ML20138R705

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1985
ML20138R705
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/31/1985
From: Jones V, Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
85-667, NUDOCS 8511180787
Download: ML20138R705 (40)


Text

F _

  • . i o 4 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTIILY OPERATING REPORT REPORT NO. 85-08 APPROVED BY: 32 /2ee 5TNFION MANAGER 8511180787 050031 g\

DR ADOCK0500gG

9 i Section Page Operating Data Report - U Jt #1 }

Operating Data Report - Unit #2 2 Unit Shutdowns and power Reductions - Unit #1 3 Unit Shutdowns and Power Reductions - Unit #2 4 Load Reductions Due to Environmental Restrictions - Unit #1 5 Load Reductions Due to Environmental Restrictions - Unit #2 6 Average Daily Unit Power Level- Unit #1 7

. Average Daily Unit Power Level- Unit #2 7 Summary of Operating Experience 8 - 10 Amendments to Facility License or Technical Specifications 11 Facility Changes Requiring NRC Approval 12 Facility Changes That Did Not Require NRC Approval 13 & 14 Tests and Experiments Requiring NRC Approval 15 Tests and Experiments That Did Not Require NRC Approval 15 Other Changes, Tests and Experiments 15 Chemistry Report ,

16 Description of AllInstances Where Thermal Discharge 17 Limits Were Exceeded Fuel liandling IO O I9 Procedure Revisions That Changed the Operating Mod 20 Described in the FSAR Description of Periodic Tests Which Were Not Completed 21

. Within the Time Limits Specified in Technical Specifications

F' 11 Section Page Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit # 1 - Mechanical Maintenance 22 - 24 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit # 1 - Electrical Maintenance 22 - 34 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 -Instrument Maintenance 22 - 34 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Mechanical 35 & 36 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Electrical 35 & 36 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 -Instrument Maintenance 35 & 36

'., , ADM-49 Page1 A- ACEMD;T 5 Page 1 of 3 OPERA ~!NG DATA FJ. PORT G 00 N DOCl'IT NO. S0-280 DATIno-o 5-85 COMFLETED BY v.Tn"as 7 " HONE (804 n57-3184

, OPERATING STATUS i

1. Uni: Name: Surry 1 Notes
2. Reperting Period Amust 11. lor 5
3. Licensed Thermal Power (MW:): 2441 4 Nameplate Rating (Gross M"e),: 847.5
5. Design Elec:rical Rating (Net G e): 788
6. Maximum Dependable Capacity (Gross E e): 820 1 7. . Fav4 =n= Dependable Capacity (Net MWe): 781 l'

S. If Changes Occur in Capacity Ratings (Items Number 3 Tnrough 7) Since Las:

Report, Give Reasons: Na 3

9. Power Leval To Which Ras:ricted, If Any (Net MWe):
10. Reasons for Restrie:Lons, If Any:

This Month Tr.-to-Date C"-"'i=tive

11. Ecurs In Reporting Period 744.0 5831.0 111263.0 1 12. Nu=her of Hours Reactor Was Critica.1 379.5 5051.3 69428.0
13. Raactor Reserve Shutdown Bours 0.0 0 a 7 74.a  ;
14. Ecurs Generator On-Line mo aogo ! 6796R.2
15. Uni: Reserve Shutdown Ecurs n_n n 37 3ri.2
16. Gross Thermal Energy Generated (ggg) 639735.2 11354664.9 157368842.0
17. Gross Elec:rical Energy l Generated (MWE) 205590.0 3766270.0 50618233.0
18. Ne Electrical Energy Generated (MWE) 193141.0 3577125.0 ' 47988969.0 l 19. Unit Service Factor 44.1 % 85.1 % bl. A m i
20. Uni: Available factor 44.1 % 85.1 % 64.4 5

.21. Uni: capacity Tactor (Using MDC Net) 33.2 % 78.5 % 55.2 %

22. Uni Capacity 7 actor (Using DIE Ne:) 32.9 % 77.9 % 54.7 %
23. Uni: Forced Eate 95.9 % 9.6% 19. '1 %

24 Shutdowns Scheduled Over Nex: 6 Menthe (Typt. Date, and Dura:1e:. of I.ach):

i l

25. If Shut Down A: End Of Repcrt Period Estimsted Date of Startup:

! 26. Units In Tes: Status (Prior Oc Co=mercial Operation): Forecas: Achieved

'"**IAL CRITICAL!n*

! INITIAL ILECTRICIn' COMMERCIAL OPERATION l . ,

(9/77) i

_. _ _ . _ . _ . _ _ _ _ _ . _ _ _ _ . . _ _ _ _ _ , . . _ _ , - _ _ _ _ _ . _ . _ _ _ _ , _ __ - . _ _ _ . , _ _ _ _ _ _ - _ . . -__.m____,, , . _ . , _ _ _ -

, ADM-49 Page 2

, , ATTACIDCET 5 l

J Page 1 of 3

~

OPERATING DATA FJ. PORT TEE 0 5 34 '

D00KET NO. S0-281 DATI 09-0 3-85 C0YJLETED BY v. Innes 7 " HONE r 804 n S7-3184 OPERA ING STATUS i

1. Unit Eame: Grev 7 Notes
2. Reporting Period: Aucust 31,1983 i 3. Licensed Thermal Power (MW:): 2444 4 Nameplate Rating (Gross We),: 847.a
5. Design Elec:rical Rating (Net W e): 788
6. hri== Dependable Capacity (Gross MWe): 811 7.. Yrr4== Dependable Capacity (Not We): 775
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: N/A i

j i 9. Power Level To Which Rastricted, If Any (Net We):

10. Reasons For Rastrictions. If Any:

s t

This Month Y .-to-Data C'=="1=tive i

11. Ecurs In Reporting Period 744.0 SA31,0 108143.0

, 12. Number of Ecurs Raactor Was Critical 744.0 3462.9 69469.1

13. Raactor Reserve Shutdown Ecurs 0.0 0 328.1 I -
14. Ecurs Generator On-Line 744.0 339u.5 68298.1 i 15. Uni: Raserve Shutdown Ecurs 0.0 u o j 16. Cross Thermal Energy Generated (ET) 1775663.9 7478948.1 159477353.4
17. Gross Electrical Energy Generated (E E) 575255.0 2388945.0 51679419.0
18. Net Ilectrical Energy .

Generated (WE) 546375.0 2260302.0 48976744,0

19. Unit Service Factor 100 % 58.1% 63.2w

! 20. Uni: Available Tactor 100 % 58.1 % 63.2 m

~

.21. Unit Capacity Factor (Using MDC Net) 94.8 % 50.0 % 58.4 %

22. Unit Capacity Factor l (Using DIE Net) 93.2 % 49.2 % 57.5 %

, 23. Unt: Forced Ra:e o .4% n.o%

24. Shutdowns Scheduled Over Nex: 6 Months (Type Date, and Duration of Each).

Sm:55ar/Meintananca 11-R5 - 10 davs l l

25. If Shut Down A End of Report Period Estimated Date of Startup: l
26. Units In Tes S s:us (Prio to Commercial Operation): Forecast Achieved l l

, INITIAL CEITICALIIT I

INITIAL ILECTRICITY l COMMERCIAL OPERATION 1

(9/77)

'7'* e. , y _

s. . . *

.' i

3

.. (

a *

  • i so-280 - I IsOCKET NO.

' UNITS $NIThoWNS ant) POWER REDUC 110NS IPN8T NAME surry 1 i i

DA1E 09-ns-A; 00MPl.EIED gy V.11. Jones REFORT MONI]l Ano_ 1995 (804)357-3184

' 1ELFrfM7NE l

) "t.

$ liensee {g "L Cause A Coseecil,e

.! E j

no. Date h y see Event p Acilim te .

F oh su: j afg Repool # we O reevesel Recessence 85-11 08-04-85 P 416.2 G 3 85-015 Reactor trip caused was RCS "A" Loop low flow signal to Fx trip circuitry.

The signal was caused by operator bumping flow sensing lines in loop room. No corrective action needed, i

~

g .!

i I

i 4

l

}

}

1 3 4 j 8 3 Method: Enl ibit G - Insiencthms

F
Foiced Ressem:

for reerstation of Dats S: Scheiluled A Eigvismient Fallme(Emplain) I-Manuel 4

' g Maineenence os Test 2-Manual Scsem. Entsy sheets for 1.icensee 3-Antoni=41c Scism. Event Repost (l.ER) File INURI G-C-Refueling D.Regulatcey Restaleshm 44) leet (Emplebel 0161) i E4)pesator Tisining A Ikense Essenineske F-Adeninisetselve 3 m G-Operatiosesi Laos (l'mplain)

Eiliable I- Same Simite g Il othee (Empialief o

08/779 "

i -

i a

r a s lH)EKET NO. 50-281 ,

UNIT SHilllM)WNS AND FOWEk REplFCilONS IINIINAME surry 7

  • pA1E 09-0 985

" ~" ^ "

REFOR T MOillil Auriu s t . 1985 1EI.ErilONE (8041357-31 R 4 .

"t.

g 5, E $ $ l.ltensee {4, *L Cause A Connective Event g3 Arthni su N". . Date Q n$ i m s cc hevent Recessence F $$ k jg Rerint # *> t i j

~

85-5 98-02-85 s 0.0 II Unit was reduced to 70% power, 600MW's to allow removal and return to service of "2A" polisher.

85-6 08-13-85 F O.0 A Turbine runback to 59% power 390MW's, caused by NIS dropped rod signal from

,e Channel I due to a loss of vital bus I which was lost because of a loss of 2 Ill-bus. Cause of bus loss has not been determined.

