ML20138R713
| ML20138R713 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 10/30/1985 |
| From: | Butcher E Office of Nuclear Reactor Regulation |
| To: | Randazza J Maine Yankee |
| Shared Package | |
| ML20138R714 | List: |
| References | |
| GL-83-28, NUDOCS 8511180795 | |
| Download: ML20138R713 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _
W( (L Docket No. 50-309 October 30, 1985 D
Mr. J. B. Randazza Executive Vice President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, ME 04336
Dear Mr. Randazza:
SUBJECT:
GENERIC LETTER 83-28. ITEM 1.2 " POST TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR THE MAINE YANKEE NUCLEAR POWER PLANT The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2.
For the Maine Yankee Atomic Power Plant, your response was found to be incomplete in four of the areas evaluated.
The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.
In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will pemit us to complete our review.
It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the TER. Your project manager will be working with you to arrange an acceptable time to conduct the necessary conference calls. contains supporting information in preparation for the telecon.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing
Enclosure:
1.
Supporting information for telecon cc w/ enclosure:
8511180795 851030 See next page hDR ADOCK O 9
Distribution:
Docket File BGrimes NRC & L PDRs EJordan HThompson AThadani OELD ACRS 10 RWHouston PKreutzer Branch Files PSears
<8* N RB#3:DL ORB #3:DL B#3:
PKr zer PSears;ef EButcher 5
/o /n/85 to 40 /85
Mr. J. B. Randazza Maine Yankee Atomic Power Company Maine Yankee Atomic Power Station CC:
Charles E. Monty, President Mr. P. L. Anderson, Project Manager Maine Yankee Atomic Power Company Yankee Atomic Electric Company 83 Edison Drive 1671 Worchester Road i
Augusta, Maine 04336 Framingham, Massachusetts 07101 Mr. Charles B. Brinkman Mr. G. D. Whittier Manager - Washington Nuclear Licensing Section Head Operations Maine Yankee Atomic Power Company Combustion Engineering, Inc.
83 Edison Drive 7910 Woodmont Avenue Augusta, Maine 04336 Bethesda, Maryland 20814 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330 Mr. John H. Garrity, Plant Manager Maine Yankee Atomic Power Company P. O. Box 408 Wiscasset, Maine 04578 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 i
Mr. Cornelius F. Holden Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box E l
Wiscasset, Maine 04578 1
-