i,",'i m CALLAWAY NUCLEAR PLANT ' P 410 REVISION DATE PAGE SYSTEM CONTAIt! MENT SPRAY SYSTEM M-02EN01 0 5/81 106 of 137 4 REMARKS VALVE NUMBER y (P p f4 t CVP NA VRR-9 Notes 4, 8 V013 G-4 2 C 10" CK SA C O/C O NA Notes 1, 3 [ V014 G-3 2 B 10" GA M O g CVP NA VRR-9 Notes 4, 8 V017 B-4 2 C 10" CK SA C O/C i O O NA Notes 1, 3 V018 B-3 2 B 10" GA M C NA Notes 1, 3 4" GA M C V024 F-4 2 B C NA Notes 1, 3 C-4 2 B 4" GA M C V025 4 1 C NA Notes 1, 3 2 B 3/4" GL M C ] V026 F-4 1 - SA C C NA V057 F-5 2 C 3/4" RV

7 S N!'d'8"' INSERVICE TESTING PROGRAM ro.e, US',, ISI CLASS 1,2 & 3 VALVES Production Engineering "s,",'i . CALLAWAY NUCLEAR PLANT SYSTEM P & ID REVISION - DATM PAGE CONTAINMENT SPRAY SYSTEM M-02EN01 0 5/81 107 of 137 T4 40 0 4 4 R EM ARKS VALVE NUMBER 4 4 2 C 1" RV SA C O RVT Note 2 V058 F-5 O O NA Notes 1, 3 . V097 D-S 2 B 3" GA M l t V098 F-6 2 B 3" GA M O O NA Notes 1, 3 [ 3 2 C 3" CK SA C O CVT OP V099 F-6 4-O O NA Notes 1, 3 V100 C-6 2 C 3" GA M 2 C 3" CK SA C O CVT OP V101 C-6 1" RV SA C O RVT Note 2 ,, V106 F-5 2 C C C/O BT OP No tesp, 6 , 8 HV 1 G-7 2 B 12" GA MO PIT RR

T

    'Ny j'.','"'                           INSERVICE TESTING PROGRAM                                             P,, , ,

ISI CLASS 1,2 & 3 VALVES Productisa n.., Engineering "s A'i. - CALLAWAY NUCLEAR PLANT SYSTEM P a lO f1E VISION - D AT E PAGE CONTAINMENT SPRAY SYSTEM M-02EN01 0 5/81 108 of 137 l --

                       //          g/ /h q q s /) q 15                Note 6 T

G-4 2 B 10" GA MO C O/C BT OP IIV 6 PIT RR BT OP Notes 6, 8 HV 7 B-7 2 B 12" GA MO C C/O PIT RR t. O/C BT OP 15 Note 6 r. HV 12 B-4 2 B 10" GA MO C l PIT RR B 3" GA MO C O BT CS Note 5 HV 15 E-6 2 ~ PIT RR I Note 5 3" GA MO C O BT CS HV 16 D-6 2 B PIT RR J l ew 1

  'NI'a'."'                                                               INSERVICE TESTING PROGRAM                                              rou UN'.. ,                                                                         ISI CLASS 1,2 & 3 VALVES                                         Productisn Engineering "s,",'i.                                                                CALLAWAY NUCLEAR PLANT SYSTEM                                                                                                                   P & ID  REVISION DATE       PAGE ACCUMULATOR SAFETY INJECTION SYSTEM                                                                          M-02EP01      0     5/81       109 of 137 0            4 VALVE NUMBER                                                        v y     p      p      g4                                     4                     REMARKS AT  CS                                            ,

G-3 1 C 6" CK SA C O/C CVT CS Notes 5, 7 8818 A AT CS 1 C 6" CK SA C O/C CVT CS Notes 5, 7 8818 B F-3 5 AT CS 6" CVT CS Notes 5, 7 8818 C D-3 1 C CK SA C O/C [ AT CS 6" CK SA C O/C CVT CF Notes 5, 7 8818 D C-3 1 C , i 1" RV SA C O RVT Note 2 8855 A H-7 2 C 2 C 1" RV SA C O RVT Note 2 8855 B F-7 1" RV SA C O RVT Note 2 8855 C D-7 2 C 1" RV SA C O RVT Note 8'2 8855 D C-7 2 C 1

q

      'N " 'a'." '                                                                                       INSERVICE TESTING PROGRAM                                                              em, U$',,,                                                                                                     ISI CLASS 1,2 & 3 VALVES                                                        Production Engineering

_=

           "sA'i. .                                                                                         CALLAWAY NUCLEAR PLANT P lb lD     FIE VISION - DAT E     PAGE SYST EM ACCUMULATOR SAFETY INJECTION SYSTEM                                                                                                     M-02EP01             0       5/81     110 of 137 p      p       p4             e                           4      4                        REMARKS VALVE NUMBER                                                                                   8 8956 A          G-4                                                                    1  C   10"     CK     SA      C         O   CVP               RR             VRR-6           Notes 5 E-4                                                                    1  C   10"     CK     SA      C         O   CVP               RR             VRR-6           Notes 5 8956 B S

8956 C C-4 1 C 10" CK SA C O CVP RR VRR-6 Notes 5 3 8956 D B-4 1 C 10" CK SA C O CVP RR VRR-6 Notes 5 GL C C NA Notes 1, 3 V001 G-7 2 B 2" M V002 G-7 2 B 3/4" GL M O O NA Note 3 B 1" GL M O O NA Note 3 V009 G-6 2 AT CS V010 G-3 1 C 2" CK SA C O/C CVT RR VRR-2 Note's 5, 7

  'M N'8"'                                            INSERVICE TESTING PROGRAM                                                                 ra ,
    "/l,'. . ,                                                      ISI CLASS 1,2 & 3 VALVES                                                     Production Engineering "s,".'i .                                         CALLAWAY NUCLEAR PLANT SYSTEM p a :D       REVISION - DATE                  PAGE ACCUMULATOR SAFETY INJECTION SYSTEM                                            M-02EP01           0                    5/81     111 of 137 VALVE NUMBER                                         p           p      g4             g              4     4           U                         REMARKS g