3 4 I 2 Metlinit: Exhibit G. instaurthms F: Einscil Ressem:

l Manuel Ine roepsistion of Dass 5: St hriluled A E gulpment I silure (Emplain) Entry Sheets for 1.icensee 2 Manual Sessm.

R. Maintenance or Test Event Repost (l.ER) Elle IllUiti G.

C-ReIwelbig 3-Anlummele Seism.

44Hhes (Emplaint 01(.8 )

D Reguistoiy Restilcolon E4)pessene Tosining A license Essailanthm 5 m

F-Admiinkessolve Ethibit 1 -Same Source $O G.Opessekmal E sus (Eapisin)

II Ollies (E splain) u l'8/11) t

Page5 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 1 MONTH: Aueunt. 1985 DATE TI!E HOURS LOAD, %' REDUCTIONS, %' 5'M REASON None during this reporting period.

O I

i

)

MO:.THLY TOTAL e e +4 '.<MW m= - -e s oe w ~ '

e o -m m se a mon. m s,e o ,

~

  • Page 6 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.2 MONTH: August, 1985 i

DATE TIME HOURS LOAD E' REDUCTIONS E' 5'H REASON None during this reportin.g period.

e e

9 MONTHLY TOTAL

- we a+ m e*

P

  • I l

l r%

O *

  • cn a -

CL VtPtn A wf uabF nalt V Onl y PowFR LFyrt sonRv power 51AlluN RtPORIING MuralH - AttbOS I 198S 00( AF I NO. 50-780 DGLubi Pio 50-291 CATO *Uf.tr I. '98S

, (UM PL E f t 0 R E Vi J"t4~5 0N I I ON9 oNJi i w 0 AvFhauf DAILY POWtB ttvEt a vf M A6( DAILY Fu.[6 I E v 0' DAT -MWE-NFI= -MWb-hil i F45.6 736s?

l 2 754 1 71941 l 3 751 3 797s9

  • 635 4 719.0 S  ;.u 7$6.9 6 00 7 50. m 7 a.u 7 0.6 a c.u 750.6 4 00 732.*6 14 J.O 7u9.2 lt 00 74C.)

12 00 744.9 Is u.0 4%e.4 1% s.J 7.3 %. R l> u.o 7%6.9 to w.J 7%9.5

?F u.J 7S*.O in u.u 761.8 19 u.u 75549

7. u.O 741 6 2a J.0 753.4 72 819.6 TSAs4

?t 169 1 FS3/3

?% 215.6 7S3 3

?> 4al.1 7>4s0 20 012 9 7 642

?F 677.9 F%%9 FM 778. T F >lso

?# F3S.4 747.5 9u 750 7 747.*

11 F53 2 75040

'

  • Page 8 l i l

SUMMARY

OF OPERATING EXPERIENCE MONTH / YEAR AUGUST,1985 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT 1 08-01-85 0000 This reporting period begins with the unit at 100 % ,

power, 790 MW's.

08-04-85 2020 Reactor trip, caused by RCS loop "A" low flow signal to reactor trip circuitry. The signal was caused by operator bumping flow sensing lines in loop room. ,

08-05-85 0552 Reactor critical 08-06-85 0311 Reactor shutdown. Taking unit to cold shutdown for reptar of 1-SI-243.

0748 Commenced plant cooldown ,

1940 RCS < 3500F/450 psig 08-07-85 0555 RCS < 2000F 08-10-85 1235 RCS at mid-nozzle n 08-12-85 0705 Commenced RCS fill and vent .

08-16-85 1030 Completed RCS fill and vent

)

08-19-85 0748 RCS > 2000F 1900 RCS > 3500F/450 psig 08-20-85 2209 Reactor critical 2230 Holding power at 2% for secondary chemistry 08-22-85 0428 Generator on the une 0510. Holding power at 30%,165 MW's for secondary chemistry.

08-24-85 1313 Commenced power increase at 3%/hr.

1617 Holding power at 41%,285 MW's for system operator.

08-25-85 0700 Commenced power increase at 5%/hr.

1345 Holding power at 70%, 525 MW's for flux mapping and excore calibration.

08-26-85 0445 Commenced power increase at 5%/hr.

0750 Holding power at 85%, 670 MW's for high polishing building differential pressure

7 Pcge 9

SUMMARY

OF OPERATING EXPERIENCE MONTil/ YEAR AUGUST,1985 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT I (Continued) 1624 Commenced power increase at 5%/hr.

1736 Holding power at 90%,720 MW's for high polishing building dif ferential pressure.

08-27-85 2218 Commenced power increase at 5%/hr.

08-28-85 0100 Unit at 100%,775 MW's 1726 Reducing power for waterbox cleaning 1800 Holding power at 92%,710 MW's 1903 Corr.menced power increase at 5%/hr.

2034 Unit at 100% power,790 MW's 08-31-85 2400 This reporting period ends with the unit at 100% power,790 MW's

Page 10

SUMMARY

OF OPERATING EXPERIENCE MONTII/ YEAR AUGUST,1985 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT 2 08-01-85 0000 This reporting period begins with the unit at 99% power,770 MW's holding due to OTATChannelI setpoint 08-02-85 2315 Commenced power reduction to allow removal and return to service of "2A" polisher 08-03-85 0217 Holding power at 76%,600 MW's 0445 Commenced power increase at 150 MW/hr.

0719 Unit at 100%,785 MW's 0233 Commenced power reduction to repair 2-SD-P-2B 0241 Holding power at 96%,760 MW's 08-05-85 0702 Commenced power increase at 150 MW/hr.

0900 Unit at 100% power,785 MW's 08-09-85 2150 Commenced power reduction to allow removal of " A" water box for cleaning 2320 Holding power at 81%,620 MW's 08-10-85 0330 Commenced power increase at 150 MW/hr 1015 Holding power at 99%,790 MW's, due to OTa'"Channell eunback alarm.

08-12-85 1815 Unit at 100%,785 MW's 08-13-85 0116 Turbine runback to 59% power,390 MW's following loss of 480V Emerg. Bus. MCC 0200 Power reduced to 50%,305 MW's, due to condenser vacuum problems 1520 Commenced power increase at 150 MW/hr 2125 Unit at 100% power,790 MW's 08-31-85 2400 This reporting period ends with the unit at 100% power,790MW's

j * *

  • 5
  • Page 11 AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS I f i

t None During This Reporting Period I

I {

L I

e h I I

l f

i .

1 i

.J i

I

,i 1

h i

d i

s e

/

e J

t t

4

.=. - _- -. -- - - - - - - . - .. - - .. _ .,.- . - . - _ ...... - . . ,. . - - , ., - . - ,-,

Page 12 FACILITY CilANGES REQUIRING NRC APPROVAL None during this reporting period.

s -

Page 13 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL DC 84-64 Appendix R Main Steam Valve Modification Unit 1

[

This design change installed a dedicated shutdown system for the Main Steam Isolation Valves (MSIV) that win operate independent of the existing MSIV trip system. This will provide an alternate means of operation in the event of a fire in the Control Room or in the Emergency Swithchgear Room as required by 10CFR50, Appendix R.  ;

A design modification to the Power Operated Atmospheric Relief Valves (POARV) installed a Z-position signal isolating control switch in the analog control instrument line from the process racks to each of the electro-pneumatic transducers. This provides two means of preventing spurious opening of the POARV's caused by a fire in the Control Room or Emergency Switchgear Room.

l Summary of Safety Analysis The modification enhances the ability of the operator to maintain steam generator inventory by ensuring positive control of the MSIV's and Steam Generator POARV's in the event of a fire in the Control Room or Emergency Swithgear Room.

DC 84-74 Fuel Pool Transfer Canal Door Storage Rack Unit 2 This design change installed a Unit 2 transfer canal gate storage rack to eliminate the need to transfer the gate over spent fuel storage locations. This will allow the use of the ninety storage locations for core off-loading and fuel shuffling.

Summary of Safety Analysis The modification will not affect any safety related equipment. The UFSAR will be revised to reflect the addition of the Unit 2 canal gate storage rack.

DC 81-114 Charging Pump Component Cooling Water Pump Motor Replacement Unit 1&2 This design change replaced the four charging pump component cooling (CCW) pump motors with motors that are Class IE, environmentally qualified. The pumps were also replaced. With a new pump-motor unit, seismic qualification was performed by the vendor. This assured compliance with IEEE 344-1975. Piping modifications were made upstream and downstream of the charging pump CCW pumps to reduce stress at the pressure indicating gauges and to allow for installation of temperature measurement for the charging pump cooling system.

Summary of Safety Analysis The piping modifications and the replacement of the charginig pump CCW pump and motors does not affect station operators or the operation of safety related equipment.

Operation of the system will remain unchanged. The charging pump's mechanical seal heat exchangers will continue to receive the required amount of cooling flow.

)

l l

l t

i i

Page 14 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL 1

DC84-08 Appendix R Power Source Unit 1 & 2 This design change provides an Appendix R Power Source for certain instrumentation at the Remote Monitoring Panels in the Cable Tray Room following a fire in the Control Room, Cable Tunnel, or Cable Vault Emergency Switchgear Rooms.

i Summary of Safety Analysis The modification links the operation of instruments required .by Appendix R to the Emergency Power Supply of the other unit. It enhances the availability of reactor parameter indication in the event of a fire.

1 a

4 4

i l,

l l

l l

l l

l l

l

Page 15 OTHER CHANGES, TESTS AND EXPERIMENTS None During This Reporting Period TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL NONE THIS REPORTING PERIOD.

TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL NONE DURING THIS REPORTING PERIOD.

