ML20138P271
| ML20138P271 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/12/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20138P273 | List: |
| References | |
| NUDOCS 8512260023 | |
| Download: ML20138P271 (2) | |
See also: IR 05000327/1985039
Text
Ub f0LN
(
.
.
,
.
DEC 121985
Tennessee Valley Authority
JTTN:
Mr. H. G. Parris
Manager of Power and
Engineering (Nuclear)
6N11 B Missionary Ridge Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT NOS. 50-327/85-39 AND 50-328/85-39
On November 12-15, 1985, NRC inspected activities authorized by NRC Operating
License Nos. DPR-77 and DPR-79 for your Sequoyah facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews wita personnel, and observation of activities
in progress.
Within the scope of the inspection, ne violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
1
i%
>
,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-327/85-39
and 50-328/85-39
cc w/ enc 1:
W. L. Abercrombie, Sequoyah Nuclear Plant
Site Director
f . R. Wallace, Plant Manager
J . W. Whitt, Chief, Nuclear
Vd.SafetyReviewStaff
L. Williams, Jr. , Supervisor
Licensing Section
vG. B. Kirk, Compliance Staff Supervisor
A . E. Wills, Project Engineer
bcc w/ encl:
(See page 2)
8512260023 851212
DR
ADOCK 05000327
\\
rEL I
.
_. _
_,
'.
.
.
.
Tennessee Valley Authority
2
DEC 121985
bec w/ encl:
pMRC Resident Inspector
Document Control Desk
State of Tennessee
.
H
-
ley:bhg
Slake
AHer t
AI
atonis
11/.2r/85
F/lo/85
/jp/85
11
85
_