ML20138Q218
| ML20138Q218 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/05/1985 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20138Q220 | List: |
| References | |
| NUDOCS 8512270098 | |
| Download: ML20138Q218 (2) | |
See also: IR 05000245/1985024
Text
-. .
-
-_ ..
. - - _ _ . . .
.
s.
.
%
..
,
Docket Nos. 50-245; 50-336
Northeast Nuclear Energy Company
'
ATTN:
Mr. John F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
Post Office Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject:
Inspection 50-245/85-24; 50-336/85-30 (9/4/85 - 10/28/85)
This routine safety inspection was of operational and supporting activities at
Millstone Units 1 and 2.
Particular attention was directed to the preparations
for and actions during Hurricane Gloria which struck on September 27.
Additionally,
inspection emphasis was placed on the discovery of design deficiencies at both
plants.
It appears that, as set forth in the Notice of Violation enclosed as Appendix A,
one of your activities was not in full compliance with NRC requirements. This
violation is for failure to make reports as required by 10 CFR 50.72 and 50.73.
No reply to this violation is necessary because adequate corrective action has
been taken.
We also wish to note, as an example of good performance on the part of your staff,
the disccvery of a Unit 2 design deficiency through testing of the plant simulator
(Report Detail 4 on report page 9 refers).
Your cooperation with us is appreciated.
Sincerely,
Ori;;i; ? signed Bya
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Report 50-245/85-24; 50-336/85-30
cc w/encls:
E.J. Mroczka, Vice President, Nuclear Operations
W.D. Romberg, Station Superintendent
D.O. Nordquist, Manager of Quality Assurance
R.T. Laudenat, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
8512270098 e51205
DR
ADOCK 050
5
T
-
I
(
._
_
.. _
. _ _
.~.~_-__ __.,-._.- - ---
J-
-
_-_
..
. , -
.
..
.
.
Northeast Nuclear Energy Company.
2
DEC 0 51985
~
bcc w/ enc 1s:
Region I Docket Room (with concurrences)
-Director DRS-
Director DRS&S
DRP Section Chief
M. McBride, RI, Pilgrim Nuclear Station
D. Osborne, LPM, NRR
.
-T. Rebelowski, SRI, Millstone 3
A. Rubin, Div. Safety Tech., NRR
J._Shea, LPM, NRR
P. Swetland,- SRI, Hadda Neck
DRP:RI
D
R
DRP:RI
6h
@A
TSHEDLOSKY'
aky
ECMcCABE
ZINGER
11/3 /85
/85
n/3 /85
12/f/85
t
-
A