1

'l 1

.- ~ .+-em -- ~ e- ,~--w-w> .+.. - n..m-. .e- s.-- -

w- _._ , y - ,- - - - - - - 7,-, gw9 , g-,ep=. , ,,gy9,..wwy,-g.,9 e--w- w...w, -e ay,-e- ++-rrewev e.w w e tie ry *mypg ee +9

.- P3; 2E-06 v1333.-g pga Page 16 SUE.:G* PG:ER STAT.ICC CF3IIS"'F.Y FIPCM August 1985 LIT 10. 1 C';IT 10. 2 ATLYSIS MD3*E .G31E AERAGE I'R SIN MIIG LE AMGE Gross Radioact., uCi/ml 1.43 3.29E-2 3.90E-1 1. ~4 9F-1 5.12E-2 8.60E-2 Sustended Solids, c:rn 0.0 0.0 0.0 0.0 0.0 0.0 Gross Tritiun, uCi/ml 5.74E-2 2.01E-2 4.01E-2 2.32E-1 1.74E-1 2.00E-1 131 1.44 1.97E-3 3.35E-1 6.09E-4 1.14E-4 1.73E-4 Icdine , ucif=1 131 j7 131 0.80 0.18 I 0.48 N/A(3) N/A(3) N/A(3)

Hvdrocen, ec/ke 41.1 3.1(1) 13.0(1) 40.8 27.5 31.7 _.

Lithiun, =:rn 1.74 0.83 1.20 1.58 1.31 1.44 Soron-10, :rr.* 350 93 188 175 154 162

oxveen, (D.o. ) , ==n 2.000(2) 0.005 0.218(2) 0.005 0.005 0.005 1

4 Chloride, c n 0.010 0.010 0.010 0.010 0.010 0.010 aH @ 25*C 6.84 5.50 6.04 6.67 6.12 6.28

  • Ecron-10 = Total B0ron x 0.196
egrs
Unit 1: Cat Bed placed in service on 8/3, and 8/27 for LiOH renoval. LiOH added on 8/4, 8/5, 8/17, 8/20, 8/21, and 8/23 for a total of 3900 gms. (1) Iow Hydrocen l concentration on mini = = and average values due to unit being shut down for maintenance frcxn 8/4 to 8/21. (2) High Oxygen content on max 2 nun and average values is also due to Unit 1 being shutdown. Unit 2: Cat Bed placed in service on 8/20 and 8/29 for LiOH removal. There were no LiOH additions made to Unit 2 in August. (3) There are no values 33 because I 131 I

for /I was not sho.'ing un: values recorded for I l31 were based on minimum detectable concentrations. I /I133 ratio would not be accurate: tests are being conducted to eliminate the eroblem.

, _ _ . _ - _ . . . _ .._., .. _ _ _ . _ - - - _ . - _ . . . _ . - - _ - - - _ . ~ _ - - - - . _ - ..- ._ _ . . . _ - . _ _

4 DESCRIPTION OF ALL INSTANCES WHERE Page 17 THERMAL DISCHARGE LIMITS WERE EXCEEDED None During This Reporting Period.

j E

5 t

a 4

4 4

I 1

F e

b i

l.

. _ , . - _ . . -. . _ . . . . . _ ~ . . . ., , . . . . ._ _ . . . . . _ _ . , , _

. - . . ._. .- , - ,._. .,__, _ , - . , . , , .,, ,n...,._,.,-,,. ,, . , , . , , , , . _ , - , , _ - , , - , . , . , , - , , , , . , - , , . . , _ , - , , , , , .

Page 18 FUEL HANDLINO I UNIT 4 1 DATE NO. OF ANSI NO. NEW OR SPENT FUEL SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL i

None during this period l 1

e e

Page 19 FUEL HANDLING UNIT $ 2 DATE NO. OF ,

ANSI NO. NEW OR SPENT FUEL SEIPPE0/ RECEIVED ASSEMSLIES PFR SHIPMENT INITIAL ENRICEMENT SHIPPING CASK ACTIVITY LEVEI.

08-06-85 3 LM-02JM/3.11 < Smr/hr 08-06-85 3 LM0 423/2.91 < Smr/hr 08-06-85 3 LM0 413/2.91 < Smr/hr 08-20-85 3 LMO 2JV/3.ll < 5mr/nr 08-20-85 3 LM0 40H/2.91 < Smr/hr 08-20-85 , 3 LM0 42D/2.91 < Smr/hr

, , , , .6.- - ee + = = - - =m-*we=>ew=* .-% - e e-- --e -,w- --e.w,,

- . . - -m. -r- m-9

%_ u - g

Page 20 PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR 1

None During This Reporting Period.

1 4

i I

1 h

'I i

i 4

9 W

J i

i t

l t

I l.

O e

i.

l I

r

, . . ~ . . , . . ._.... . . . . _ _ _ _ . - . _ _ _ , . . _ _

- - Page 21 DESCRIPTION OF PERIODIC TESTS WillCH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS None During This Reporting Period, e

\

e -ea e . -- = e.e em eomme m m*-~- =

, . .p. ,s e.

- - _ , -~. .. . . _.- , _ .. .r, _ , . _ . . . , , _ - t-., w ,,, . . _, _. . . - ., _. , . - , - . .

Page 22 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS l UNIT NO.1 I

The below listed codes denotes the following departments:

0228 or R03 - Mechanical i

1 0229 or R04 - Electrical 0237 or T22 - Instruments 1

l i,

T t

.. _ _ . . . . . . _ . . . , . . . . - . . _ . . _ . . _ - _ _ . . . . , . . __ , , - ~ . . _ _ . . _ _ _ _

VEfC0 SAFETY RELATED DURING REDUCED F0WER SORTED BY UNIT AND DEPARTMENT PROGRAM WPT09860 09/06/85 9:03 PAGE 23

- - FROM 08/04/85 TEU 08/24/85 (NIT 01 SERY RETENED TO WO KPT SERVICE MARK NUMBER HUMBER WO TITLE HISTORY

SUMMARY

0237 08/05/05 01-HI - -32 022679 INVESTIGATE LOSS OF DETECTOR ADJUSTED LOSS OF DETECTOR VOLTAGE BISTABLE. DRAWER OP SAT.PERFORED PT 1 1 0237 08/05/85 01-NI - -35 022678 ADJUST GAMMA COMP ADJUSTED COMPENSATION VOLTAGE.

IRAWER OP SAT. FERFORMED PT 1.1 0237 08/05/85 01-MI - -36 022677 ADJUST GAMMA C0tfENSATION ADJUSTED CO EENSATION VOLTAGE OP SAT. PERFORED PI 1.1 0237 08/12/85 01-CM -VTB 3 023158 PANEL SHOWS SIGNS OF POSSIBLE INSPECTED INTERNALS OF PANEL /NO SIGNS OF ANY ARCING. TERE IS SOE ARCHING: INSPECT FOR CAUSE DImmATION ON TE PM M 0228 08/05/05 01-CC -E -1A 022369 EAT EXCHANGER HAS TUBE LEAK . OFENED LARGE AND SMAll MANWAYS, FRESSLEIZED SHELL FOUND 5 TO 6 TUKS LEAKING PLUGGED SIX TUBES INSTALLED 3 ZINC PLATES IN EACH END CLOSED MANWAYS TOROUED 280 FT LBS 0228 08/05/85 01-SW -FCV -101C 022347 VERIFY PROPER OPERATION OF CECKED VALVE FOR FROPER OPERATION VALVE SAT 0228 08/08/85 01-DA -TV -100B 022957 REGILATOR TO SOV IS BLOWING , CECKED REGLLATOR. NO PROBLEM NOT PASSING ENOUGH AIR TO STROKEFDLND. AIR ILINING TEO.lGH EXHAUST

  • PORT OF SOV REFERED TO ELECTRICIANS JWFERED SOV AND VALVE CAE OPEN 0228 08/08/85 01-SW -PCV -100C 022456 VALVE IS BOUND UP OVERHAULED VALVE 0228 08/08/85 01-SW -FCV -1000 022797 INSPECT VALVE INTERNALS LOOSEED BODY TO BONNET STUDS.FOUND

.! OUT FROM ENGINEERING THAT THE ATTAC

! HED CERTIFICATION INSPECTION PAPERS WERE ALL THEY PEEDED,WE DIDN'T NEED TO DISASSEMBLE VALVE; REFtACED CAGE

/EPC0 ' SAFETY RELATED DURING REIUCED POWER SORTED BY LNXT AND IEPARTMENT PROGRAM WPT09860 09/06/85 9:03 PAGE 24

. . FROM 08/04/85 TEU 08/24/85 UNIT 01 SURRY RETURNED TO WO DEPT SERVICE MARK NUMBER HUMIER WO TITLE HISTORY

SUMMARY

0228 08/09/85 01-DA -TV -100B 022948 VLV. WILL NOT CYCLE REFLACED SOV ON DA-TV-100B AND TEST ED SAT VERIFIED LIGHTS WERE SAT AND OBSERWD TE VALVE AS IT WAS STROKE D

0228 08/09/85 01-LW - -339 020071 REMOVE CECK VALVE REMOVED VALVE INTERNALS AND STORED IN BAG TAFED TO VALVE PIPING FOR REINSTALLATION 5/28/85 W 078513 WRITTEN TO REINSTALL INTERNALS 0228 08/09/85 01-SW - -332 022959 DISSAMBLE, REPAIR, ASSEMBLE. INSFECTED VALVE 0228 08/10/85 01-RC -PP -NA 023090 INSTALL STANDPIPE BETWEEN INSTALLED STANDPIPE 0220 08/11/85 01-CH -HCV -1310A 022961 INTERMEDIATE POSITION AILUSTED LIMIT SWITCH ARM TIGHTEN IRACKET VALVE CYCLED SAT 0228 08/11/05 01-RC -HCV -1557A 022752 REPACK TIGHTENED PACKING OPERATIONS STROKED VALVE SATISFACTORY 0220 08/11/85 01-RC -HCV -1557C 022753 REPACK TIGHTENED PACKING OPERATIONS STROKE D VALVE SATISFACTORY 0228 08/12/85 01-BD -TV -100F 020021 PACKING LEAK ADJUSTED PACKING WHILE LNIT IS DOWN 0228 08/12/85 01-CC -E -1A 022834 CC TO SW TUBE LEAK REMOVED END PLATE ON DISCHARGE, OFENED MANWAY ON INTAKE CLEANED TUIE SEET FOUND NO LEAKS.MAFED TE SEET CLEAED OFF OLD GASKET.REPLAC ED WITH EW AND CLOSED EAT EXCHANG 0228 08/12/95 01-FW - -40 022542 VALVE IS LEAKING BY APFROX. 2 CUT CrF BAD TWEAIC ON NIPFtE.RETm GPM REPLACE VALVE EADED PIPE NIFftE INSTALLED EW PIP E CAP 3/4" 0228 08/12/85 01-FV -FCV -1498 019600 FEED REG VALVE DOESN'T START ASSISTED INST TECHS IN ADJUSTING VA LVE TESTED SAT MECH.

