Forwards Promatec 860217 Part 21 Rept Re Defective Matl Used in Fire Stops to Determine Applicability to Facility
ML20140B199
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/07/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
REF-PT21-86 NUDOCS 8603240010
Download: ML20140B199 (1)


Text

w MAR 0 i 1986 In Reply Refer To:

Docket: 50-298 Nebraska Public Power District' ATTN: J. ft. Pilant,fianager, Technical Staff-Nuclear Power Group P. O. Box 499 Columbus, Nebraska 68601 Gentlemen:

4 This forwards a copy of a letter from Promatec, dated February 17, 1986, for your information. This letter was a 10 CFR Part 21 report concerning, defective material used in fire stops and may be applicable to the installations in your facility..

Sincerely, Ordinal S!aned By J. E. Gagliardo J. E. Gagliardo, Chief Reactor Projects. Branch

Enclosure:

As stated cc w/ enclosure:

- Guy Horn, Division Manager of Nuclear Operations Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bec distrib. by RIV:

RPB DR3P Resident Inspector R.-D. Martin, RA Section Chief, RPB/A. RSB R&SPB RIV File RIV:RPB JEGagliardo/lk 9/1/86 8603240010 860307 PDR S

ADOCK 05000298 pop 4g j

\

L

.- v PROGRESSIVE MATERIALS AND TECHNOLOGES. INC.

Q.100.020 February 17, 1986 D$@$b@

U.S. Nuclear Regulatory Comission FEB 19 5 611 Ryan Plaza Drive, Suite 1000 $

_ Arlington, Texas 76011 "

Attention: Mr. Robert Martin Administrator, Region IV

Reference:

10 CFR Part 21 - Notification of Defects Gentlemen:

Pursuant to the provisions of 10 CFR Part 21 - Reporting of Defects and Non-compliance, notification is hereby given of the existense of defective con-duit seals at Waterford 3 and other nuclear generating stations as identified herein. Final information leading to this report was obtained on February 13,1986 at 12:00 p.m. and verbal notification as required by 21.21 (2) was given on February 14, 1986 at 8:36 p.m. to Mr. David Powell, U.S. Nuclear Regulatory Comission, Washington, D.C.

Information contained in this report is based on fire tests performed on two (2) existing seal configurations and subsequent preliminary evaluations con-ducted by B&B PROMATEC, Incorporated and Louisiana Power & Light Company.

l Details are as follows:

1

(1) PROMATEC conducted a series fire tests on two (2) penetration / conduit l

seal configurations that are presently installed at various nuclear l

generating stations in accordance with the requirements of ASTM E119, 814 and IEEE 634. The initial purpose of the tests was to ascertain the effects " pull rope" extending through conduit seals would have on

! the ability of such seals to perform their intended function. While

" pull rope" was shown not to be a factor in the ability of the seals to perform their intended function during initial tests, both conduit seals failed to perform properly causing the seal configuration them-selves to become suspect.

Additional tests were conducted with the same configurations deleting

" pull ropes" to determine design integrity of the seals. The config-urations and characteristics tested are as shown on attachments 1 l

- i_ g , a d -

'l' f ] y-

-- l "~l '

i P.O. BOX 4672

  • HOUSTON, TEXAS 77210 e (713) 690-5240 l ..

Fcrm No: QC-13

, . LETTER OF TRANSMITTAL 03/01/a0 I ,

Rev 1 - 09/01/80

.: h Rev 2 - 04/01/83 g  :-: ('

FEDERAL EXPRESS Rev 3 - 09/25/94 021-052-732 (Ref. QCP 0006)

DEPARTMENT: na/tr TRANSMITTAL NUMBER: 100/928 TO: U.S. Nuclear Reaulatory Commission DATE: 2/18/86 JOB NO: MISC.

611 Ryan Plaza Drive. Suite 1000 RE:

Arlinoton. Tx. 76011 ATTN: Administrator, Region IV-Robert Mart in

. GENTLEMEN:

WE ARE SENDING YOU: (XX ) ATTACHED ( ) UNDER SEPARATE COVER

( ) DRAWINGS ( ) COPY OF LETTER ( ) SPECIFICATIONS

( ) QUALITY ASSURANCE PROGRAM ( ) QUALITY CONTROL PROCEDURES

( ) PRODUCTION PROCEDURES ( ) -

( )

COPIES DATE SERIAL NO. DESCRIPTION l 2 2/18/86 0.100.020 5 oace letter with 3 attih3 _.its l

l l

l-THESE ARE SUBMITTED: ( ) FOR APPROVAL ( ) AS REQUESTED l ( ) FOR REVIEW AND COMMENT (xx ) FOR YOUR USE ( ) RETURNED FOR CORRECTIO RE RKS: / s /

! COPY TO: SIGNED: MIhnr#/i M M/IN4 TITLE: bualityCdrolSeNb-[

~

iiii!!!!!!!!!!p5=:!!!!!!!!!!!!!!;;;;;5:155!!!!!!!!!;;;;;i!!!!!953555!!!!!!!!!!!!!!!!! !!!!!4!!!!!!!!!j;!!!![ji!!!!!!!5!!!!!!!!!!!!!!!!!!!!!!!!:;

l PLEASE NOTE: RETUN YELLOW ACKNOWLEDEENT CCPY TO B&B INSLLATION, INC. Include any Caneents in space provided.