GL M C C NA Notes 1, 3 V0ll C-7 2 B 2" O NA Note 3 V012 C-7 2 B 3/4" GL M O l 1" GL M O O NA Note 3 V019 E-6 2 B AT CS [ SA C O/C CVT RR VRR- 2 Notes 5, 7 - V020 F-3 1 C 2" CK . C C NA Notes 1, 3 V021 C-7 2 B  ;* GL M O O NA Note 3 V022 D-7 2 B 3/4" GL M 1 GL M O O NA Note 3 . V029 D-6 2 B 1" ( AT CS CK SA C O/C CVT RR VRR-2 No te sp, ,.5 , 7 V030 D-3 1 C 2"

7 S R 'd'.',' "' INSERVICE TESTING PROGRAM r;.2, U$',, , , ISI CLASS 1,2 & 3 VALVES Produetiza Engineering "ly",' . . CALLAWAY NUCLEAR PLANT SYST EM

  • P & ID REVISION - DATE PAGE ACCUMULATOR SAFETY INJECTION SYSTEM M-02EP01 0 5/81 112 of 137
                                                                                                                                                         /

0 4 REMARKS VALVE NUMBER 9 p p p4 4

                                                                                                                                                                        /

2" GL M C C NA Notes 1, 3 V031 B-7 2 B V032 B-7 2 B 3/4" GL M O O NA Note 3 . a. I V039 B-6 2 B 1" GL M O O NA Note 3 , 7 AT CS C 2" CK SA C O/C CVT RR VRR- 2 Notes 3, 7 V040 C-3 1 A,C 1" CK SA C C AT RR Notes 9, 11 V046 A-5 2 i 10" GA MO O O/C BT CS Notes 1, 5, 6 ilV 8808A G-5 2 B PIT RR 10" GA MO O O/C BT CS Notes 1, 5, 6 llV 8808B E-5 2 B PIT RR No te s 1, 5, 6

                                                                                                                                                                                                 ~

IIV 8808C C-5 2 B 10" GA MO O O/C BT CS PIT RR

SN "2'.i'"' INSERVICE TESTING PROGRAM ro. , UN',,, ISI CLASS 1,2 & 3 VALVES Production Engineering "i," 'i . . CALLAWAY NUCLEAR PLANT SYSTEM P & ID R E VISION - D AT E PAGE ACCUMULATOR SAFETY INJECTION SYSTEM M-02EP01 0 5/81 113 of 137 } VALVE NUMBER yv 4 4 [4 e 4 4 REMARKS IIV 8808D B-5 2 B 10" GA MO O O/C BT CS Notes 1, 5, 6 PIT RR IIV 8875A 11 - 6 2 B 1" GL AO C C NA Note 3

                                                                                                                                                                       ?

IIV 8875B F-6 2 B 1" GL AO C C NA Note 3 l:

                                                                                                                                                                        ~

ilV 8875C D-6 2 B 1" GL AO C C NA Note 3 . IIV 8875D C-6 2 B 1" GL AO C C NA Note 3 IIV 8877A F-4 2 B 3/4" GL AO C C NA Note 3 IIV 8877B E-4 2 B 3/4" GL AO C C NA Note 3 llV 8877C C-4 2 B 3/4" GL AO C C NA Note '*3'

rs.e,

        *E'J'.I'"'                            INSERVICE TESTING PROGRAM                                                                      Production U$',, , ,

ISI CLASS 1,2 & 3 VALVES Engineering "sl.'.. CALLAWAY NUCLEAR PLANT P & ID REVISION - DATE PAGE SYSTEM ACCUMULATOR SAFETY INJECTION SYSTEM M-02EP01 0 5/81 114 of 137 4 4 4 g4 q. O q.O 4 REMARKS vat.VE NUMBER J i C NA Note 3 ilV 8877D A-4 2 B 3/4" GL AO C 2 B 1" GL AO C C NA Note 3 ilV 8878A G-5  ! I Note 3  :: 1" GL AO C C NA l IIV 8878B E-5 2 B 1" GL AO C C NA Note 3 llV 8878C D-5 2 B , i B 1" GL AO C C NA Note 3 i HV 8878D B-5 2 i { NA Note 3 IIV 8879A G-4 2 B 3/4" GL AO C C i ' C NA Note 3

ilV 8879B E-4 2 B 3/4" GL AO C i

l C C NA Note '3-

  • liv 8879C D-4 2 B 3/4" GL AO

y

     'N " 'J'.',' " '                                     INSERVICE TESTING PROGRAM                                                re..,

UN',,, ISI CLASS 1,2 & 3 VALVES Producti::n Engineering "s,".'i . CALLAWAY NUCLEAR PLANT P & ID HEVISION DATE PAGE SYST EM I ACCUMULATOR SAFETY INJECTION SYSTEM M-02EP01 0 5/81 115 of 137 l VALVF AUMBER 4 4 g4 gp O 4 REMARKS

 ,  HV 8879D             C-2   2     B               3/4"     GL      AO    C        C           NA                          Note 3                 *:
                                                                                             ?

HV 8880 A-4 2 A 2" GL AO C C AT RR Notes 9, 11 ,' -

                                                                                                                                                 . T.

HV 8950A H-7 2 B 1" GL SO C O BT CS Note 5 ( t' PIT RR

                                                                                               ~

1 HV 8950B F-8 2 B 1" GL SO C O BT CS Note 5 PIT RR HV 8950C F-7 2 B 1" GL SO C O 3T CS Note 5 PIT RR D-8 1" GL SO C O BT CS Note 5 l HV 8950D 2 B PIT RR D-7 1" GL SO C O BT CS Note 5 . HV 8950E 2 B PIT RR 1" GL SO C O BT CS Notei,5 HV 8950F C-8 2 B PIT RR l

                                               ;ll ;

1' y '  ; > 7 g 3 n 1 ni S o r K iu t c n f o R A E M 3 3 3 ui g

  .d      n       G6         E R                                                                      ,
   . oE           A P 1 r

oP r 1 3 1 1 D s s s 1 e e . e e t t t t E 8 T / o o o o A N N N N D 5 N C O I S I V 0 E R 4 2 D C l 0 4