0228 08/12/85 01-FW -MOV -154B 022887 PM - ON DEMAND PERFORMED PHS 0228 08/12/85 01-MS - -119 019743 PACKING LEAK, BODY TO BONNET LUBRICATE GLAND FMtNER STUDS AND LEAK FURMANITE STEM. TIGHTEN PACKING GLAND FOLLDER AFff<0X 3/4 0F AND INCH VALVE STILL HAS 1/2" 0F FOLLDER LEFT 0228 08/12/85 01-MS -TCV -106A 022695 ICDY TO BOMET LEAK ON BOTTOM REMOVED BOTTOM FLANGE CLEAED FLANGE SLRFACES MACHIED FLANGE SLRFACES CM00TH REINSTALLED FLANGE COVER WITH EW GASKETS 0228 08/12/85 01-RC - -100 022761 REPACK ADJUSTED PACKING WHILE LNIT IS DOWN 0228 08/12/85 01-RC - -55 023087 EXCESSIVE FORCE REQUIRED TO ADalSTED PACKING CLOSE 0220 08/12/85 01-RC - -56 023122 ADJUST PACKING ADJUSTED PACKING 0220 08/12/85 01-RC - -77 022762 REPACK ADJUSTED PACKING WHILE LNIT IS DOWN 0228 08/12/85 01-RC - -95 022760 REPACK ADJUSTED PACKING WHILE UNIT IS DOWN l 0220 08/12/05 01-SI -

-337 012266 PACKING LEAK ADJUSTED PACKING WHILE UNIT IS DOWN 0228 08/12/85 01-SI - -340 012199 PACKING LEAK ADJUSTED PACKING WHILE LNIT IS DOWN l

EkXT SAFETY RELATED DURING REDUCED POWER SORTED BY LNZT AND DEPARTMENT FS:0 GRAM WPT09860 09/06/85 9:03 PAGE 25 FROM 08/04/85 THRU 08/24/85 UNIT 01 SURRY RETURNED TO WO DEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

INIOCTORS (2) 0715541 0229 08/10/85 01-EFti-TX -1J1 022955 CHANGE TAP SETTING FROM TAP 1 CHANGED TAP 8/10/85 CHANGED TAP FROM TAP 1 TO TAP 2 TO OBTAIN TE REQUIRED 4056 V 0229 08/13/85 01-CH -HOV -1275C 022789 INSFECT TOROUE SWITCH SETTING PMS 8/8/85 OBTAINED TORQlE SWITCH SETTINGS 8/8/85 022? 08/13/85 01-eft-IlN III 023027 PM - ON IEMAND INSFECTED AND CLEAED INVERTER 8/10/85 0229 08/13/85 01-RP -RI -D12 022966 ERRATIC INDICATION ON D-12 CHECKED FtuG AT EAD AND FLOORBOX FLUGS AND SOCKETS OK. READINGS TAKEN AFTER RECONNECTING TE PLUGS PRIMARY 40.9 SECONDARY 50.4 0229 08/13/85 01-RP -RI -N-9 013998 ERRATIC INDICATION ON N-9 PRIMARY 40.6 SECONDARY 49.7 SOC-602 FOLND NO PROBLEM WITH READING OF N-9 RPI CHECKED FtuG AT EAD AND FLOOR DOX. READINGS TAKEN AFTER RECONECTING PLUGS PRI 40.8SEC49.8 0229 08/13/85 01-RS -P -1A 016207 LIGHT IS ON WITH FtMP OFF. OFS FERFORMED PT.2 SAT ON 8/9/85 LIGHT OPERATION SAT WEN PUMP WAS RUNNING / LIGHT ENT OF WEN PUMP WAS SKlT DOWN.NO PROBLEM WAS FOUND NO ADESTMENT WAS MADE 0229 08/13/85 01-SI -MOV -1863B 022792 INSPECT TOROUE SWITCH SETTING INSPECTION COMPLETE 0229 08/14/85 01-CW -ROV -100A 022606 PM - AUTO SCHEDULE FERFORMED PMS ON CW-MOV-100A 0229 08/14/85 01-09 -MOV -100B 022607 PM - AUTO SCHEDULE FEFFCRMED PMS 8/11/85 0229 08/14/85 01-DA -TV -100B 022939 ELECT. DISCONNECT /RECOPNECT LIMITS AND SOV REMOVED 8/10/85 ew!TCHES 1F REQUIRED BY MECH. MOLNTED SOV/ LIMITS BUT CulLD NOT CY "A*T

  • CLE VALVE.REIPSTAL1ED STEM SWITCH BECAUSE IT FELL OUT REMOLNTED SOV AND LIMIT SWITCES CYCLED SAT 0229 08/14/85 01-FW -NOV -151D 022962 BKR TRIPPED OFF WHILE CYCLING WORKED WITH OFS AND CYCLED VALVE SAT NO PROBLEMS FOLND.

OPEN 2.5 APFS CLOSED 2.5 APPS 0229 08/15/85 01-CH -BL -1 023159 SOMETIMES DOES NOT START IN CHECKED CONTACT MAKE-UP DN MAKE-lF Auto. MOIE SELECTOR AND MADE LP MODE CONTROL SWITCES.MAKE UP MODE SELEC TOR IN AUTO AND CONTROL SW IN AUTO AFTER START POSITION MUXI RELAY 0229 08/15/85 01-CH -HTT -2A2 013844 HEAT TRACING 2A2 CKT 29 FOUND HOT LEAD TO BE GROUPEFD CKT 29 HAD A SPARE IN THE BOX.I USED IT IN THE CKT. BREAKER IS WORKI NG AND NOT GROUNIED.NEET TO HAVE HEAT TRACING REPLACED CKT 29 27.5

s

.- l JEPbO' SAFETY RELATED DURING REDUCED POWER SORTED BY UNIT AND IEPARTMENT FROGRAM WPT09860 09/06/85 9:11 PAGE 26 FROM 08/13/85 THRU 08/13/85 I UNIT 01 SURRY )

)

RETURED TO WO i IEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

l 0228 08/13/85 01-CH -P -2A 022666 ADJUST IMFELLER CLEARANCE AS REWILD FtJMP ACCORDING MMP-C-G-155 REQUIRED BY OPS.

0228 08/13/85 01-IA -MISC-NA 023149 BAD LEAK WHERE BOTTLE CONECTS DISCONECTED FITTING CLEANED REINSTALLED AND TIGHTEED 0228 08/13/85 01-MS -SOV -102A 022929 SOV-102A HAS AN AIR LEAK AND REPLACED SOLENOID AND REPAIRED AIR IS BLOWING LIE IO N E*E E M IO PROFERLY.FOLMt NO PROBLEM WITH SOV WHILE CHANGING SOV FOUND AIR LINE BROKEN INSIIE FITTING 0228 08/13/83 01-RC -FIC -1492 022759 FLANGE LEAK INSTALLED NEW GASKETS STUDS AND NUT S

0229 08/13/85 01-CH -MOV -1275C 022789 INSPECT TOROUE SWITCH SETTING PMS 8/8/85 OBTAINED TORGE SWITCH SETTINGS 8/8/85 0229 08/13/85 01-EPL-INV III C23027 PM - ON DEMAND INSFECTED AND CLEANED INVERTER 8/10/85 0229 08/13/85 01-RP -RI -D12 022966 ERRATIC INDICATION ON D-12 CECKED PLUG AT EAD AND FLOORBOX FtUGS AND SOCKETS OK. READINGS TAKEN AFTER RECONNECTING TE PLUGS FRIMARY 40.9 SECONDARY 50.4 0229 08/13/85 01-RP -RI -N-9 013998 ETRATIC INDICATION ON N-9 PRIMARY 40.6 SECONDARY 49.7 SOC-602 FOUND NO FROIt.EM WITH READING OF N-9 RPI CHECKED FlVG AT EAD AND FLODR ECX. READINGS TAKEN AFTER RECONNECTING FLUGS PRI 40.8SEC49.8 0229 08/13/85 01-RS -P -1A 016207 LIGHT IS ON WITH FUMP OFF. OPS PERFORMED PT.2 SAT ON 8/9/85 LIGHT OFERATiON SAT WEN Ftw WAS RUNNING / LIGHT WENT OF WEN FtN WAS SHUT DOWN.NO PRCREM WAS FOUND NO ADJUSTENT WAS MADE 0229 08/13/85 01-SI -MOV -1863B 022792 INSFECT TORQUE SWITCH SETTING INSFECTION COMPLETE 0237 08/13/05 01-RS -P -1A 011055 REPAIR ANNUNCIATOR A-E-7 LIFTED LIAD TO CLEAR ALARM ENTERED IN JUMPER LOG AND BLUE TAGGED 1/9/85 SET ALARM ON 1-RS-P-1A.