TRANSHITTAL: ( ) COMPLETE ( ) NOT COMPLETE ( ) DISCREPANCIES NOTED BELOW Returned l by:

Title:

Date:

l l

, P.O. BOX 4672, HOUSTON, TEXAS 77210. (713) 690-5240

[ White (Original). Addressee; Yellow - ACKNOWLEDGEENT Return to Sender; Pink - File @DU

.Tu: Administrator, Region lV Q.100.020 from: Randal W. Brown Page 2 of- 5 and 2, and as further described below.

1.0 Test Penetration Characteristics One 8" x 8" blockout and one 8" x 20" blockout in a 12" thick concrete slab with two (2) conduit penetrators as described below and detailed on drawing no. B-519 (attachment 1).

1.1 4" diameter x 27" long steel conduit 1.2 40% actual fill of IEEE 383 rated cables. Cables were a total length of 62" and extended a minimum 36" absve the slab.

1.3 Conduit extended a minimum 1" above the top of the slab-and a minimum 12" into the furnace below the slab. Cable fill and mix within each conduit was similar- to the ANI/

MAERP requirement of one-third 16 CA/2 cond (Representing instrumentation cable), one-third 12 GA/7 cond '(Represen-

-ting control cable),' and one-third 300 MCM/1 cond (Repre -

senting power cable).

2.0 Penetration and Conduit Seal Characteristics 2.1 Materials used in installation consisted of:

2.1.1 Damming and cable separation - Alumina Silica F1--

berous Material (Bulk and Board).-

2.1.2 Penetration and conduit seal - Dow Corning 3-6548 Silicone RTV Foam i

2.2 Penetration and conduit seal configurations were as fol- '

lows:

2.2.1 Configuration 10976.1 - Conduit seal with a minimum i depth of 6" plus 1" damming as measured from tte top of the slab; penetration seal with a minimum depth of 10" plus 1" damming as measured from the top of l the slab.

2.2.2 Configuration 1097b.2 - Conduit seal' with a minimum depth of 6" plus 1" of doming as measured from the top of the al&5; pmtration seal with a 6" depth plus 1" of damming es measured from the top of the slab.

i l-

f To: Administrator, Region IV Q.100.020

, From: Randal W. Brown Page 3 of 5 3.0' Test Characteristics 3.1 Thermocouples were located in accordance with the require-ments of IEEE 634 and ASTM E119 as shown on drawing no.

B-520 (attachment 2).

3.2 The prepared test slab assembly was exposed to the standard time temperature curve established by ASTM E119 for a period of three (3) hours with the following results:

3.2.1 Configuration 1097b.2 - Thermocouple F-19 exceeded the maximum allowable with a temperature of 4010 F at 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, 23 minutes and a three (3) hour reading of 6590 F.

3.2.2 - Configuration 1097b.1 - Thermocouple F-25 exceeded the maximum allowable with a temperature of 401o F at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, 14 minutes and a three (3) hour reading of 4460 F.

3.3 While no flame through was noted on the unexposed side and hose stream tests did not cause openings, heat transmission as indicated by the field thermocouples exceeded the max-imum temperature requirement of 3250 F above ambient. An autopsy was performed and resulted in 'the discovery that both conduit. seals were reduced to ash.

3.4 Although the affected seals did not meet the full three (3) hour requirement for heat transmission, both configurations are operable up to the time periods referenced in para-graphs 3.2.1 and 3.2.2, respectively.

(2) The requirement to install conduit seals at the fire barrier was in-cluded in design specifications for various stations in order to comply with Branch Technical Position 9.5.1-29 (3). Preliminary investigations by Louisiana Power & Light Company and B&B PROMATEC indicate that the defective configurations are probably of a generic nature affecting an - unspecifit;d number of nuclear generating sta-tions.

The number and locations of all affected stations cannot be deter-mined by Louisiana Power & Light Company or B&B FR0fATEC as various utilities and sec1s contractors'may have design 6d and installed simi-

. lar configurations. Preliminary investigations by Louisiana Power &

Light and B&B PROMATEC has determined that the following stations and

F To: Administrator, Region IV Q.100.020 i From: Randal W. Brown Page 4 of 5 licensees are likely to be affected, as a minimum:

  • WATERFORD 3......................... Louisiana Power & Light Co.
  • CRAND GULF 1........................ Mississippi Power & Light Co.
  • NUCLEAR ONE 1....................... Arkansas Power & Light Co.
  • SHEARON HARRIS 1.................... Carolina Power & Light Co.
  • WOLF CREEK.......................... Kansas Gas & Electric Co.
  • CALLAWAY 1.......................... Union Electric Co.