                    & F F 2 P                                  P    P 0            P                                               O    O M                                   O            O T            M A         N R          A                        T             T                                 T    T GS L                                V             V        A         A        A     V    V        A N        N     C    C        N OEP    V C             C        N RLR                           q PAV A                               O             O        C          C       O      O    O        O G3 E       L N& C I

T2,U S1 ES N g C C C C O C C O T ASY Y E LA A A A A A S M CICW E S S S M M S I VIS LA N 4 R L I D K A E R K K K A A K S A U C C C G G C C G N C T 4 I P M " U " " " " " " " 4 1 4 4 4 1 4 P O 4 R vy E T B C C B A C C C 8 W D E E F 3 3 3 2 2 3 2 2 Y R A I L 6 6 6 7 6 G 6 7 I - - X G G G G E G G D U R A E B

   '            .                 M
    "      ,'i, J

1 2 3 4 8 4 5 2 1 5

           ,",                    tN   0             0          0        0        0    2
           ,i M
           ,                                                                                           0
   *E"$l' "           E T

E V L 0 V 0 V 0 V 0 V 0 V 0 V 0 V V N" S A Y V S l 1l l

i i ? i' *: . S I, y,1' !

                                                                                                        . k
                                                                                       \                       1 7

g 3 ni n 1 S o er f K R i e t c n o A ui g E M 3 3 G 7 E

      .do n        A      1   R         ,            ,
      . rE         P 1           1            1 oP                                                                                    3 e

0, P 6 s s 1 e e e e E8 t t t t T/ o o o o A N N N N D 5 N O I S IV O E R 4 2 D0 4 I C

                    &F P2                                            PP              P 0                                       OO              O M          T           M A          N R          A                                                          T GS L                                A            A             TS BF T

B A N - OEP V N N _ RLR e PAV A O O C O C G3 E L N& C I - T2,U S1 ES N 4 O O O C C TSY A g EC LA O O O CI W I E M M A M A VISA L N p R L I B A L E A R A A G G L G G S U G N C T p I P _ M 1 1 1 4 1 _ U P

                              ?(

R E T B B B B A B W D E E F 3 3 3 3 3 Y R A I 5 6 L 7 6 7 I D D D F D X U R A E 0 2 B 0

   '             .              M                                   1               1
    "       ,' n,               U        2             3             3              3          1
            ."s
   '             ,              N        5             5
            .                   E                      0             V               V         V
   $'. l'   ,

M E V 0 V V F H L E" "f " T S Y L A v S l ,l ll: ii' li  ;  !

TN'.','"' INSERVICE TESTING PROGRAM pc.. ,

;                                                                    ogi, , , ,                                                             ISI CLASS 1,2 & 3 VALVES                                     Production Engineering "4",'i .

{ALLAW AY NUCLEAR PLANT P & ID REVISION - DATE PAGE j SYSTEM CONTAINMENT llYDROGEN CONTROL SYSTEM M-0?GS01 0 5/81 118 of 137

                                                                                                                                                                                /
                                                                                              ;S    a f j'
                                                                                                              /

j' f'll{ff

                                                                                                                                                                                 $ p *~    ll              "'"*""

AT RR E-6 2 A 1" GA SO C O/C h[,p Note 10 ilV 3 Oh PIT RR AT RR 2 A 1" GA SO C O/C T OP Mou 0 llV 4 E-6 PIT RR

                                                                                                                                                                                                                       ~;

AT RR 1" GA SO C O/C hg,p Note 10 r ilV 5 D-5 2 A Oh - PIT RR AT RR BT OP A 1" GA SO C O/C FST OP Note 10 HV 8 P-6 2 RR

                                                                                                                                                                                                                          +

PIT AT RR A 1" GA SO C O/C hg,p Note 10 llV 9 B-6 2 Oh PIT RR

                                                                                                                                        ~

AT RR 1" GA RO C O/C h[,p Note 10 llV 12 E-4 2 A Oh PIT RR AT RR A 1" GA SO C O/C h[,p Note 10 HV 13 E-5 2 Oh PIT RR ' AT RR A 1" GA SO C O/C Note 10 llV 14 D-5 2 f OP PIT RR l

r ro. . ,

    'N2','"'                                          INSERVICE TESTING PROGRAM                                                                  Production
       "/f..,                                                  ISI CLASS 1,2 & 3 VALVES Engineering "4".'i. .                                     CALLAWAY NUCLEAR PLANT PMiID           R EVISION - D AT E       PAGE S.6 TEM CONTAINMENT llYDROGEN CONTROL SYSTEM M-02GS01              l'         '9 /81     119 of 137 4                          REMARKS VALVE NUMBER                           T (k       I      I              I*    t     gt
                                                                                                                        /
                                  /

AT RR GA So C O/C OP Note 10 HV 17 B-4 2 A 1" p ' PIT RR AT RR C O/C BT OP Note 10 2 HV 18 B-5 2 A 1" GA SO FST OP

                                                                                                                                                                  ~

PIT RR d AT RR Notes 6, 10 j HV 20 F-5 2 A 6" BTF MO C O/C BT OP PIT RR ( h AT RR Notes 6, 10 A 6" BTF MO C O/C BT OP f HV 21 F-4 2 PIT RR AT RR C BT OP 5 Note 10 IIV 31 D-4 2 A 1" GA SO O FST OP Sec. PIT RR AT RR OP 5 Note 10 A 1" GA SO O C BT HV 32 D-3 2 FST OP Sec. PIT RR AT RR C 0 Note 10 C-4 2 A 1" GA SO O HV 33 PIT RR AT RR 5 Notei10 HV 34 C-4 2 A 1" GA SO O C y - PIT RR h

7 g 3 n 1 ni S o re K i e t f R c n o A ui g E M G 0 E

      .d      n A 2       R
      . oEr         P 1           0           0            0           0 oP                                                                  1 r                               1           1            1 1            e           e            e           e E    8           t           t             t          t T /               o           o            o           o A9               N           N             N          N D

N J O I SIV1 E R 4 l c c c c 1 5 e 5 e 5e 5 e S S S S 0 S 0 1

                    &G P 2 0        R        R RP P R     R            R RPPR R        R RO O R     R            R ROOR M.         T          M
   /          N R          A                          TT       TT            TT         TT GS L                           T[I        TT S I T A