RETURNED LIFTED LEAIG TO NORMAL AND CLEARED JUMPER LOG

EPCO' SAFETY RELATED DURING REDUCED POWER SORTED BY UN8T AND DEPARTMENT PROGRAM WPT09860 09/06/85 9:03 PAGE 27 FROM 08/04/85 THRU 08/24/85 UNIT 01 SURRY RETURNED TO WO IEPT SERVICE MMK NUMBER NUMIER WO TITLE HISTORY

SUMMARY

0228 08/12/85 01-SI - -341 012253 PACKING LEAK ADJUSTED PACKING WHILE UNIT IS DOWN 0228 08/13/85 01-CH -P -2A 022646 ADJUST IMFELLER CLEARANCE AS REI4JILD FilMP ACCORDING MM-C-G-155 REQUIRED BY OPS.

0228 08/13/85 01-IA -MISC-NA 023149 BAD LEAK WERE BOTTLE CONNECTS DISCONNECTED FITTING CLEANED REINSTALLED MD TIGHTENED 0228 08/13/85 01-MS -SOV -102A 022929 SOV-102A HAS AN AIR LEAK AND REFtACED SOLEh0ID AND REPAIED AIR IS BLOWIN3 LINE TO VALVE. VALVE OPERATED FROFERLY.FOUND NO FROBLEM WITH SOV WHILE CHANGING SOV FOUND AIR LINE BROKEN INSIDE FITTING 0228 08/13/85 01-RC -FIC -1492 022759 FLANGE LEAK INSTALLED NEW GASKETS STUDS AND NUT S

0228 08/14/85 01-FW - -43 022921 0 FEN CECK WV. , INSPECT CHECK REMOVED STRONG BACK FROM VALVE VALVE INTERNALS 8/9/85 GOJND SEAL M M DIAFtEAG H OF 1-FW-43.CLEMED SURFACE FOR FIT UP OF NEW DIAFHWiM. FIT AND nELDED EW DIAPEAGM.NIE PT AND OC 0228 08/14/85 01-MS -SOV -101AB 023203 ASSIST AD-OPS TESTED 1-MS-90V-101 A B NO FROBLEM FOUND WITH SOV TESTED SAT,NO ACTUAL WORK FERFORED OH VALVE 8/14/85 0228 08/15/85 01-CC -E -1A 023230 DLET MANWAY LEAKINC OFOED MANWAY CLEAED GASKET SLRFACES,PUT RTV ON SLRFACES AS FER GLEN N00RE AND INSTALLED 0-RING CLOSED MANWAY 0228 08/15/85 01-FP -P -2 019906 RADIATOR CAP HAS ONE LOCKING INSTALLED NEW CAP 0228 08/15/85 01-FP -P -2 023268 ADJUST Tm0TTLE LINKAGE ON ADJUSTED TWOTTLE LINKAGE TO 1750 FFM ON DIESEL 0228 08/15/85 01-FW - -12 022920 OPEN CHECK VLV , INSPECT INTER- OPEN CECK VALVE. INSPECT CHECK NALs VALVE.CLOSE CECK VALVE AND TORalE TP 590 FT/LBS.NO REAIRS hERE MADE ON VALVE AT ALL NO PARTS ARE IN STOCK AT THIS TIME. TIGHTEN TWO BOLT 0228 08/15/85 01-fW -MOV -151A 022994 PM - ON IEMAND PMS CECKED GREASE AND PACKING 0228 08/15/85 01-FW -MOV -151B 022893 PM - ON IEMAND PMS CHECKED GREASE AND PACKING 0228 08/15/85 01-FW -MOV -151C 022892 FM - DN DEMAND Pets -CECKED GREASE AND PACKING 0228 08/15/85 01-FW -MOV -151D 022891 PM - ON IEMAND PMS-CECKED GREASE AND PACKING 0228 08/15/05 01-FW -HOV -151E 022890 PM - ON DEMAND PMS-CECKED GREASE AND PACKING 0228 08/15/85 01-FW -HOV -151F 022889 PM - ON DEMAND PMS CECKED GREASE AND PACKING 0228 08/15/85 01-IA -MISC-NA 023204 HP AIR BOTTLE ON FAR RIGHT DISASSEMBLED FITTING CLEMED REINST ALLED AND TIGHTEED 0228 08/15/85 01-IA -PP -HA 023205 PIPING DOWNSTREAM OF 1-IA-981 TIGHTENED CONNECTION 0228 08/15/85 01-MS -MOV -101A 022878 PM - ON DEMAND FttS INSFECTED GREASE MD PACKING 0228 06/15/85 01-MS -SOV -101AA 023202 ASSIST AD-OPS TESTED 1-MS-SOV-101AA NO PROBLEM WITH SOV TESTED SAT CHECKED VALVE STICKING FREVENTING MS-TV-101A FROM EMERGENCY CLOSE FUNCTION CLEARED CECK VALVE AND TESTED OPERATION

--r- .-

/EFk0' RELATED DUR2NG REDUCED FOWER SORTED BY UNIT AND DEPARTMENT PROGRAM WPT09860 09/06/85 9:03 FAGE 28 FROM 08/04/85 THRU 08/24/85 UNIT 01 SURRY RETURNED TO WO IEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

0229 08/15/85 01-EFH-REL -1JUV 004007 REPLACE PLC CARD REPLACED FtC CARD IN RELAY 62A/1J2 OPERATIONAL CECKED FC NO-54-11651 PART ND 4604850 0229 08/15/85 01-EFH-REL -15H3A 019430 PERFORM ENP-P-RT-50 FGFORED A FUNCTIONAL CECKOUT OF TE 1H UNDER VOLTAGE CKT. TO FROVE WS REPLACED AS FG WO'S 3800007649 AND 3800007651 0229 08/15/85 01-EPH-REL -15J3A 019429 FG FORM EMP-P-RT-52 PERFORMED FUNCTIONAL CECK0UT OF TE 1J UNDER VOLTAGE CKT.TO FROVE WA'S REFLACED AS PER WO"S 38 0007685 AND 380007686 TIED RELAY 62A/1J2 AFTER CARD REPLACED PER WO 0229 08/16/85 01-CW -MOV -100C 022600 PM - AUTO SCHEDULE COMFLETED FROCEIORE LP TO STEP 5.8 UNABLE TO CYCLE AND TAKE LOAD CK KCAUSE OF CONDENSER CLEANING 8/14/85. CYCLED VALVE 8/16/85 0229 08/16/85 01-MS -MOV -101A 022863 FM - DN IEMAND COMFtETED PMS VALVE OFGATED SAT 0229 08/16/85 01-RP -BKR -PAEL 021123 { g g C (B0gTAGS ON REFtACED BOE TAGS 8/16/85 0229 08/17/85 01-CW -MOV -100D 022609 PM - AUTO SCEDULE COMFLETED PROCEIORE LP TO STEP 5.8 UNABLE TO CYCLE AND TAKE LOAD CK BECAUSE OF CONDENSER CLEANING.

FGFORED LOAD CECK COMFtETED PMS FROCEDLRE 8/17/85 0229 08/19/85 01-EFH-BKR -15B7 007392 EMP-P-RT-107 FROTECTIVE RELAY MEGGERED RELAY TESTED AS PER PROCFD tRE EW-P-RT-107.0PERATIONAL CECK COULD NOT BE COWLETED ON 10-10-84 BECAUSE WA WAS NOT AVAILABLE CIRCUIT WAS OPS CECKED AS FG 0229 08/19/85 01-MS -MOV -101C 022861 PM - ON DEMAND PERFORMED PROCEDURE MS-MOV-E/A1 VALVE CYCLED SAT 8/16/85 0229 08/19/85 01-RC -P -1A 023345 ADD OIL TO RCP ADIED OIL TO LOWER OIL FOT.ADDED MFROX 3 GAL TO TOP OIL FOT. RAISED LOWER SWITCH AFP 11/4" TO BRING IN OIL LEVEL ALARM. LOWER IT TO ITS ORIGINAL POSITION AND ALARM CLEARED 0229 08/19/85 01-RC -P -1B 021181 OIL PRESSURE SWITCH INOP, REFtACED OIL PRESSLRE SWITCH 8/16/

REPLACE TE CONTACTS FOR TE WITE LIGHT IN l

CONTROL ROOM WILL NOT CLOSE NOR TE CONTACTS 463 FOR STARTING CIRCUIT BOTH CONTACTS ARE IN TE PRESS SOV 0229 08/19/85 01-RC -PCV -1455C 019577 CECK LIMIT SWITCES3 INT. REMOVED LIMIT SWITCES AND LIMIT SWITCH MOUNTING PLATE 8/9/85 REFLACED LIMIT SWITCES AND LIMIT SWITCH MOUNTING PLATE.ADESTED LIMITS TO SUIT OPS LIGHTS OP SAT 0229 08/19/85 01-RC -PCV -1456 023269 SOLEN 0ID STICKS MECHANICS CLEANED UP STEM AND LUBRICATED RAN 6 TIMES EVERTHING SAT 9/15/85. SOLEN 01D WAS NOT STUCK, PORV STEM WAS STICKING 0229 08/19/83 01-RP -BKR -A-BYP 022786 PM - ON DEMAND FtiS FTFORMED TO STEP 5.25 8/11/85 BREANER TESTED SAT 8/18/85 COUNTER FEADING AFTER MAINT: 997B2 l

