t 4
OPERATI G DATA REPORT DOCKET NO. 50-334 2
DATE 9/6/85 COMPLETED BY P. A. Smith TELEPHONE. 41 '
'41-1825 OPERATING STATUS
- 1. Unit Name: Beaver Valley Pever Station, Unit il Notes Aueust 1985
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Racing (Gross MWe):
923
- 5. Design Electrical Rating (Net MWe):
835 j
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
4
- 9. Power Level To Which Restricted. !f Any (Net MWe):
None
- 10. Reasons For Restrictions. If Any:
N/A -
This Month Yr..to-Date
' Cumulative
- 11. Hours In Reporting Period 744.0 5831".0 81,839.0
- 12. Number Of Hoors Reactor Was Critical 684.8 5414.6 42,770.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 4,482.8
- 14. Hours Generator On Line 684.8 5,270.2 41,353,1
- 15. Unit Reserse Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,799,541.0
_12,885,186.9 96,283,700.9 l
- 17. Cross Electrical Energy Generated (MWH) 580,000.0 4,140,000.0 30,634,430.0
- 18. Net Electrical Energy Generated (MWH) 544,720.0 3,881,250.0 28,506.093.0
- 19. Unit Service Factor 92.0 90.4 52.9 i
- 20. Unit Asailability Factor 92.0 90.4 52.9
- 21. Unit Capacity Factor (Using MDC Net) 90.4 82.2 46.5
- 22. Unit Capacity Fac:or (Using DER Net) 87.7 79.7 as.1
- 23. Unit Forced Outage Rate 8.0 8.2 7s.0
- 24. Shutdowns Scheduled Over Next 6 Months ! Type. Date, and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operationi:
Forecast Achieved
~
INITIAL CRITICALITY N/A WA INITIAL ELECTRICITY N/A N/A l
COM41ERCIAL OPER ATION N/A
_ N/A
[
'd 8511180774 850831 PDR ADOCK 05000334 R
PDR (9p7) l g
I
._ ~ __ _-.
MAJOR MAINTENANCE 1.
Maintenance of No.1 Diesel Generator air start system.
2.
Repaired Low Head Safety Injection Pump ISI-P-1A & 1B 1 3.
Repaired Main Steam Trip Valves 9
~
t AVERAGE DAJLi UNIT ?OWER LEVEL DOCKET NO. _30~334 UNIT EU S C il 9/6/85 DATE COMPLETED SY P.A. Smith TELEPHONE (412) 643 1825 MONT11 AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
IMWe-Net; I
827 784 17 825 783 2
gg 785 784 3
19 784 4
825 20 825 785 2]
784 6
23 785 7
785 23 783 g
24 785 825 9
25 826 784 10 26 784 784 gg 27 783 825 l:
28 785 784 415 13 29 783 14 0
30 15 784 0
31 826 16 INSTRUCTIONS On this fortnat.!ist the avera e 4;,g
I#! I" *WC"et far Ch day in the reporting month. Compute to the ne: rest whole megswaii,
?
19/7 7 )
. - -... - ~ -
I.
l i
UNIT SHUTIM)WNS AND POWER REIMJCTIONS IMPCKET NO.
50-314 i
UNIT NAME IIVPS UniL #1 IDATE 9/6/85 REPORT MONiil AUGUST COMPLETEll RY P.
A. Smith TER.ErilONE (412) 643-1825 I
m k
cn w so o I
o*
'd 0.5 "
Licensee E*
Cause & Corrective l
e 4
No.
Date
%E E
3UE Event
!e EE Action to R
$5 E
'5 E "
Report #
$E
$0 Prevent Recurrence H
A
$"5 m"
0 Oo 29 850929 F
59.2 A
3 85-015 PA AIRDRY At 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> a reactor trip occurred l
l due to a loss of instrument air caused by a broken line on the f ristrument air dryer.
I a
l l
l 1
i 1
2 3
4 F: F.nsed Reasam:
Method:
I:sfoliit G-Instinstiims S S(hedu'ed A f quipment Failutellarlain) 1-Manual los Pseparats ni of DJ'a j
H Maintenerne r Test 2-Manual scram 1.ntr> Slicces law l.hrei5cc 0 Refueling 3-Automatic Scram F*ent Repmi Il I lt i l ite t Ni tit! G
- 1) Regulatos) Restrictiim 4-Continued From Previous Month Illtil I i
I f)priatos Isaining A Ikense l'saminasi'm 5-Re.*oc t t on j
I Adnunestsative 9-Other 5
G Operaliimal I isus il aplain t I sInhit 1 Simc'Nunse i
11/77) 11 Oilice II:splain)
[
i e-4
ATTACHMENT In accordance with Station Technical Specification 3.1.3.2.(3), this is to report that on May 24,1985 at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Rod Position indicator (RPI)
K-6 had a greater than 12-step deviation from the Group Demand Counter.
Voltage readings for Rod K-6 were again taken af ter the rods were moved at 0115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> ar.d Rod K-6 was indicated to be within 12 steps of its bank.
..t
e P.
s 3 3
h
).
'A@
Telephone (412) 393-6000 Nuclear Group P.O. Box 4 Shippingpert, PA 15077-0004 September 6,1985 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accordance wi th Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of August,1985.
Very tr ly yours,
,hl J.
. Carey Vice President Nuclear Group rw Enclosures cc: NRC Regional Office King of Prussia, PA 9
t,
^j NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE August 1985 4
August 1 The Station was in Operational Mode 1 with reactor power through at a nominal 100 percent.
Reactor Coolant System was at i
August 28 normal operating pressure and temperature.
).
1 August 29 At 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> a reactor trip occurred due to a loss of instrument air caused by a broken line on the instrument air dryer.
August 30 Plant cooldown was in progress with the Unit entering through Mode 4 at 0332 hours0.00384 days <br />0.0922 hours <br />5.489418e-4 weeks <br />1.26326e-4 months <br /> on the 30th and Mode 5 at 0017 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> August 31 on the 31st.
~