Submits Proposed Resolutions to Questions Submitted Re Renewal Application for License SNM-986
ML20138P727
Person / Time
Site: 07000938
Issue date: 10/12/1993
From: Masse F
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
To: Adams M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20007F222 List:
References
RTR-NUREG-1535 TAC-L21687, NUDOCS 9703050262
Download: ML20138P727 (2)


Text

.

,e EnvirS.nm1ntal MASSACHUSETTS lNSTITUTE oF IECHNoLOGY N

MEDICAL DEPARTMENT g

77 MASSACHUSETTS AVENUE,20EL238 I

4 8ervice CAMBRIDGE, MASSACHUSETTS 02139-4307

/

October 12, 1993

,/

Licensing Branch Division of Fuel Cycle Safety and Safeguards i

Office of Nuclear Material Safety and Safeguards US Nuclear Regulatory Commission Washington DC 20555 Attention:

Mary Adams RE:

Renewal of SNM-986 TAC L-21687

Dear Mary:

As we have discussed, the renewal application for SNM-986 should probably be significantly amended at this time to reflect recent decisions made between MIT and the NRC Reactor division relative to the bulk of the SNM under this license.

The current plans to acquir,e additional enriched uranium for use exclusively at the Reactor caused us to reconsider which license should be utilized to cover such material.

The NRC Reactor division personnel have agreed such material should reasonably by covered in the R37 license issued to the MIT Research Reactor.

This decision also affects the bulk of the enriched material covered under the existing SNM license, hence we will be revising the listing for the current renewal application as soon as we complete the application for amendment to the Reactor license and secure NRC agreement on its contents.

The seven questions submitted on our renewal request will be formally answered with that revised listing.

Following are the proposed resolutions to those questions:

1.

The renewal request is for 5 years.

2.

This issue is basically covered above and will be thoroughly addressed with the revised listing.

3.

The Institute RPO clearly has full shutdown authority and delegates such to the Reactor RPO.

4.

The corrective action mechanism will be described with the revised' listing.

5.

A full personnel update will be included.

9703050262 970117 PDR NUREG 1535 C PDR

' Director '

Biohazard Assessment Industrial Hygiene Radiation Protection Reactor RPO Boles UNAC RPo

( A 3 5360

7) 53 1740 t 1) 3 2594 53 100 253 4203 MA Fan (117)253 4479 -

For (4171258 4107 Far 1417)253 4879 For (615 253-4879 (415 2416600 For 1615 245 0901

)

l

. _. ~ -. _

t

.a

~

I US' Nuclear Regulatory Commission SNM-986 i

October 12, 1993 i

f 6.

The removal of license condition 15 will be formally requested f

with the revised listing.

1:

7.. The Escrow Agreement le currently under review at the request of Region I.

This iss - has been forwarded to the appropriate

~

parties for inclusion in that review.

E' I anticipate that the questions still to be resolved on the related l

issues should be in place in time to complete the paperwork on _this application by mid-November.

I will forward this material to you i

as soon as practicable.

You

truly,

/

uk N I

Frank Mass 6

/

)