TEF50' 5AFETY RELATED W RING REDUCED POWER SORTED BY UNIT AND DEPARTMENT Ff<0 GRAM WPT09860 09/06/85 9:03 PAGE 29 FROM 08/04/85 TEU 08/24/85 UNIT 01 SURRY RETlRNED TO WO 4 EPT SERVICE MARK NUMBER NUMER WO TITLE HISTORY

SUMMARY

CAUSED BY EAT COMING FROM TE

] ISOLATION XFPR BY VB PAEL 1-3 0237 08/12/85 01-EE -EDG -1 020325 FLEL TRANSFER ALARM FOR 41 INVESTIGATED F0lMD NO PROBLEM WITH FLEL TRANSFER Ptw OPERATION FROM DAY TAE BSAE TAE ALARM SET POINTS

/ LEVEL SWITCH SET POINTS OK 4

0237 08/12/05 01-EE -ETR-100 021469 TACH 0ETER LNtELIABLE WILE CECKED TACH 0ETER WILE PT-223A i SYNC ON LINE WILL ORIFT FROM FERFmED ON 8/9/05 NO PRORDtS 600 RPM TO 850 RPM. SEDi WILE @DtATIPE 8/9/85 0237 08/12/85 01-FP -CIL -NA 009063 EWR 84-322 CONST SITE JOB, TO FOAMING ALL TRAYS THAT ARE RELATED MEET REQUIREMENTS TO THIS EW COVERAE BY QC AND

, IS WORK ORIER FOR FOAMING THIS CARE TRAYS 0237 08/13/05 01-RS -P -1A 011055 REPAIR ANNUNCIATOR H -7 LIFTED LEAD TO CLEAR ALARM ENTERED IN JUMPER LOG AND BLLE TAGGED 1/9/85 SET ALARM ON 1-RS-P-1A.

RETWNED LIFTED LEADS TO N(RMAL AND CLEARED # FER LOG 0237 08/15/85 01-FV -FCV -1498 021684 RENCER DIAFtRAGM LEAKS AIR REPLACED AIR SET REGLLAT(R P967AFR 0237 08/15/95 01-FW -FCV -478 022725 BOTTOM LOCKNUT ON TIE ROD FOR PERFORED IPF-C-FV-89 USED TO FEEO BAOK ARM TO CONTROLLER IS REINSTALL STAR LOCK WAS E STR M MISSING VALVE TO VERIFY PRTER (FERATION

, CECKED ALL 3 VALVES FOR WASERS AN i

D NUTS 0237 08/15/95 01-FW -LT -1497 022721 CALIBRATE, DOES NOT RESPOND TO LEVEL IS TRACKING. EVIDENT WEN y

LEVEL CHAusES SHUTTING DO W LOOP CP SAT l 0237 08/15/95 01-GW -RM -130-1 022251 DRAIN WATER & DRY OUT IRIED MONITOR REMOVED GAS CHAMER AND DRIED SAE.RAN SYSTEM TO VERIFY FLOW. FLOW METER AND Ptw BAD FROM WATER IEILTRATION. REPLACED PLMP AND FLOW METER OPERATION SAT 0237 08/15/85 01-IA -REG -991 023211 DOWSTREAM PRESSLRE GAUGE LEAK ENT AND TIGHTEED SWAGELOK FITTING ING AROUNO COPNECTION TO REGU- S TB SNM. CN SAT.

LATOR 0237 08/15/85 01-HI -ALM -41 018183 AVERAGE FLUX DEVIATION ALARM REFtACED T401 IN COMPARATOR AND RATE IRAWER PERFORED CAL 050 TO PROVE Ff<0FER OPERATION OF BISTABLE BISTABLE IRIVER TRANSFORER BX5297A

0237 08/15/95 01-RC -LI -459A 017092 LEVEL INDICATCR READING >100% REPAIRER EAKS ON TRANSMITTER.ALSO i

CAL.TE 78tANSMITTER. INSTALLED FILLED A.3) VENTED i

0237 08/15/95 01-RM -RR -175 022548 REEW IE PADS REPLACED I E PADS CK SAT 0237 08/15/85 01-RPI-ROD -K-6 022528 P-250 FOINT #C0032A CONTROL CECKED ROD POSITION INDICATION'i OP SAT 0237 08/16/05 01-HI -DETR-35 019638 FAILED TO TRIP BISTABLE WEN INSTALLED EW SETPOINTS VIA SETPOIN IT SHOULD HAVE AS POWER WAS IN- T CHANGE 85-16.PROCEDLRE ALREADY CREASED. -

SENT 6-6-85 PT SENT TO ENGIEERING s

0237 08/16/05 01-NI -DETR-36 019639 FAILED TO TRIP BISTABLE WHEN INSTALLED NEW SETPOINTS VIA SETPOIN IT SHOULO HAVE AS POWER WAS IN- T CHANGE 85.16 PROCEILRE SET ON CREASED. 6-6-85 PT SENT TO ENGIEERING 0237 08/19/85 01-CC -PS -102 023095 PRESSURE SWITCH DOES NOT CAUSE FOUND PRES 9)RE SWITCH ISOLATED RETU LOW PRESSURE. RNED TO SERVICE AND TESTED FUNCTION OF SWITCH BY TlRNING OFF PLMPS i

--i,-- - . , - -. -

. _ . . , . . . . . , , _ _ , . - . ,_--.,.,m_. , ,..,,..,y _.,..n,y,m.w.. , ,,.....---,-.--%_..

EFhd $ffETY RELATED DLRING REDUCED FOWER SORTD BY UNIT AND DEPfATHENT FROGRAM WPT09860 09/06/85 9:03 FAGE 30 FROM 08/04/85 THRU 08/24/85 UNIT 01 SURRY R Mc TO WO IEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

0228 08/15/85 01-RC -FCV -1455C 022980 TWO AIR LEAKS AT SWEDELOK FOUND 2 LEAKY FITTINGS TIGHTENED FITTINGS STOPFE LEAKS 0228 08/16/85 01-FC -P -2A 015848 SUCTION STRAINERS GASKET LEAKS REMOVED STRAIER CAP CLEANED GASKET SURFACE INSTALLED EW GASKET.

0228 08/16/85 01-RC -PCV -1456 023224 FMS AIR LEAK AT DIAPEAM REMOVED DIAPEAGM,NO EW OE AVAILA BLE, INSPECTED OLD DE,IT LOOKED 000 D, INSTALLED OLD DIAP E AGM, TESTED F0 R LEAKS,FOUND NO LEAKS FROM DIAPHRA GM BUT SOLENOID SEDtS TO BE F4JNG UP 0228 08/16/85 01-RC -FCV -1456 023278 LOCATE AND REPAIR AIR LEAKS LEAK ON LOW PRESSURE GAGE ON REDUCER TIGHTENED. LEAK ON SERIES OF FITTINGS BETWEEN REDUCER AND VALVE.TIGHTEED. NO OTER LEAKS FOU ND.NO LEAKAGE 0228 08/17/85 01-BS -PN -HA 023353 INNER DOOR DRIFTS OPEN AND PRE CECKED OIL LEVEL AND BLED AIR VENTS OPENING OUTER DOOR. FROM EXHAUST SIDE OF TE PISTON.

(OPS IS TO TEST AND GET BACK TO US) 0228 08/19/85 01-CC -E -1B 001114 OPEN MANWAY+ CLEAN HEAT VOID C0lM.ETED ON SERVICE REGLEST 8/19/85 0228 08/19/85 01-CH -P -1A 023222 'A' CHG FtJMP AUX OIL FtJMP, PWR DRAIED GEAR CASE. RERACED FUMP REFtACED DIL IN CASE.CLEAED UP AREA 0228 08/19/85 01-DA - -40 023382 VALVE DOES NOT OPEN FULLY, DIS- REMOVED Q.D BONET AND DIAPWAGM ASSEMBLE AND REPAIR A@ INSTM EW OE M TM BONET AS FROCEIEE REGUIRED 0223 05/19/85 01-DA -TV -1003 022737 VLV NORMALLY FAILS P.T.16.4 AT DISASSEMBLE Vf4VE AND REPLACE PLUG, EACH CSD OF PLANT STEM, SEAT 0228 08/19/85 01-FW - -42 023315 LEAKS BY SEAT FtJT CAP ON IT INSTALLED PIPE CAP 0228 08/19/05 01-FW - -7 0?2541 VALVE HAS A BODY TO BONNET AND REFtACED VALVE. 8/11/85 NEW VALVE A PACKING LEAK. INSTmTION N IK 1",00 CLAPP SEAL SIZE 3/4" FIG 12G2 BODYYOKE A-105 858 DEGREES F ANSI 2155 STEM CR13 WOG 5320 PSI SEAT-BACKSEAT 0228 08/19/85 01-MS -MOV -101C 023033 PM - ON DEMMD USING 3/4" ALLEN WRENCH REMOVED INS FECTION PLUG FtJLLED HOUSING COVER U SING 1" COMB WRENCH-REMOVED TOROUE COVER WITH 1 3/16 SOCKET REMOVED TORQJE IRIVE SLEEPER USING 3/4 0228 08/19/85 01-MS -NRV -101A 011564 FURMANITED, RETURN TO ORIGINAL REPACKED 1-MS-m V-101A BY Mff-C-G-1 56 GEERAL VALVE PROCEDLRE INSTALLE D EW JUP0( RING 0228 08/19/85 01-MS -SOV -102A~ 023366 UALVE HAS DIAPEAGM LEAK WERE TIGHTEN UP AIR OPERATOR SOV BOLTS TO VALVE 0228 08/19/85 01-RC -HCV -1556B 022754 REPACK TIGHTENED PACKING 0228 08/19/85 01-RC -PCV -1455C 022836 VALVE LEAKS BY AT 360PSIG REMOVED VALVE FROM SYSTEM 8/11/85 LAPFED VAGE TO FLUG, ACHIEVED 100%