Various organizations have participated in the design and installa-tion of penetration and conduit seals at the locations identified thus far. Evaluations to determine the number and locations of all defective seals is expected to be an extensive, time consuming opera-tion that would require the collective efforts of all affected orga-nizations. Evaluations are currently in progress by B&B PROMATEC and Louisiana Power & Light for Waterford 3.

(3) Other tests were conducted satisfactorily to provide potential cor-rective actions that may be taken for those seals determined to be unacceptable for the operability time periods previously referenced.

Possible corrective action measure include:

(a) Evaluation of affected conduit seals to determine if exception can be taken to the required three (3) hour rating.

(b) Rework of conduit seals that can not be excepted from a three (3) hour rating by installing:

l (1) Installing a 3" depth silicone RTV foam seal boxed off with 1" alumina silica board at the conduit termination point (attachment 3). This would also require the installation of an additional 6"' depth seal at the nearest accessible point on the continuous run side of the conduit.

I I (2) Installing an additional 6" depth conduit seal at the nearest accessible point on the continuous run side of the conduit.

Due to the apparent generic nature of this condition, it is requested that assistance and/or direction by the NRC t.e given in order that we may proceed in the proper manner.

I

F-To: Administrator, Region IV Q.100.020 8

from: Randal W. Brown Page 5 of 5 Please contact the writer at (713) 690-5240 at you earliest convenience.

~

Sincerly yours,-

PROMATEC andal W. Brown Quality Assurance Mangaer RWB/dmck at tachments: (1) Drawing Number B-519 (2)~ Drawing Number B-520 (3) Drawing Number B-505 cc: R. Block R. Pearson R. Werme G. Burt L. Spriggs B. Collier (LP&L)

e Ig CEE ,q I $

w.

a- t:b

- - = '

h)

T.. -s  ! eg ,/gg

' f ~._ - s3 l

.gI I

b h-7_L L

g B: M vW i

h E==j i 6 i 3 h i J 10l i_._ .,

h 4r 4 I m

a r-

<, 11 . W r

  1. 44 a ro '

J. g . .. . .

t

--. . _ .- --- t

< - = - I i n . .

, . .... a

_t.

  • F li l -

b5

/

I g 'i.; I 2

-hI-

)i -

Y 4 -]s i .lg .i

- ::Im i b_ g

'=;=iin:e -

~

i -

=

} .= .
_ . . - -

,,; . m mm .-._. .

W 2 .i:
  • 2e I. b, E 11l ):'j!

a W. i+:- t.J

a. sa m....sE
x o cu e

s

-jt c

w f g-l- .,.gg..._...____

_ ,l h _

l::d214w 51 2m l

L 5::d@:$3 .'.N.

.a 5+ .::+3 0i A b5 .

h2 < 55$ $ hj vi

~,

5 .:i dI __ ~1 32 1 .:@i I

I s

i 0Z0'00L*O L luamyaelly

.J

e q i" fl

~~

I -

E ,:

i I B a

Pi:

l i l I

t 9

i q' g*,

i M

~

t1 -

?

. =

l n w A ,

d =

m~ ~- og a

- =

    1. W L

- 2 2 l 4 i w

. 4

- -a

_== -

i b R

  • E

~ E as

. t w E

2

! A  ::- *

. I t u. -

l ._l ,

i I

e OZO*00L*O z luaumpelly g --- ,

l l .

1 a 40I ACTilAL CAaLE FILL IfiE NATED SITE SPECIFIC CABLE 36" Top "

i I I-34 0F CAaLEs f f l- -

glsi: F-33 E-36 4. ,

h Borens or nesseems somme -

a ls L

/AmosutETmTAL lp l , ,i '

- . ll E p,

5 3* DEPTM r7 .' Mi l

{,II'll, i

7- - 3-6548 stLICoat roan ,I . L

- ,i ,

i {,l ,

iggb

' hew Putt . j]!!l f

  1. ~~~

R'PE j -

i

,I c2 g

10 oEr u 3-E548 s:L CONE Q ,i .

i i

.. 3-6548 SILICONE NTY Fo m 8

I '

l

. aTy FoAn i e

s

" liil:st I -

.: ::!!::. l I 1* non, nasoiras 1 1  !

l' f

, - - se a I L - I -

1* non. D m ins i 2 4" s x 27" STEEL 7 ConoUIT 12* - -

- - . _ l-n q t = e ei,E CA, gaf t E. 7_9 -

6 P -6 SILICONE N W RTV Fo4M w/nepecilis 3 e i BONED FOR 3* A0otTIOmAL 3-6548 sILIComE FOAft gg a f^

=C 1  ; - _ (10* 3-6548 sit Coat Foam "0 VAL ""*'one geurtnamerar- #

, l---. D _d 80 '

part e, ,, ,,,, ,,

CTP 1057A CMIT TEST CTP 1057AS ETAll 1 Y[ ptar - -

8 e [g3 ' =* NTS Ymmerm 2 -

use

~

Trnum

==s..,

-~

E-505

\l. i , .