Forwards Insp Rept 99900251/85-01 on 850923-27 & Notices of Nonconformance & Violation
ML20138P131
Person / Time
Issue date: 12/18/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Benkert J
JOSEPH OAT CORP.
Shared Package
ML20138P133 List:
References
REF-QA-99900251 NUDOCS 8512240318
Download: ML20138P131 (4)


Text

{{#Wiki_filter:. _ _ . _ . _ , . . _~ Jp,[ f UNITED STATES 8- # NUCLEAR REGULATORY COMMISSION

 %            .$                                       WASHINGTON, D. C. 20605
                  ..,,,,                                        December 18, 1985 l

Docket No. 99900251'/85-01 h t

Joseph;0at Corporation.

ATTN:Mr. John Benckert-

                              ; Quality Control Manager-
                    -2500 Broadway-                                                                         ,
                    ~ Camden,,New Jersey 08104 Gentlemen:

This refers to the inspection conducted by Messrs. R. Cilimberg, J. Craig, R. 'Pettis, J.~ Thomas, B. Brown .and Ms. C. : Abbate of this office on 1 . September 23-27,--1985, of your, facility at Camden, New Jersey, and to the discussions of our findings with~you and members of your staff at.the conclusion of the inspection. The purpose of this. inspection'was to determine the adequacy and verify the

                    . implementation of the. Joseph Oat Quality Assurance _ program relative to the
                   - fabrication of canisters which will be us2d during the defueling and subsequent        ,
                   -storage of TMI-2 core debris. . Areas examined during the inspection and our-findings are-discussed in the enclosed report. Within these areas, the inspection consjsted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.
                   ' Activities observed during this inspection were limited to Oat's initial
     ,t            . fabrication of two canisters as opposed to the activities to be performed
                   .when full fabrication of canisters is in progress. LDuring the inspection ~it
was found that the; implementation of your QA program failed to neet ceitain 4-'
                    -NRC requirements. Weaknesses in the implementation of your QA program were identified in the area of procedural controls for. operations performed on the s canisters during, fabrication. The specific findings and references to the-7 pertinent requirements;are identified.in the enclosures to this letter.

Additionally, questions concerning the sui _tability of the concrete resin for use in.the fuel canisters and the quality of resin catalyst in the recombirers . in the lower canister heads'were identified during this inspection. The NRC recognizo that resolution of_ these questions is not within Oat's area of-responsibility. These items are in the enclosed report not as a reflect 4on upon Oat's-activities, but rather, are included for completeness with respect

                  'to= issues potentially affecting the canisters.
f I
    +                                           .       .    - -      - _ . -               ,. .                            -.
                    ', I L

TJoseph Oat Corporation 1 December 18', 1985 ' Further, an : item of noncompliance..with th'e-requirements of 10 CFR Part 21 + :was identified. Specifically,' weaknesses.in your procedures concerning s .10 CFR,Part 21 were found. . The enclosed Notice of Violation is sent to you tpursuant to the' provisions of Section.206 of the Energy Reorganization Act

                                 .of-1974.- You are required to submit to this office within 30 days from the
                                                                    ~
                                  .date of this. letter a. written. statement containing:.- (1)-a description of-
                                  -steps that have.been or will be taken to correct these items; (2) a
                                 ; description'of steps that have been.or will-be taken to prevent recurrence;-                    ,

and (3) the dates your corrective actions and preventive measures were or will be completed.- Consideration may be given to extending your response-time for good cause shown. L fYou~are.also. requested to submit a similar written statement for each item. {which appears in the enclosed Notice of Nonconformance.

      ,                            The. responses' requested by this letter are not subject to the clearance
procedures of the Office of Management.and Budget as required bj the Paperwork :

Reduction'Act of 1980, PL 96-511. .

In' accordance with 10 CFR 2.790 of the Commission's' regulations, a copy of this 11etter and the enclosed inspection report will be placed in the NRC's. Public c Document Room.'

Should you have any. questions concerning this inspection, we will be pleased to discuss them with you. Sincerely,. L

                                                                               ' Gary . 2ech, '     ef
                                                                               . Vendor-Program Branch
                              .,                                                Division of Quality Assurance, Vendor, and Technical Training Center Programs it                                                                               Office of. Inspection and Enforcement -

Enclosures:

1. f Appendix A-Notice of Violation
                                - 2.'     Appendix B-Notice of Nonconformance                                                      i
                         # :3. Appendix C-Inspection Report 99900251/85-01
                                -4. , Appendix D-Inspection Data Sheets (12 pages)
           '                      cc'w/enclosurer:

Sechtel Power Corporation ATTN:- Mr. T.LI. Gillespie 1 Manager, Quality Assurance Projects

                                ~15740 Shady Grove Road .                                                                          ,
                               .Gaithersburg,-Maryland. 20877-                                                                     '
         ,b-        ,L.  -' - V.      'A.-
                                      . 2        s     ,

kh

                                                                                                                                        ~
                               ;    ,f IJos;ph' .4 0at(Corporatitn                                               December 18, 1985 jDISTRIBUTION:

W IE:09:

                                         .VPB Reading--

DQAVT Reading

                                         .JTaylor-              s RVollmer-
  -                                        BGrimes TMurley,;RI 3
        ~

1JStones ' JCraig' zs ,

                                         'RCilimberg-       '

RPettis .

                                        -WTravers.
NRR/TMIPO.
                                         -JThomas, TMIP0'
                                         ;BBrown, EG&G                                                                                _

4i ~ ,sCAbbate.

                              ,            HThompson, NRR-s Y

A l 'I J b

 ~ :.n :

l 4

                                                    'l
                                                           -B B:00AVT          :00AVT       .DQAVT
                                           =VPB:DQAVT\--{.

RCilimberg: sam , WCraig uGZech Grimes L12ho/85=  : % /85 12/d/85 12/q/85 )

                                                  ~

jfff ~ ] ^ ^ ' -

\

g l ' id:seph.0atCsrporation

                                                                                                    -Decemb2r 18, 1985
                                       ~ DJ,STRIBUTION:          -

[

         ,4      5 . ' A IE:09
                                        ,VPB Reading
                                       .DQAVT Reading.

JTaylor.

                  .                     .RVollmer.
        .-<                                 .BGrimes..
                                       -TMurley,'RI'
                           .           ' JStone JCraig .

s .. :RCilimberg RPettis',i NRR/TMIPd

                                        -WTravers JThomas, TMIPO..                                       -
             ,-                              BBrown, EG&G-
$i# [CAbbate',_. .,

e .; _ . HThompson, NRR

                ,m
<--. i J

L

                              -1
                                                           .b VPB:DQAVT\hO                   .

B:00AVT  ! :DQAVT . DQAVT RCilimberg: sam {,NCraig uGZech Grimes 12/so /85.  :%/85 12/d/85 12/q/85

                                 ~

r - 6-.

Joseph Oat. Corporation- - 3' - December 18, 1985 D' GPU Nuclear Corporation ATTN: Mr. F. Standerfer Vice President / Director TMI-2 Post Office Box 480

                 ' Middletown, Pennsylvania 17057' U.S. Department of. Energy-TMI Site Office ATTN: Mr. W. W. Bixby Manager Post Office Box 88 '
               - Middletown,' Maryland 17057
              --  Nuclear Energy Services Manufacturing ATTN: Mr. C. E. Anderson Director of Quality Assurance                               ,

1000 Shelter Rock Road Danbury. Connecticut 06810 Nuclear Energy Services Manufacturing ATTN: .Mr. F. Sugar General Manager

                 - 101 Swing Road Greensboro, North Carolina 27409 k

r'}}