I P TTSI ABFP OEP V AhP ABFP RLR og PAV A C C C C G3 E L 0 N& C I T2,U S1 ES N O O O O 4 T ASY M g E LA E T O O O O CICW I S S Y S S S S VI LA S 4 R L L A E O A A A S A R G G G G N C T N 4 I O C " " " N 1 1 1 1 E G 8 O R D A A A A Y l l T N 2 E 2 2 2 M N I A 6 6 T 6 7 - N - - - _ - O D D C C _ C R E _ B

   '             ,m             M

- ' 9

   "        ,'i                 U      6          7             8

- ,", N 3 3 3 3 a j'f , "4 i. M E V d "U E V L V V V L' T S A 1 1 H I I H

   '                   Y        V S

SA"da'.'/"' INSERVICE TESTING PROGRAM rower ISI CLASS 1,2 & 3 VALVES Production

   %,,                                                                                                                                          Enginening "4",'i .                                                    CALLAWAY NUCLEAR PLANT P & 10        REVISION - DATE       PAGE SYST EM CONTAINMENT PURGE SYSTEM                                                                  M-02GT01            1         9 81
                                                                                                                                       /

121 of 137

                                                                                                 /

O REMARKS VALVE NUMBER p p p4 g e 4

                                                          !                                        AT    RR llZ 4         D-4               2                      A   18"   BiF        AO          O     C      T            S c.               Note 11 PIT   RR AT    RR         3 BT    OP        Sec.               Note 11 IIZ 5         A-5               2                      A   18"   BTF        AO          O     C   FST   OP PIT   RR IIZ 6         C-4               2                      A   36"   BTF        AO          C     C   AT    RR                           Notes 9,     11
                                                                                                                                                              'a IIZ 7         C-5               2                      A   36"   BTF        AO          C     C   AT    RR                           Notes 9, 11 IlZ 8        C-6               2                      A   36"    BTF       AO          C     C   AT    RR                           Notes 9, 11 HZ 9         C-7               2                      A   36"    BTF        AO         C     C   AT    RR                           Notes 9,     11 AT    RR                                                   -

BT OP 3 IlZ 11 A-6 2 A 18" BTF AO O C FST OP Sec. Note 11 PIT RR AT RR 3 BT OP 3 11Z 12 A-7 2 A 18" BTF AO O C FST Op Note 11 PIT RR

                                   '         C   i*     -                 ,

7 3 g 1 ni n S o e r f K i e t o R A c n e ui g E 2 M r G E e d n A 2 R wro E P 1 oP 1 1 1 1 p 3 1 1 1 1 1 e e e e e E 8 t t t t t T A / o o o o o 5 N N N N N D. N O I S I V 0 E R 0 0 0 0 1 1 1 1 1 D 0 I B

                 & 11 P 2 0           R         R R        R R      R R      R M          T          -         R@R          R OR      R8R      R@ R A                   M N

R A TT TT TT T GS L A TjI T I T I T I OEP V N AyP A P AhP AByP RLR og PAV A C C C G3 E L O C N& C I T2,U S1 ES N g O O O O O T AGY g E LA O O O O CICW I S M A A A A VI LA p R L A A A A E A L I I I D I D S G D D N C p I _ " 4 " 4 " M 4 / 3 / 3 E 3 3 O T S v Y S _ B A A A A E T S _ A W _ D 3 2 2 2 2 _ A R D 5 3 I 3 6 3 U - - - - - Q C G F G F I R L E 0 6 B 6 6

 '             .           M         2           3         5        7
 "        , A"
          ,                U         1           1         1        1 N 7       7           7         7        7
 ',.$"s 2'

N" . M E T S E V L A 3 0 V V l l V l l V I I V l l

 '                 Y       V S

, .  ! !. 9 7 3 g 1 n 1 1 ni S o e r K 1 1 f i e R t c n o A , , ui g E M 9 9 e d n G 3 E aro E A 2 R , , oP P 1 1 1 r s s 1 e e E 8 c t T A / o o D 5 N N N O I S I V 0 E R 1 0 Ol D 4

                   &      l i

P 2 0 R R M T - R R A M N R A G S L T T OEP V A A RLR og PAV A C G3 E L og C N& C I g T2,U S1 ES N C C 4 T ASY g E LA CICW I S M M VI LA p R L E A L L S G G N C M p I E T S " " Y 2 2 S g N O g I A A T A N I M A 2 2 T N O C 7 7 E - - D B B i R E

                ..              B
 '                              M
  "        ,'i
           ,",                  U N   6      7 M        E   1      1
 's
 '/.D"4 M"

E T S V L A 0 V 0 V

 '                     Y        V S
 ,                                   .        . l
  • 7 g 3 n 1 ni S o re K it e f R c n o A 3 3 3 ui g E M 3 3 3 3 3 r E e d n G 4 R , ,

wrE o A P 2 1 1 1 1 1 1 oP 1 1 1 r s s s s s s s s e e e e e e e e 1 t t t t t t t t o E8 o o o o o o o T/ N N N N N N A5 D N N N O I S I0

                  \

E R 4 1 D0 IE 4

                   &J P2 0

M T M A N R A A G L A A A A A A A S N N N N N N OEP V - N N RLR PAV A O _ C C O O O O C C G3 E L O N& C I T2,U O O O O S1 ES N g C C C C TSY A g E LA M M M M _ CICW I S M M M M VI LA p R L A A A A A E A A A G G S A G G G G G G N C M E p I T S " " " " " _ Y " " " 2 2 2 2 2 2 2 2 S O L I O B B B B B B B B L E i _ U . F 3 3 3 3 3 3 3 3 Y C _ N E G 6 6 6 5 5 6 6 6 R - - - - - E - - H D H D H D M G C E R _ E

                .            B
   '                         M
   "        ,'i
            ,",y U

8 i 2 5 6

   '/                        N    1        2        7                      1       1      1 E             0        0      0        l M             0                                0      0       0      0 V                      0      0
   $'.% "$' ,ST "J   E L

