Arizona Nuclear Power Project P O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 ANPP-34230-EVB/JRB/bsc 94.04 cl h, 60 m
December 11, 1985 O
m 31 E
o
- -- c4 f
CD
- u EO o.c Mr. John B. Martin i
22 c
}
Office of Inspection and Enforcement 3
U.S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 SUBJECT :
Certification of the Operability of All Required Systems for Initial Fuel Load, Palo Verde Unit 2
Reference:
PVNGS Unit 2 Operating License NPF-46
Dear Mr. Martin:
As required by Item 1.b of Attachment 1 to the Palo Verde Nuclear Cencrating Unit 2 Operating License, NPF-46, I am hereby certifying that Item 1.a of. Attachment I to the License has been completed for the initial fuel load of Unit 2.
~
The operability of all systems required for the initial fuel load has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.
This has been accomplished by the completion of the applicable surveillance tests or by preoperational testing which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval.
Very truly yourp3
{
(1{1 q LLL E.E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/JRB/bsc cc:
D. Eisenhut T. Novak M. Licitra File: 85-056-026 U312:300116 831211 I