Forwards Insp Rept 99900762/85-01 on 850916-19 & Notices of Nonconformance & Violation
ML20140A738
Person / Time
Issue date: 01/21/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Manion W
NUCLEAR ENERGY SERVICES, INC.
Shared Package
ML20140A744 List:
References
REF-QA-99900762 NUDOCS 8601230360
Download: ML20140A738 (2)


Text

Om6: 32.'09

,e a ur h'

4 e

UNITED STATES I

8 T',n NUCLEAR REGULATORY COMMISSION

o

'+9....,o January 21, 1986 Docket No. 99900762/85-01 Nuclear Energy Services ATTN: Mr. W. Manion, President Shelter Rock Road Danbury, Connecticut 06810 Gentlemen:

This refers to the inspection conducted by R. P. Correia of this office on September 16-19, 1985, of your facility in Danbury, Connecticut and to the discussions of our findings with Mr. C. E. Anderson and members of your staff at the conclusion of the inspection. Additionally, on October 3, 1985, R. P. Correia witnessed testing of the steam generator nozzle dam assembly conducted at Reno Machining Company for NES. Observations and findings concerning this activity are discussed in the enclosed inspection report.

The purpose of this inspection was to inspect NES' activities relative to the design, fabrication, inspection and testing of steam generator nozzle dams for the Ft. Calhoun Nuclear Power Station. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements.

The findings include the failure to impose the requirements of 10 CFR Part 21 on a sub-vendor supplying basic comper.ents for a licensed facility, and failures concerning the implementation of your quality assurance program in the areas of design control, corrective action and audits.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

The enclosed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974.

You are required to submit to this office within 30 days from the date of this letter a written statement containing:

(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed.

Consideration may be given to extending your response time for good cause shown.

You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance.

8601230360 860121 PDR GA999 EECPESI _

99900762 PDR

Nuclear Energy Services January 21, 1986 the responses requested for this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have ary questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Criginal S%nad by acry G.Zack '

Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1.

Appendix A-Notice of Violation 2.

Appendix B-Notice of Nonconformance 4

3.

Appendix C-Inspection Report No. 99900762/85-01 4.

Appendix D-Inspection Data Sheets (8 pages)

Distribution:

DMB:lE:09 VPB Reading DQAVT Reading t

RVollmer 0

JTCollins JStone GHolahan, NRR Region IV JCraig RCorreia RPMcIntyre LYandell, SRI, Ft. Calhoun Omaha Public Power District Control Data Corp.

d h@SC/VPB:0QAVT VPB:0QAVT 9

B/ B:DQAVT.

V RCorreia

' JCraig GGZech

/85 l/q 85

// /(, /85 l} /6 /8:i g

I l