A 0 J 0 V V V V V V V 8 Y V S

        .f            l
                                                            ,i. . [ :                              -

i 7 3 g 1 ni n S o re f K i e t o R A 3 3 c n E M 3 3 3 3 3 3 ui g r e d G 5 E , n A 2 R , , , , wroE oP P 1 1 1 1 1 1 1 1 1 r t s s s s s s s r e e e 1 e e e e e t t t t t t t E8 t o o o o o o o T/ o N N N N N A N N N D 5 N J O I S IV 0 E R 4 r 1 D 0 4 I E

                   &J P2 0

M T M A N R A A G L A A A A A A A S N N N N N N OEP V N N RLR g PAV A C C C C C C O O G3 E L O N& C I T2,U O O C C S1 ES N g C C C C T ASY g EC LA M CIS W I M M M M M M M VI LA p R L A A A A A E A A A G G S A G G G G G G N C M p I E T " " " " " S " " 2 2 2 2 2 2 2 Y 2 S L g B B I B B B B B B O L E U F 3 3 3 3 3 3 3 3 Y C N E 5 6 6 5 5 4 4 G 5 - - - R - - D H D F C E F C H M R E E B

   '                               M
    "       ,'i m                  U
            ,"x                     N                                           0        1       2       9       0 8'                                             3           4          9                               6       7 6       6
   $ $' , "i            M E

E V 3 0 3 0 5 0 6 0 0 0 0 0 V M"U T S L A V V V V V V V

   '                    Y           V S

f I l l

7 g 3 n 1 ni S o er K f R i e t c n o A ui g E M 3 3

    ,d          G 6        E e       n              R oE      A 2 P

r oP r 1 1 1 s s 1 e e E 8 t t T / o o A D 5 N N N O I S I V 0 E H 4 1 D 0 I E

                &J P2 0

M T - A M N _ R A GS L A A OEP N N V RLR og PAV A O G3 E L O N& C I T2,U _ S1 ES N O O 4 T ASY / g E LA CICW I S M M VI LA p _ R L E A A A G S G N C M p I E T S " " Y 2 2 S 8 v L I O B B L E U F 3 3 Y C N E G 6 6 R - - E G D M R E E

              .             B
 '                          M
          ,' i,             U N  5     6
 $'.!'f , "4      M E

E V 7 0 7 0

  " U             T         L
  'J              S         A   V     V Y         V S

l , ;C p [' 4 7 3 g 1 ni n S o re f K it e o R A 1 1 c n 1 1 r ui g E 7 M G 2 E e d n A 1 R wrEo P oP 5 5 r s s 1 e e E8 t t T/ o o A D 5 N N N Q O I S I V 0 E R 4 1 s 0 0 1 A _ &K _ P2 0 RS RSSR . M T - RC RCCR A M N R A T TT G S L TV TTSI _. OEP V AC ABFP _ RLR Og PAV A C C G3 E L o N& C I T2,U S1 N O O ES 4 TSY A g E LA A O CICW I S S A - VI LA p _ R L E A K L G S C N C p I M 1 2 E g T S Y g C, A _ S A R I A D 2 2 E S S E 2 R 2 P - - M C D

                                   /

O R C E _ B

  '            .                M
   "       ,'i U
  ',                            N          4             9
  $ $' ,"4 M           E          0             2 E           V          2             V T            L M" e U           S           A          V             F Y           V

_ S

                      ,i                          1
  • 9 7

g 3 n 1 1 ni S 1 o r K f R it u o A 1 , c n E M 1 9 ui g G 8 E

      .do n            A         R                ,
      . r E            P    2             ,

oP 1 9 1 P s s 1 e e E 8 t t T / o o A 5 N N l D N O I S IV 0 E 4 i 2 o 0 g A

                        & K p 2 0            R       R M                                     R       R T            M A

_ N R A GS L T T A OEP V A RLR e PAV A C C G3 E L og N& C I g T2,U S1 ES N g C C T ASY g E LA A CICW I S S M VI LA p _ R L E A K C L G S C N I p M 4 4 E p( T S Y g C, S A A R I I A _ D 2 2 E S S E 6 R 6 P - - M D D . O R C E _ B

   '                               M
   / ,">
              ,'i U

d N 9 8 M E 3 1 E $' . "4 E v 0 1 N"" T S L A V V _ " Y S v i I

                                                               ! l : ll\

r e 7 g 3 n 1 ni S i one f o K R 1 t c n A 1 ui g E 9 M 1 1

    ,d              G 2       E
    .         n               R
    . oE r A 1 P

oP 9 9 p - s s 1 e e E8 t t T/ o o A N N D 5 N O I SI V 0 E R 4 2 D O I C 4

                     &K P2 0          R     R         e M                                  R     R T          M A            N R            A G       S    L                     T     T A

OEP V A RLR g PAV A C C G3 E L og N& C I T2,U S1 ES N g C C T ASY g E LA A O CICW I S S M VI LA p R L E K A S A C G C N I p - M " 4 E 4 T p( S Y y S C, A N O A I T C E 2 T 2 O

                         .R P

E 6 6 R - - I B B F R E

                  .             B
 '                              M           3
  "                                         5
 "                              U
 ',         .A
                "               N     8     2 M        E     7 V           V "E            E              4 T's f. "s             T S

Y S L A V V l l

I 9 7 3 g 1 n S ni o re f K i e t o R c n A ui g E 0 M ed n G E A 3 R oE r P 1 oP p 1 E 8 T A / 5 D. N O I S I V E 0 R 4 1 D 0 I J

                    & K P 2 0       P M           T          -      O A                     M N

R A ll G S L T OEP V [ B RLR M e PAV A E T G3 E L S Y C N& C I S T2,U R E S1 N ES T A O 4 TSY A W E LA G 8 _ N O CICW I S I L M VI LA O O p R L C E A A S " G C A N p I R " O 1 T A 8 R v E N E B - G L E S E 3 I D Y - B 6 D A N R A E

  '              .       T   8
  '                      S   M
  ",        ,'i              U
  '.        .",y             N  1
  'd $'."s M       E E       V T       L   V M"U S       A   H

- Y V S

 ,                                        , y r f, t P .
                                                           =

7 g 3 n 1 ni on i e t f c n ui g E o r e do n G1 wr E A 3 P oP 1 r E 1 T 8 A D 5 N O I S I V