BLUING REASSEMBLED VALVE WITH NEW GASKETS TORQUED VALVE 8/12/85 8/14/85

SUMMARY

.FOUND PLUG ON 0228 08/19/85 01-SI - -241 023354 BODY TO BONNET LEAK OF ~1 DROP RE-TOROUE TO 845 FT LBS CHECK VALVE PER SECOND WITH RCS AT 300 PSI STILL HAS SMALL LEAK, ONE DROP EVERY 3 SEC 0228 08/19/85 01-SW -MOV -104A 022588 PM - AUTO SCHEDULE CHECKED GREASE AND PACKING FILLED WITH EP-1

VEFb $AFETY RELATED TAJRING PIDUCED POWER SORTED BY UNIT AND DEPARTMENT PROGRAM WPT09860 09/06/85 9:03 PAGE 31 FROM 08/00/85 THRU 08/24/85 UNIT 01 SURRY PITURNED TO WO DEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

0229 08/19/85 01-RP -BKR -ANORM 022785 PM - ON DEMND FC-BD-E/A1 C0& LETE UP TO STEP 5.25

.1 HAD TO STOP AT STEP 5.25.1 0F FC-DB-E/A1 BECAUSE RELAY RTD'S ARE DROFTED OUT. BREAKER TESTED SAT COUNTER READING AFTER MINT #99751 0229 08/19/85 01-SW -MOV -104C 023422 REMOVE GREASE FROM LIMIT NO GREASE FOUND CYCLE VALVE TEST SAT 0229 08/21/85 01-RP -BKR -B-BYP 022788 PM - ON DEMAND FERFORED PMS ON BREAKER AND TESTED SAT 8/17/85 COUNTER READING AFTER MAINT: 99855 0229 08/21/85 01-RP -BKR -BNORM 022787 PM - ON DEMAND PERFORMED PMS LP TO STEP 5.25.12 RT4 RELAYS DROFfED OUT AND COLLD NOT FINISH TESTING AT THIS TIE BREAKER TESTED SAT 8/10/85 COUNTER' READING AFTER MINT 00040 0229 08/21/85 01-M -MOV -18653 022794 INSPECT TOROUE SWITCH SETTING INSFECT TOROUE SWITCH SETTING FOUND OPEN 2 CLODE 2 8/20/85 VARIOUS PARTS ON TE INFORMTION ON TE VALVE DATA WAS NOT OBTAINABL E 8/21/85 0229 08/21/85 01-SW -MOV -104A 023421 REMOVE GREASE FROM LIMIT NO GREASE FOUND CYCLE VALVE, TEST SAT 0229 08/21/95 01-SW -HOV -104D 023423 REMOVE GREASE FROM LIMIT NO GREASE FOUND CYCLE VALVE TEST SAT 8/19/85 l

0229 08/23/05 01-CH -P -2A 023333 ELECTRICALLY DISCOPMECT AND DISCO >NECTED AND MARKED TERMINALS RECOtNECT STRIP HEATERS FOR AND POVED MTWt COVDt CLEAR F M 1

MECHANICS AREA 8/16/85.CECKED 2A1 (36) APO 2B1(36) WITH Om ETER AND COPARED WITH PT 27G VALVES CLEARED RED TAGS l

l

/EPCd' SAFETY RELATED DURING REDUCED POWER SORTED BY UNIT AND DEPARTMENT PROGRAM WPT09860 09/06/85 9:03 PAGE 32

+ .

FROM 08/04/85 THRU 08/24/85 UNIT 01 SURRY RETURNED TO WO DEPT SERVICE MAPK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

CECKED SAT 0237 08/19/85 01-IA -PP -NA 022055 AIR LINE HAS SMALL LEAK REPAIRED CHAFFED SECTION OF LIE WITH SILVER 0237 08/19/85 01-NI -DET -43 007831 INSTALL CAT I BOLTS IN BOTTOM REPLACED TE BOLTS ON TE BOTTOM PLATE OF TE SPOOL PIECE WITH CAT 1 BOLTS 0237 08/19/85 01-SW -P -10B 022943 HIGH D/P CHECKED SENSING LIES AND GUAGES BOTH CECKED SAT OPS RAN FtJMP D/P WAS ONAY OP SAT.

0237 08/19/85 01-VS -F -60A 023282 REFtACE PLASTIC AIR LINE ON PLACED AIR LINE BACK ON SOLEN 0ID SOLENIOD 0237 08/20/85 01-F31 -RMS -163 023280 MONITOR BLOWS FUSES REFtACED MONITOR AND READOUT UNIT.

SYSTEM CECNS GCOD 0237 08/21/85 01-FW -LI -1494 023324 INDICATOR READS 0% WEN ACTUAL VENTED HIGH SIDE OF TRANSMITTER LEVEL 33% LOOP OP SAT 0237 08/21/85 01-MS -TCV -106A 023226 AIR LEAK ON CONTROLLER INSFECTED FOSITIONER FOUND LOOSE FITTING TIGHTENED OP SAT 0237 08/21/95 01-HI -DETR-32 023244 REFLACE PREAW FERFORMED APPLICABLE SECTIONS OF IP-C-NI-19 REPLACED PRE AMPLIFIER NEW AWLIFIER CHECKS SAT 0237 08/21/85 01-SW -PCV -100A 023281 DISCONNECT /RECONECT INSTRUEN- REMOVED / REINSTALLED INST. VALVE TATION FOR MECHANICS CECKOUT TO BE PERFORMED USING WO 3800022345 0237 08/23/85 01-CH -PI -1130 023279 REFLACE PRESSURE GUAGE REPLACED GAGE WITH EW CALIBRATED GAGE 0237 08/23/85 01-CH -TE -1141 011875 RTD HAS INTERMITTENT OFEN LEAD REPLACED RTD VERIFIED CALIBRATION OFLOW LEVEL AMP AND INDICATOR 0237 08/23/85 01-GW -RM -101 022982 INDICATED FLOW LESS THAN CHECKED CORRECTED FLOW AT 6.5 CFM REQUIRED. SAT 0237 08/23/85 01-RI -ANN -F-A-1 023496 TURB TRIP BY RX TRIP LOCKED IN CHECKED CKT OUT.FOUND FIRST GUT WITH Rx TRIP BREAKERS CLOSEO CARD TO IE BAD. LOCATED ONE AND REFLACED IT. TESTED ALARM CKT ON 81 AND 2 FOSITION ON CARD TESTED SAT.

STOCK t OF CARD 0710174 0237 08/23/85 01-VG -RM -131-1 022818 MONITOR READS HIGH. REMOVED AND DE-Col #ED SLEEVE AND DETECTOR. BACKGROUND COUNTS DE 3EAS ED SYSTEM OFERATES OK 0238 08/15/85 01-FP -P -2 015936 REPLACE TEOTTLE LIEAGE ON INSTALLED EW LINKAGE SPEED CONTROL l

.. E JEPCd $AFETY RELATED DURING REDUCED POWER SORTED BY UNIT AND IEPARTMENT F%0 GRAM WPT09060 09/06/85 9:03 FAGE 33 FRth 09/04/85 THRU 08/24/85 UNIT 01 SURRY RETURNED TO WO DEPT SERVICE MARK NUMBER HUMBER WO TITLE HISTORY

SUMMARY

0228 08/19/85 01-SW -MOV -104C 022590 PM - AUTO SCEDLLE CECKED GREASE AND PACKING 0228 08/19/95 01-SW -MOV -104D 022591 FM - AUTO SCEIOLE CECKED GREASE AND PACKING FILLED WITH EP-1 0228 08/19/05 01-SW -PCV -100A 023277 VLV JAMMED SHUT WILL NOT OFEN, VALVE WAS STUCK SHUT, LUBRICATED SPRING AND STEM, WORKED VALVE UNTIL FULL STROKE ACHIEVED. WEN INSTRtPEN TATION WAS HOOKED UP TERE WAS NO INDICATION ON THE TEEE GAGES.ETC 0228 08/19/85 01-SW -PCV -100C 022348 VERIFY PROFER OFERATION OF CECKED VALVE FOUND UALVE BOUND.

VALVE WR TO MECH i 127910 VALVE FREED BY MECH VALVE STROKE SAT 0228 08/19/85 01-SW -PCV -101A 022346 VERIFY PROPER OPERATION OBSERVED VALVE STROKE SAT 0228 08/19/85 01-VS -P -1A 023276 CLEAN SUCTION STRAIER CLEANED SUCTION STRAINER 0228 08/21/85 01-BD -TV -100F 023499 PACKING LEAK ADJ PACKING GLAND IS TUBE BLOCK. NO MORE ADJ LEFT. LEFT PACKING STILL LEAKING i

0228 08/21/85 01-CH -P -2A 022543 FAILED PT 18.9. FtJMP lECLARED Ft#P FAILED AFTER 2 ADESTENTS INOPERABLE MCCARTHY SS WANTS TO OVERHALL WO 63800022662 0228 08/21/85 01-FC -PI -101A 015770 FITTING LEAKS DOWNSTREGM REPLACED SEATS AND SEALS, PACKING 0228 08/21/85 01-FW - -278 023419 REMOVE SFECIAL FNG, INSIM.L INSTALLED VALVE INTERNALS AND CHECK VALVE INTERNALS INSTALLED COVER 0228 08/21/85 01-RC - -77 023400 PACKING LEAK, ADEST OM.Y TRIED TO ADJUST COLLD NOT MOVE GLAND FOLLOWER.EEDS TO BE REPACKED 0228 08/21/85 01-SW -MOV -104B 022589 FM - AUTO SCHEDlLE CHECKED GREASE MD PACKING.

