ML20138R274

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-455/85-44 on 851202-13.No Violations Noted
ML20138R274
Person / Time
Site: Byron Constellation icon.png
Issue date: 12/27/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20138R276 List:
References
NUDOCS 8512310146
Download: ML20138R274 (2)


See also: IR 05000455/1985044

Text

- -

. .

DEC 2 71985

Docket No. 50-455

Coninonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. S. Love of

this office on December 2-13, 1985, of activities at Byron Station, Unit 2,

authorized by NRC Construction Pennit No. CPPR-131 and to the discussion of

our findings with Messrs. V. Schlosser and G. Sorensen and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Coninission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report

No.50-455/85044(DRS)

See Attached Distribution

8512310146 851227

PDR ADOCK 05000455

O PDR

Y

RIII RIII RIII

W

P,III

4YN)

MLove/mj /p, Williams

(18~ byst

Forriey MHarris)on

0 12/J']/85 ) D !t{m/Pr ty

// /

. .

Commonwealth Edison Company 2 DEC 9 7 'o 5

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division