                           /

O y E R _ 3 6; M D I

                     & K P 2 0

J 0

                                 /   P O

_ T M A N R A i GS L OEP RLR PAV A V g T B o C G3 E L M N& C I E T T2,U S Y S1 ES N S O T ASY EC CIS W LA L I O E h O M I VI LA R E L B U L '; A A S "A G C

                                 /

N I R O " y _ T 1 A R E N E G B L E S E I

                                  /   3 D

Y B D N

                                 /    6 A

I A T

                  .          S
             ,%",                     2
   's,. l',
             ,          M
   '       $'           E T

V W"U S I I S Y S

,  : r. 9 7 g 3 n 1 ni

  • ione f "

t c n o ^ ui g E "

    .d       n    G2 A

wroE oP P 3 1 r 1 E 8 T / A D 5 N O I S I O ll V E R ~ 4 b*, _ M T 0 J0 1

                  & K P 2 0

f P O l A M N ll/ R A 9 GS L T OEP B RLR PAV A G3 E V M E T S Y flf C N& C L S 5, 1

                                 /

I T2,U R E S1 ES N T A O T ASY W h'f 4 IA E LA G N O CICW I S I L M VI LA R L O O C E A A - S " G N C B I R O l " 1 T A R E N E G lk B S L E l, E 3 I D Y 6 B -

                           -            A D

N " A T S

                                    "" 1
 "        ,,'i
                                     " 0
                                     " 1 M               '
 'S }'f "J           E T
                                     "  V M"U                                    I S

Y S

                                     "  I l          :
                                            . 9 !. h   I 0

7 g 3 n 1 ni S K ione f R t c n o A ui g E M

    .d       n     G3           E A      3     R
    . oEr          D 1

oP p 1 E 8 T / A D 5 N O I S I V 0 E R A / 6 D 0 I J 4

                   &K P 2 0             P M           T            M
                            -           O A           N R           A GS L                                   T OEP   V B

RLR og PAV A C G3 E L [ N& C I M T2 E S1, UN T S O ES Y 4 T ASY S g EC LA L I O CIS W I O M VI LA E B p R L U E A L A S G N C " B p I R 1 O p T g A R E g N B E G L E S 3 E I D Y 6 B -

                              -          A D    R N     E
 '                           A    B
 "               m           T    M      2
           , '" i, S    U      0
 '/.                              N      1
 # $' ,"4
  /                    M E

E V V "U T L

  '4                   S          A      H
 '                      Y         V S
                                                       ;i:   '

7 3 g 1 ni r n S o f K e R i e t o A 0 0 c n E M 1 1 ui g r e d n G 4 E o A3 R , , wrE P 1 6 9 oP r

 .                                      s        s 1            e        e E8                   t       t T/                   o        o A       5            N       N

_ D N O I S I V 0 E R 4 0 9 3 D F0 l 4

                    &L P2 0          RPR        R M                                  ROR        R T            M A          N R          A                               T GS L                               TTI        T A

OEP V ABP RLR t PAV A C C G3 E L [ N& C I T2,U R S1 ES N O O L 4 O C T ASY F g E LA P O O O CICW I S I I S M A VI LA E p R L N E A I A G A G S C l i C N I A p M TM / " 6 6 OE I I T 8 S v

                       &Y S

G A A NN II DA LR ID 2 2 U BT N RE OM 2 2 TP - CI - AU F F EQ R RE E

                 .                 B M
             ,' i,                  U      5        6
   / ,"
   /                                N      9        9 M          E 2'"    $' ,'i,        E T

V L V V M S A F F

   '                     Y          V S

p - . . 7 g 3 n 1 ni S o re K f R i e t o A 0 0 0 0 ic ng i E M 1 1 1 1 r e a G5 E o n A 3 R wr E P 1 oP 9 9 9 9 r s s s s 1 e e e e E 8 t t t t T A 5/ o o o o D N N N N N C O I S V0 I E R 4 1 a0J t

                     &S P2 0       R    R      R    R M             T            -     R    R      R    R A                        M N

R A G S L T T T T OEP V A A A A RLR O PAV A C C G3 E L O C C N& C I T2,U S1 ES N g C C C C T ASY y E LA O O O O CICW I S S S S S VI LA g R L E A A A A A S G G G G N C g I M 1 1 1 1 E T S v Y S A A A A G N I L P M 2 2 2 2 A S R A 7 7 3 3 E - - - - L F E F E C R U E

                   ,       N    B M 2    3      8    9
 'd'" ,. , s,,,
            ,'                  U 1    1      1    1
                 "              N d
   'a !' , 

y M E E V V I V 1 V I V I

   "U                   T       L I    1      I    I A

i S Y S V t u n u

Powe r "L" ?/,','"' INSERVICE TESTING PROGRAM Production U l,'/ ,,, ISI CLASS 1,2 & 3 VALVES Engineering "ix",'i, . CALLAWAY NUCLEAR PLANT P & ID R EVISION - D AT E PAGE SYST EM NUCLEAR SAMPLING SYSTEM M-02SJ04 1 9 /81 137 of 137 v 4 4 g4 0 q.O 4 REMARKS VALVE NUMBER y I 1" GL SO C C NA Note 3 IIV 20 G-7 2 B

                                                                             ~

C AT RR Notes 9, 10 IIV 127 F-6 2 A 1" GL SO AT RR B Note 10 t 11 - 6 2 A 1" GL SO O C FST OP S c. liv 128 PIT RR AT RR , O C Note 10 IIV 129 11 - 5 2 A 1" GL SO ST O S c. PIT RR C C AT RR Notes 9, 10 IIV 130 G-3 2 A 1" GL SO l C C AT RR Notes 9, 10 IIV 131 B-6 2 A 1" GL SO C C AT RR Notes 9. 10 11V 132 A-6 2 A 1" GL SO 1

        *EN'!,"                                                                                                         INSERVICE TESTING PROGRAM                                                                 po  e, "50..,                                                                                                                 ISI CLASS 1,2 & 3 VALVES                                                          Production Engineering
                  '1".'i.                                                                                                   CALLAWAY NUCLEAR PLANT SYSTEM                                                                                                                                                                P & ID           R EVISION - D AT E       PAGE NUCLEAR SAMPLING SYSTEM                                                                                                                         M-02SJ04                ]         9/81      136 of 137
                                                                                                                                 /

VALVE NUMBER y (f p p y4 g g 4 4 U REMARKS B 1" GL M O O NA Note 3 V053 F-7 2 G-7 C 1" CK SA C C NA Note 3 VlOl I r; V102 11 - 7 2 B 1" GL M O O NA Note 3 f A,C 1" CK SA C C AT RR Notes 9, 11 Vlll A-7 2 2 B 1" GL SO C C NA Note 3 IIV 3 F-7 B GL SO C C NA Note 3

               !!V 4         H-7                                                                           2           1" AT     RR llV 5         F-7                                                                           2   A       1"     GL                SO    O        C ST    O            S c.

