Advises That Response to Generic Ltr 83-28 Incomplete.Addl Info Requested.Forwards Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28..., Technical Evaluation Rept
ML20138R611
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/06/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20138R612 List:
References
GL-83-28, LSO5-85-11-011, LSO5-85-11-11, TAC-53607, NUDOCS 8511180697
Download: ML20138R611 (2)


Text

_. - . . . . . - - --__ _ _

l

, Novemb:r 6, 1985  !

6 Docket Nos. 50-245/336/4c LS05-85-11-011 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company

Post Office Box 270 Hartford, Ccnnecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

DRAFT TECHNICAL EVALUATION REPOPT (TER) FOR ATWS ITEM 1.2 (GENERIC LETTER 83-28)

Re: Millstone Nuclear Power Station Units 1, 2, and 3 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2. For the three plants at the Millstone Nuclear Power Station, your response was found to be incomplete in several of the areas evaluated.

The DRAFT TER (enclosure 1) provides a technical evaluation representing the staff's initial judgment of the areas evaluated. To preserve our present review schedule, we would appreciate ycur ccoperation in obtaining additional information that will permit us to complete our review. It would appear that the needed information (enclosure 2) er ycur facility could be obtained by telephone conference within one week of your receipt of the DRAFT TER.

Your project managers will be working with you to arrange an acceptable time to conduct the necessary conference calls.

+

Sincerely,

  • I h8 sismogk Wa John A. Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing

Enclosures:

DISTRIBUTTION

1. DRAFT TER on .

Docket BGrimes ABournia ATWS Item 1.2 NRC PDP JPartlow

2. Information Request local PDR JShea cc w/ enclosure: ORB #5 RDG CJamerson

, See next page HThcapson JZwolinski OELD ACRS (10)

EJordan D0sborne 8Doolittle PKreutzer

. MRushbrook GHolahan DL:0RB#5 DL:0RQ DL: #3 D[.pf DL:0RB#5 CJamerso JShea4 00sForne BDM N)ttleJ7wolinski -

11/j-/85 11/ / 11/4f/85 11/b/85 11/(g/85 8511180697 851106 PDR ADOCK 05000245 P PDR

A .

Mr. John F. Opeka Millstone Nuclear Power Station Nertheast Nuclear Energy Company Unit No. 1, 2 and 3 cC*  : -

Gerald Garfield, Esq. Mr. Weyne D. Romberg-Day, Perry & Howard Superintendent .

Counselors at Law Millstone Nuclear Power Station City Place P. C. Box 128 Hartford, Connecticut 06103-3499 Waterford, Connecticut 063P5 Regional Administrator, Region I Mr. Edward J. Mroczka U.S. Nucleer Pegulatory Connission Vice President, Nuclear Operations Office of Executive Director for Northeast Nuclear Energy Cenpany Operations P. O. Box 270 631 Park Avenue Hartford, Connecticut 06141-0270 King of Prussia, Pennsylvania 19406 Mr. Maurice R. Schully, Executive Mr. Charles Brinkman, Manager Director Washington Nuclear Operations Connecticut Municipal Electric C-E Power Systems Energy Cooperative Combustien Engineering, Inc. 268 Thomas Road , _ ..

7910 Woodmont Avenue Groton, Connecticut 06340 Bethesda, Maryland 20814 Robert W. Bishop, Esq.

Mr. Lawrence Bettencourt, First Selectman Corporate Secretary Town of Waterford Northeast Utilities Hall of Records '- 200 Boston Post Road Post Office Box 270 Waterford, Connecticut 06385 Hartford, Connecticut 06141 Northeast Utilities Service Company Mr. T. Rebelowski ATTN: Mr. Richard R. Laudenat, Manager Senior Resident Inspector Office Generation Facilities Licensing U. S. Nuclear Regulatory Ccmission Post Office Box 270 Millstone III Hartford, Connecticut 06141-0270 Post Office Box 615 Waterford, Connecticut 06385 Kevin McCarthy, Director Radiation Control Unit Mr. Michael L. Jones, Manager Department of Environmental Pro.iect Management Department Protection Massachusetts Municipal Pholesale State Office Building Electric Company Hartford, Connecticut 06106 Post Office Box 426 Ludlow, Massachusetts 01056 Fr. Jchn Shedlosky Resident Inspector / Millstone Mr. Karl Abrahan Box 811 Public Affairs Office, Region I l Niantic, Connecticut 06357 U. S. Nuclear Regulatory Commission l King of Prussia, Pennsylvania 19406 I Office of Policy & Management ATTN: Under Secretary Energy Ms. Jane Spector Division Federal Energy Regulatory Comission 80 Washington Street 825 N. Capitol Street, NE Hartford, Connecticut 06106 Room 8608C Washington, D.C. 20426 I