Monthly Operating Rept for Aug 1985
ML20138R860
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1985
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8511190153
Download: ML20138R860 (4)


Text

.

4 OPERATING DATA REPORT WNP-2 03-Sep-85 1.

DOCKET: 50-397 2.

REPORTING PERIOD:

Aug-85 OUTAGE +0N-LINE HOURS 744 3.

UTILITY CONTACT:

LEONARD HUTCHISDN (509) 377-2501 EXT-2486 1

i4.

LICENSED THERMAL POWER (MWt):

3323 I5.

NAMEPLATE RATING (GROSS MWe):

1200.1

!6.

DE]IGN ELECTRICAL RATING (NET MWe):

1100 7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1140 4

' O.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1095 i9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

i

!10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

___h_b_

i

'B' RRC PUMP It0PERABLE

!11. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

! 12. REPORT PERIOD HOURS 744 5931 6271.2 i13. HOURS REACTOR CRITICAL 735.3 4071.0 4437.5

?14. RX RESERVE SHTDWN HRS 0.0 1029.9 1029.9

15. HRS SENERATOR ON LINE 732.1 3825.0 4223.4 l16. UNIT RESERVE SHUTDOWN HOURS 0.0 1046.9 1046.9 l17. GROSS THERMAL ENERGY (MWH) 1705900 9727543 10941171
18. GROSS ELECTRICAL ENERGY (MWH) 575540 3199600 3626530

!19. NET ELECTRICAL ENERGY (MWH) 551036 3066059 3476445

20. UNIT SERVICE FACTOR 95.4%

65.6%

67.3%

l21. UNIT AVAILABILITY FACTOR 98.4%

S3.6%

S4.0%

l22. UNIT CAPACITY FACTOR (MDC NET) 67.6%

45.0%

50.6%

.23. UNIT CAPACITY FACTOR (DER NET) 67.3%

47.5%

50.4%

'24. UNIT FORCED DUTAGE RATE 1.6%

14.2%

13.7%

25. FORCED OUTASE HOURS 11.9 630.9 672.6
26. SHUTDOWNS SCHEDULED DVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):

l27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

951119 38 1

[4 PDR A

M0 397 R

em

\\

u

AVERAGE DAILY UNIT POWER LEVEL 50-397 DOCKET NO.

UNIT WHP-2 DATE 9/1/85 COMPLETED By L.8. Hutchison TELEPHONE (509) 377-2501 ex t. 24db MONTH August 1985 DAY AVERAGE DAILY POWER LEVEL

,hIhY WER LEVEL 1

75 769 17 754 2

583 1s 750 3

758 340 is 779 20 579 s

781 21 72) s 733 22 755 7

779 23 767 a

775 24 162 765 s

2s 769 769 to 2e 11 770 772 ty 769 771 12 as 13 771 773 2e 770 14 768 30 768 777 15 31 771 18 INSTRUCTIONS On this form, list the aweses daily unit power lowl in MWe Net for each day in the reporting month. compute to the nearest whole messwett.

1hese figures wdl be used to plot a ysph for each reporting month. Note that when maximum dependable espacity is used for the net electrical rating of the unit, there may be occasions when the daily averaps power lent exceeds the 100% line (or the restricted power towl line). In such cases, the awesse daily unit power output sheet should be footnoted to expisin the apparent anomaly.

l t

DOCKET NO.90-357 WIT tWE WNP-2 DATE 9/3/85 LNIT SIUIDOWNS / REDUCTI0tts COMPLETED DY i.;B;Hutchison REFUtT PERIOD AUGUST 19 85 TELEP10tE (509) 377-2501 ext 2481

month, year T DX1E M HIIS NDBtB TETFE IITRREiT SYSTEN CCNPONENT CAUSE & C0fVtECTIVE ACTION 10 HlEVENT RECUIV1EfCE !

85-16 8/4/85 F

1 1.136 A

3 85-053 IA INSTRU-E Reactor scrammed at 71% power while performing an instrument surveillance of ATWS RRC Pump Trip feature, due to a faulty instrument Isolation valve. The valve will be replaced.

l l-l l

l StANN1Y [

TYPE REASDN SETHOD SYSTEM & COMP 0KNT F-Fcrced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched D-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet 5-Reduced Load Licensee Event Report E-Operator Training 9-Other (LER) File (NUREG-0161)

& License Examination

r.

O

~

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 September 6, 1985 Docket No. 50-397 l

Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Subject:

NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for August 1985 as required by our Technical Specifications 6.9.1.6.

Very truly yours, C

1. Powers (M/D 927M)

P-2 Plant Manager CMP /p1 Enclosure cc: Mr. John B. Martin -

NRC, Region V WNP-2 Site Mr. A. D. Toth Ms. Dottie Sherman -

ANI, Farmington CT