PIT RR AT RR llV 6 F-6 2 A 1" GL SO O C yT 5 Note 10 PIT RR

%. s. -, e APPENDIX A REQUEST FOR RELIEF FOR PUMPS

PUMP RELIEF REQUEST NO. 1 l SYSTEM: Safety Related COMPONENT: All pumps listed in the program l CLASS: 2& 3 FUNCTION: To provide flow to safety related systems l TEST REQUIREMENT: To test the pump nominally each month (IWP - 3400a) BASIS FOR RELIEF: Industry data has shown that testing of pumps on a frequency of once each month not only decreases plant reliability but also decreases pump life. It has been shown that pump testing every three months actually increases plant reliability and safety. ALTERNATE l TESTING: Test pumps every three months (as required in i the 1980 edition of ASME Section XI B&PV Code). t I (

a.

  ^
                                                             ,       . . -       .e . x... 2 ,

PUMP RELIEF REQUEST NO. 2 SYSTEM: Emergency Fuel Oil System COMPONENT: PJE01A & PJE01B CLASS: 3 FUNCTION: To provide fuel oil to the standby diesel generators. TEST REQUIREMENT: Measure bearing temperature and vibration and observe lubricant level. BASIS FOR RELIEF: These pumps are immersable centrifugal sump pumps located in the emergency fuel oil storage tanks. ! ALTERNATE TESTING: None l i l l l

g- . a; . . . . . c.. - - PUMP RELIEF REQUEST NO. 3 SYSTEM: Saftey Related COMPONENT: All pumps listed in the program CLASS: 2& 3 YUNCTION: To provide to safety related systems l TEST REQUIREMENT: To measure bearing temperature. BASIS FOR RELIEF: Industry data has shown that bearing temperature changes due to degrading bearings only occurs after major degradation has occurred at the pump. Prior to this, the vibration measurement would provide the necessary information to warn the operator of an impending malfunction. Therefore, this parameter will not be measured since its information is after the fact. ALTERNATE TESTING: None l l 1

h, e i 44 % ,el- s-APPENDIX B REQUEST FOR RELIEF FOR VALVES

y . VALVE RELIEF REQUEST NO. 1 SYSTEM: Auxiliary Feedwater P&ID No: M-02AL01 COMPONENT: V006 V009 V012 V015 CATEGORY: C CLASS: 3 , FUNCTION: Valves open with differential pressure to provide flow paths from Essential Service Water System to Auxiliary Feedwater Pumps during a DBA. Normally closed. TEST REQUIREMENT: Exercise the valves every three months. BASIS FOR RELIEF: The testing of these valves would result l l in supplying chemically contaminated water to the steam generators and/or the con-densate storage tank. ALTERNATE TESTING: None l l

g,, . ,

                               ,-- . : a , :. .- .                --

VALVE RELIEF REQUEST NO. 2 SYSTEM: Accumulator Gafety Injection P&ID NO: M-02EP01 COMPONENT: V010 V020 V030 V040 CATEGORY: C CLASS: 1 FUNCTION: Opens on differential pressure to provide flowpaths from the safety injection pump to the reactor coolant system cold legs and the reactor vessel. Normally closed. TEST REQUIREMENT: Exercise valves once every three months. BASIS FOR RELIEF: During normal operation, the safety injection system has insufficient head to overcome reactor coolant system pressure. Testing during shut-down increases the probability of a cold over-pressurization event to occur and is therefore in conflict with plant safety. ALTERNATE TESTING: Full stroke exercise valves at refueling with the reactor head removed.

%            -    -.  .. : t _ _ . . . .. s.. ._ :                  _ .

VALVE RELIEF REQUEST NO. 3 SYSTEM: Reactor Coolant P&ID NO: M-02BB01 COMPONENT: 8949A through 8949D V001 V022 V040 V059 CATEnORY: C CLASS: 1 FUNCTION: Valves open with differential pressure to provide flowpaths from the safety injection pumps to the reactor coolant system hot legs and the reactor vessel. Normally closed. TEST REQUIREMENT: Exercise the valves every three months. BASIS FOR RELIEF: During normal operation, the safety injection system has insufficient head to overcome reactor coolant system pressure. Testing during shut-down increases the probability ;f a cold over-pressurization event to occur and is therefore in conflict with plant safety. ALTERNATE TESTING: These valves will be full stroke exercised at refueling when the reactor head is removed.

VALVE RELIEF REQUEST NO. 4 SYSTEM: High Pressure Coolant Injection P&ID NO: M-02EM01 COMPONENT: 8922A 8922B CATEGORY: C CLASS: 2 FUNCTION: Valves open with differential pressure to provide flowpaths from safety injection pumps to re:Jtor coolant system cold legs and reactor vessel. Normally closed. TEST REQUIREMENT: Exercise valves every three months. BASIS FOR RELIEF: During normal operation, the safety injection ! system has insufficient head to overcome reactor I coolant cystem pressure. Testing during shut-down increases the probability of a cold over-l pressurization event to occur and is therefore in conflict with plant safety. ALTERNATE '

TESTING: Exercise valves at refueling when reactor l head is removed.

I i I l

n . --.. . - ~ .. - - . , VALVE PILIEF REQUEST NO. 5 SYSTEM: High Pressure Coolant Injection P&ID NO: M-02EM01 COMPONENT: V001 V002 V003 V004 CATEGORY: C CLASS: 1 FUNCTION: Valves open with differential pressure to provide flowpaths from safety injection pumps to reactor coolant system hot legs and reactor vessel. Normally closed. TEST REQUIREMENT: Exercise valves once every three months. BASIS FOR RELIEF: During normal operation, the safety it.jection system has insufficient head to overcome reactor coolant system pressure. Testing during shut-down increases the probability of a cold over-pressurization event to occur and is therefore in conflict with plant safety. ALTERNATE TESTING: Exercise valves at refueling when reactor head is removed.

