ML20138P763

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/85-52 & 50-457/85-50 on 851021-1130.No Violations Noted
ML20138P763
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/05/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20138P766 List:
References
NUDOCS 8512260253
Download: ML20138P763 (2)


See also: IR 05000456/1985052

Text

_ _.. . _ _ _ _ - . _ _- - . _ _ _ _ _ _ . _ - _ . - _ _ . _ - __ __ -_

3Ov/3

.

DEC 5 885;

O\ -

-Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell. Reed

Vice President

-Post Office Box 767

Chicago, IL 60690 ,

Gentlemen:

L

This refers to the routine safety inspection conducted by Messrs. R. D. Schulz

and W. J. Kropp of this office on October 21 through November 30, 1985, of

activities at the Braidwood Station, Units 1 and 2, authorized by NRC Construction

' Permits No. CPPR-132 and No. CPPR-133 and to the discussion of our findings

with Mr. M. Wallace at the conclusion of the inspection.

The enclosed copy.of our. inspection report identifies areas examined during

the inspection. Within these areas, tile inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

'

No violations of NRC requirements were identified during the course of this

-k inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this' letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. S. Little, Director

Braidwood Project

H

Enclosure: Inspection Re

No. 50-456/85052(DRP); port

No. 50-457/85050(DRP)

!

!

See Attached Distribution

l l

\ l

8512260253 851205 i

PDR ADOCK 05000456

G PDR l

j l d >boj

.. ---_--- - - - - - - . . - - . . _ - . - - . - . _ - - - _ - .

a

5 1985;

'~'s Commonwealth Edison Company 2

DEC

\

-. -

Distribution

cc w/encls:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB (RIDS)

Licensing Fee Managemont Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office Environmental

Control Division

D. W. Cassel, Jr., Esq.

o' i J. W. McCaffrey, Chief, Public

/ Utilities Division

uf H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

e~

\ l

v

'

hl

~

Pe'ke/jlk Farber anielson i lams Little

12/04/85 jjjgpf \'L\% n? l2lblCC