FILLED WITH EP-1 0228 08/21/85 01-VG -RM -109 022468 LOW AIR FLOW ON FROCESS CHECKED FLOW RATE, CORRECTED FLOW 7.75 CFM 0228 08/22/85 01-CC -E -1A 023133 S.W. INLET SIDE HAS A HOLE IN INSTALLED MANUFACTURED 1/4"X6"X12 IT SY THE DRAINLINE Ft. ATE MAIE BY J WYATT.PUT RTV ON SHELL WITH RED RUBBER GASKET THEN MORE RTV THEN ETEL FtATE WITH 3/4" ALL TEEAD 2" PIPE NIPPLE AND l 0228 08/23/85 01-FW -HOV -160A 023350 VAVLE WILL NGT OFEN WITH IF REMOVED MOUNTING BOLTS FROM TOROUE I

SWITCH AND REPLACED TEM WITH TE RIGHT LENGTH EOLTS. TIGHTEN SECUREL

( Y AND REQUESTED GPS TO CYCLE VALVE.

VALVE OFERATED UN3ATISFACTORY AND 0228 08/23/85 01-MS -A0V -102A 023511 VALVE IS MECHANICALLY BOUND OP REMOVE BONNET AND FOUND A LARGE N'JT j 7/8" IN THE BODY CF THE VALVE. THE l Ft.UG AND SEAT RING WERE DAMAGED I

-- 3 -7

-- -m . .

EFE,d SAFETY RELATED DURING REIUCED POWER SORTED BY UNST AND DEPARTMENT F%0 GRAM WPT09860 09/06/85 9:03 PAGE 34 FROM 08/04/85 THRU 08/24/85

  • UNIT 01 SURRY RETURNED TO WO DEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY SUMMRY AND ERE REPLACED WITH NEW SEAT RING AND FLUG ASSEMBLY 0228 08/23/85 01-RS -MOV -155A 023290 ADJUST MECH STOPS, WORK WITH REMOVED CAP FOUND LIMIT STOP NUTS gtte, TOGETHER.NO ADJUSTENT LEFT WITNESS BY S POAGE AND J0W SWIENTONIEWSKI 0228 08/23/85 01-RS -MOV -155B 023289 ADJUST MECH STOPS, WORK WITH REMOVED CAP FOUND LIMIT STOP NUTS ELEC. TOGETER. NO ADJJSTMENT LEFT WITNESS BY S POAGE OC AND JOHN SWIENTONIEWSKI ENG.

0228 08/23/85 01-SI - -241 022779 BODY TO B0tNET LEAK REMOVED BONNET AND STUDS. GASKET AND INTERNALS LOOKED 000D. CLEAN AND REFLACE REPLACE GASKET AND STUDS AND NUTS 0228 08/23/85 01-SI - -243 022739 VALVE BONNET HAS TR EE MISSING REMOVED BONET AND STUDS GASKET sTuos AREA LOOK GOOD.CLIAN AND REFtACE GASKET AND STUIG AND NUTS 0228 08/23/85 01-SW -PCV -100A 022345 VERIFY PROF G OFERATION OF VALVE BOUND WO TO ECH 3800023277 VALVE 8/15/85 CECKED STROKE ON VALVE FOLLOWING MECHANICAL MAINTENANCE SET STROKE FOR 3-15 OP SAT 0228 08/23/85 01-VS -F -58A 023406 REMOVE ACTUATOR AND INSTALL REMOVED ACTUATOR 8/20/85 NEW ONE INSTALL AND COLFLE ACTUATOR TO DAMFG 8/21/85 REPLACED OPE BOLT THAT WAS STRIFfED OUT WITH EW BOLT 0229 08/08/05 01-CH -MOV -1370 022791 INSFECT TORQUE SWITCH SETTING PMS MOV 8/8/85 OBTAIED TOROUE SWITCH SETTINGS 0229 08/08/85 01-CH -P -1A 001349 REINSTALL HEAT TRACING ON HEAT RE-TAFG EAT TRACE BACK ON LINES TRACED LUBE DIL PIPING 8-7-8$

0229 08/09/85 01-DA -TV -100A 022938 ELECT. DISCO >eECT/RECOP#ECT NO DISCONNECTION REQUIRED NO VALVE WORK PERFORED 8/9/85 0229 08/09/85 01-EFH-TX -1H1 022954 CHANGE TAP SETTINGS FROM TAP 1 CHARGED TOP FROM 1 TO TAP 2 CHANGED TAP FROM 4160 TO 4055V 8/9/85 0229 08/10/85 01-CH -MOV -1286B 022790 INSPECT TOR 0lE SWITCH SETTING FICORIO TOROUE SWITCH SETTINGS AND kECORIG NAME PLATE DATA FROM MOTOR AND VALVE 0229 08/10/85 01-EE -INV 3 009562 REFtACE INDUCTOR L-11 AND L-12 REFLACED L-11 AND L-12 INDUCTORS i

, Page 35 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 The below listed codes denotes the following departments:

0228 or R03 -

Mechanical 0229 or R04 - Electrical 0237 or T22 -

Instruments l

(

!EP E*AFETY RELATED DURING REDUCED POWER SDRTED BY UNIT AND DEPARTMENT FROGRAM WPT09860 09/06/85 9:03 PAGE 36t FROM 08/04/85 THRU 08/24/85 UNIT 02 SURRY RETURNED TO WO .

l DEPT SERVICE MRK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

l 0228 08/04/85 02-RH -E -1B 018798 HAS LEAK ON LOW-E AD FLANGE TIGHTEED 0228 08/06/85 02-CS - -1 019562 REQUIRES INSULATION REMOVED INSLLATION REMOVED AND REFLACED 0228 08/06/85 02-CS - -4 019563 REQUIRES INSULATION REMOVED INST.LATION REMOVED AND RE-FtACED 0220 08/06/85 02-CS -FP -153 019933 INStl. ATE PI E FROM 2-CS-1 TO PIPING W G LP AND INSULA *ED 3" 2ft. Below Ground Level BO.N GRG.ND LEVO.

0220 08/06/85 02-CS -FP -153 019934 INSLLATE PIPE FROM 2-CS-4 TO PIPING DUG UP AND INSLLATED APPROX 2ft. Below Ground Love 1 3" BO.md GRG.ND LEVO.

0228 08/07/85 02-EE -LV -NA 012973 BOTH SIDES AIR LOUVERS ARE PT 22.3B WAS FERFORMED SAT ON 42 CPEN WITH DIESEL SECURE EIG ON 8/6/85 NO Fn0BLEMS FOLND IN LOWER OPERATION 8/7/85 0220 08/08/85 02-CH -FL -5 017023 CONSTRtCT A FILTER SHIPPING WORK HOT REQUIRED ,

Cask 0220 08/08/85 02-FW -FCV -2478A 022744 VALVE HAS PACKING LEAK ADJUST ADJUSTED PACKING 0228 08/13/85 02-RP -I$R -ANORM 018660 PM - ON DEMAND PMS COWLETED TO POST MAINT.

CECKOUT 4/24/85 BREAKER TESTED SAT 0228 08/14/85 02-SS -TV -204B 023208 UALVE WILL NOT OPEN FROM FOUND LIMIT SWITCH FOR LIGHT INDICA' TOR OUT OF ADJUSTENT. ADJUSTED TESTED SAT 0228 08/15/85 02-EFH-REL -15El 012827 REFtACE WA RELAY 86-15El REFLACED WA 86-15El PO NO SYO9304 FN 4604804 0220 08/19/85 02-FW -P -2 023379 FtJMP VIBRATIONS EXCEED ACCEPT: FEMOVED INBOARD AND OUTBOARD BEARIN At4CE G CAPS, FOUND BOTH JOURNAL BEARINGS IN GOOD CONDITION 3 OUTBOARD TmuST MARING (TsuST SHOES) WIPED AND ROLLED OVER WITH BABBITT.ALIGNENT 0228 08/19/85 02-MS - -116 022978 VLU BODY HAS FURMANITE FITTING INICTED PACKING WITH FURMANITE LO@0UND. WORK ORDER SUBMITTED TO FEPAIR TO ORIGINAL 078702 0220 08/19/85 02-MS - -119 021331 VALVE HAS BODY TO BONET LEAK INJECTED BODY TO BONET WITH FURMAN' ITE COMPOUND. WORK ORDER SUBMITTED TO ORIGINAL 077928 0220 08/19/85 02-SW -MOV -205D 020827 VALVE WILL NCT TURN MANUALLY REMOVED HANIGiEEL SHAFT ASSY.FOUND NOTHING WRONG INTERNALLY. ASSEMBLED AND INSTALLED HANDWHEEL PIN.

VALVE FUNCTIONS PROPERLY 0228 08/19/85 02-SW -P -10B 022671 PUMP HAS LOW DISCHARGE PRESS- REPLACED 2-SW-P-10B WITH SHOP SPARE -

URE.

VINGINIA E LECTHIC AND POWElf CO SII*ANY It icii >s ox ni. Vi sto ix A u3261

w. L. stuwant vara Pueniumwr Nt clean Orm eATIONE September 13, 1985 Mr. Maurice R. Beebe Serial No.85-667 Office of Resource Management N0/ETS:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32

Dear Mr. Bee'oe:

DPR-37 VIRGINIA ELECTRIC AND POWER POWER SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of August, 1985.

Very truly yours,

)%

W.'L.' Stewart Enclosure (3 copies) cc: Mr. J. Taylor, Director (12 copies)

Office of Inspection and Enforcement Dr. J. Nelson Grace (1 copy)

Regional Administrator Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station

.p