Suppl 1 to Special Rept 85-09 Issued on 850731 Re Concern W/Personnel Hazard Caused by Opening of Fire Doors During Cardox Sys Actuation.Door Replacement Will Not Meet 851231 Schedule Completion.Completion Date of 860228 Suggested
ML20138R342
Person / Time
Site: Rancho Seco
Issue date: 12/26/1985
From: Lowe D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
85-09, 85-9, RJR-85-575, NUDOCS 8512310196
Download: ML20138R342 (1)


Text

esuu.

SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Straet P.O. Box 1583o Sa::ramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA RJR 85-575 December 26, 1985 J B MARTIN REGIONAL ADMINISTRATOR REGION V 0FFICE OF INSPECTION AND ENFORCEMENT ATTENTION DOCUMENT CONTROL DESK V S NUCLEAR REGULAT0PY COMMISSION WASHINGTON DC 20555 DOCKET N0. 50-312 LICENSE NO. DPR-54 SPECIAL REPORT NUMBER 85-09, SUPPLEMENT 1 In our July 31, 1985 report, we described our concern with the potential per-sonnel hazard created by the opening of the Nuclear Services Electrical Build-ing (NSEB) fire doors during an actuation of the cardox system, and provided our schedules for an interim and long term resolution of this concern. The interim resolution of providing a more secure latching mechanism for the exist-ing doors has been completed as scheduled; however, the long term resolution of replacing the existing NSEB doors with 3-hour fire rated doors with " panic" hardware and flush bolts is not expected to be completed until February 28, 1986. This work was originally scheduled to be completed by December 31, 1985.

The delay in implementing the long term resolution is attributed to the 6-8 weeks delivery time required for the materials and special hardware required to meet the Underwriter's Laboratory (U/L) ratings and 10 CFR 50, Appendix R requirements.

If you have any questions cor.cerning this matter, please contact Ron W. Colombo at the Rancho Seco Nuclear Generating Station Unit No. 1.

n. . _

DEWEY 'K. K. LOWE GENERAL MANAGER cc: Director, NRR 8512310196 851226 2 F DR ADOCK 0500 h