                         -                             - ~--

3 . _ . . . . . VALVE RELIEF REQUEST NO. 6 SYSTEM: Accumulator Safety Injection P&ID NO: M-02EP01 COMPONENT: 8956A through 8956D CATEGORY: C CLASS: 1 FUNCTION: Opens with differential pressure to provide flow paths from the accumulators to the reactor coolant system cold legs and the reactor vessel. Normally closed. TEST i REQUIREMENT: Exercise valves once every thre months. l i BASIS FOR RELIEF: During normal operation, the safety injection . system has insufficient head to overcome reactor coolant system pressure. Testing during shut-down increases the probability of a cold over-pressurization event to occur and is therefore in conflict with plant safety. ALTERNATE TESTING: A partial stroke exercise on the valves during refueling when the reactor head is removed will be made. l l l l i { 1

w .. . -. . . . . . .. VALVE RELIEF REQUEST NO. 7 SYSTEM: Containment Spray System P&ID NO: M-02EN01 COMPONENT: V002 V008 CATEGORY: C CLASS: 2 FUNCTION: Opens on differential pressure to supply containment spray water to the discharge nozzles in the recirculation mode. TEST REQUIREMENT: Exercise valves once every three months. l BASIS FOR RELIEF: Valves can not be stroke exercised without violating the integrity of penetration numbers P-13 and P-16. ALTERNATE TESTING: None l i

VALVE RELIEF REQUEST NO. 8 I

   ,                SYSTEM:                        Containment Spray System P&ID NO:                       M-02EN01 r

COMPONENT: V003 I V004 i V009 f V010 I 6 I CATEGORY: C

g.
'I If                  CLASS:                         2

.' t FUNCTION: Opens with differential pressure to provide flow paths for the containment spray system. l normally closed. is

' TEST Exercise valves once every three months.

REQUIh(MENT: l BASIS FOR RELIEF: Pumps can only be tested at partial flow (per FSAR section 6.2.2.1.4). Therefore, valves l l in flowpath can only be tested at partial flow. ti!, ALTERNATE lI TESTING: Partial flow test the check valves when the

. spray pumps are tested.

t !5 ,f lf lt a !i l

.5
                          .  ..   ...m..__.- _.

VALVE RELIEF REQUEST NO. 9 SYSTEM: Containment Spray System P&ID NO: M-02EN01

COMPONENT
V013 j V017

! CATEGORY: C CLASS: 2 FUNCTION: Opens with differential pressure to provide flowpaths for the containment spray header. Normally closed. TEST REQUIREMENT: Exercise valves once every three months. BASIS FOR RELIEF: Normal flowpath cannot be used without dis-charging containment spray water from the noi:zles . l ALTERNATE TESTING: None

 -                               .      . . . .  . 2 ,            .--   ,

VALVE RELIEF REQUEST N0. 10 SYSTEM: Reactor Coolant COMP 0NENT: 8948A through 8948D CATEGORY: C CLAS_S_: 1 FUNCTION: Valves open with differential pressure to provide flowpaths from the Accumulator Injection System, Safety Injection Pumps, and Residual Heat Removal Pumps to the Reactor Coolant System cold legs and reactor vessel. Normally closed. T__i REQUIREMENT: Exercise the valves every three months. BASIS FOR RELIEF: During normal operation, the residual heat removal pump cannot overcome the reactor coolant system pressure. Testing during shutdown increases the probability of a cold overpressurization event to occur and is therefore in conflict with plant safety. ALTERNATE TESTING: These valves wi'l be exercised during cool down ' for refueling by the residual heat removal pump flow. (

SUFPLEMENTAL REPORT

                            -                                       to the INSERVICE TESTING PROGRAM (Task 2)

CALLAWAY PLANT Prepared for UNION ELECTRIC COMPANY Prepared by POWER PRODUCTION ENGINEERING Prepared and issued by: 0 $$,/Yf y Mte JOHN R. KNOKE, President

g . .m . _ .. . . Task 2-1 The ISI Testing Program was prepared in accordance with the ASME B&PV Code, Section XI, Subsections IWP and IWV (1977 Edition f through Summer 78 Addenda). The differences between the 1977 and 1980 Editions are minor, but should be noted. ) The most significant difference is Article IWP-3400, titled

        " Frequency of Inservice Tests." The 1977 Edition states that an inservice test shall be run on each pump every month. The 1980 Edition revises this to once every three months. PPE has included a Pump Relief Request (PRR-1, Appendix A of ISI Testing Program)                         1
                                                                                                  ]

so that testing will only need to be performed once every three months. Article IWP-4320, which concerns the te:aperature measurements Since of the pumped liquid has been deleted in the 1980 Edition. no relief request this data has usually be considered irrelevant, is necessary. Various other Articles in the 1977 Edition were deleted. j Some Articles l These Articles were either redundant or obvious. were added for clarification. There are no differencesFor in the your I Inservice Testing Program due to these minor changes. reference, PPE has prepared the following list defining the changes l l In the 1980 Edition:

1. Subsection IWP e IWP-1200 (b)

Added an exclusion for pumps used for operating convenience. e IWP-1600 This Article was deleted because all hydraulic parameters must be tested, and obviously, a change in parameters may warrent corrective action. (See table IWP-3100-1). Same reason as IWP-1600 except this refers e IWP-1700 to mechanical parameters. e Table " Symbols, Quantities, and Units" This IWP-2100-1 table was deleted because it refered to IWP-1600 and IWP-1700.

  - -       -      --    -    -- -__     . _ . _ _ _ _        2_._ _ ,_. -- -     _ .         _
                    . - . . -  ... a.s.         .                     _ .

e IWP-6260 Deleted the obvious, keep records current and make available for audits.

2. Subsection ,IWV e IWP 3413(a) Added a statement that defines stroke time.

e IWP 3413 (c) bioved to Article IWV 3417 (a) . e IWV 6240 Same reason as IWP-6260. e G J}}