Forwards Updated Listing of Correspondence W/Nrr Requiring Written Response Re Outstanding Licensing Issues.Util Ack Recent NRC Efforts to Complete Licensing Actions.Addl Efforts to Expedite Priority Items Requested
ML20138P118
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/10/1985
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
1994N, SL-77, NUDOCS 8512240308
Download: ML20138P118 (3)


Text

y, pi fO

" Gecgia Power Company y,ap *.- 333 Piedmont Averme :.

s

' Atlanta, Georgia 30308~,

- Telephone 404 52&6526 Mainng Address:

Post Office Box 4545-Ai!anta, Georgia 30302 Georgia Power L T. Gucwa the southem elecinc system -

Manager Nuclear Engineenng andchief nucieasom SL-77 1994N l December 10.-1985

' Director of Nuclear Reactor Regulation-

~

~ Attention: =Mr. D. Muller,-Project Director

~BWR-Project Directorate No. 2

-Division _of. Boiling Water. Reactor Licensings U. S.-Nuclear Regulatory Commission

-Washington, D. C.7 20555

' NRC DOCKCTS '50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 c'

EDWIN I. HATCH' NUCLEAR PLANT. UNITS 1,.2

'0UTSTANDING SUBMITTALS-LIST-Gentlemen:

i.;;

At' achid please find. an updated listing-of. correspondence' with NRR to t

which -a - written response ?is expected.

~ The ~ attachment ' is. tabulated.

chronologically by1 Georgia. PoweriCompany's (GPC) submittal. date.

.GPC ' is.

~ iready.to Jdiscuss-modifications to thisr status report.'and~ will promptly Laddress any questions you might have regarding these licensing issues.

GPClacknowle'dges 'and --appreciates ;.the recent - NRC efforts to complete

' ~

licensing-- action on our submittals - related to the change ini reporting-requirementsL for primary coolant and secondary containmentgleak rates.- We

~

-respectfully request ~your continued efforts to expedite those. priority items

~

submitted in support of the Unit 1 outage, as noted in the attachment.

~

~If'you have further.-questions, please contact this office at any time.-

Very truly yours, L

fr4 =

L. T. Gacwa MJBlackwood/lc

. Attachment

+

c: ' (w):

'Mr. J.~T. Beckham', Jr.

(w):

Mr. H. C.. Nix, ~Jr. -

go'\\

y'

~(w):1

.Dr..J. N. Grace (NRC-Region II)

~

T (w):

-Senior-Resident Inspector i

g,,

' ' "B512240308 851210 t

rw 4==

ao%

g' n

.p.

~

z c

j

~

36.-+%,,

(Pag % No.:

1; 412/10/85:

, OUTSTANDING LICENSINGEISSUES WITH SUBMITTAL AT NRC

?LETTEi.lUNITf rSUBJECT

'eDATE<

.O-APPROVAL ~-.0F ITEM REQUIRED FOR-UPCOMING OUTAGE

-LC ITEM CLOSED SINCE LAST-REPORT-f01/26/77i3211 ILRT-CHANGES "08/30/77L321?

ALLOW USE OF MODIFIED CRANE'TO. LIFT SPENT FUEL CASK j10/03/78!321 CHANGE.PSW, DIESEL REQUIREMENTS TO REFLECT SWING STATUS'OF

[.'-

D/G_IB:

-[03/05/79321]

.~ REMOVE-REFERENCE TO OUTDATED VERSION OF APPENDIX J-

09/27/821366-
BUILDING SETTLEMENT SURVEILLANCE - SUBMIT RESULTS OF-ENGINEERING ANALYSIS y

LO4/15/83!321,366 GENERIC; LETTER:82 REQUIREMENTS FOR EMERGENCY RESPONSE

? CAPABILITY ~

DRYWELL. PURGE AND VENT CHANGES.FOR 18" ISOLATION. VALVES (SEE T

t06/15/83'321,366:

LETTER'. 8-5137 ) -

112/21/8 -321,366'

' REQUIRE [H202~ ANALYZER' CONTINUOUS OPERATION'AFTER LOCA ONLY

~

E04/23/84 366-

ATWS RPT-CLARIFICATIONS E

'i.U9/05/84:366L

PRIMARY: CONTAINMENT ISOLATION OF, PURGE AND VENT ON HI RAD

[09/12/641321-

~ ' OPERABILITY-DEFINITION

~

!09/19/84'366' E FRACTURE MECHANICS' ANALYSIS PER GENERIC LETTER 81 FEEDWATER NOZZLE (11/09/8.4 321,366

, DIESEL; GENERATOR SPECIFICATIONS

?01/10/85.366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR' COOLANT-SYSTEM STAINLESS STEEL PIPE 201/11/85f321

' PROPOSED CHANGE' TO. TECHNICAL " SPECIFICATIONS - DELETION OF

' DEFINITION OF " CUMULATIVE DOWNTIME" i 01/17/85 321-

.HNP-1. PROPOSED FIRE PROTECTION TECHNICAL SPECIFICATIONS -

'^

MODIFICATION' TO THE NUMBER AND LOCATION OF FIRE DETECTORS 05/06/85.321,366-PROPOSED MODIFICATIONS AND SCHEDULE FOR REACTOR WATER LEVEL

" INSTRUMENTATION IMPROVEMENTS - GENERIC LETTER 84-23 I

tJ05/09/85L366-REQUEST FOR TECHNICAL SPECIFICATION RELIEF - OVERCURRENT

-PROTECTION FOR' CONTAINMENT PENETRATIONS a

a---

=

,x 5.

- lc.

yg y EPh i No; '.

12-

.~

112 10/85

. OUTSTANDING LICENSING-ISSUES WITH SUBMITTAL AT NRC g

N

[LETTERL. UNIT- -

fSUBJEC",

l

~j ffDATE-,

05/13/85E321,3666 REQUEST-FORfADDITIONALSINFORMATION - SEISMIC SPECTRA

~

_ BROADENING f05/20/85}321:

~C? CHANGE.TO TECHNICAL ~ SPECIFICATIONS - DELETE REPORTING

-REQUIREMENTS FOR: PRIMARY COOLANT AND SECONDARY CONTAINMENT.

LEAK RATE-iO6/03/85/321,366
  • REQUEST:.FOR' ADDITIONAL INFORMATION GENERIC LETTER 83-28'-

JSALEM EVENT

' SCRAM BREAKER FAILURE

~ 06/25/85 321,366)

TINSERVICE1 TESTING

. INSERVICE-INSPECTION PROGRAMS' UPDATE 1

107/19/85'321,366 O_ SCHEDULE:FOR SUBMITTAL FOR PLAN OF ANTICIPATED TRA'NSIENTS

~ ~

~

~

'WITHOUTESCRAM MODIFICATIONS FOR NON-SAFETY RELATED EQUIPMENT'

.07/24/8513213

'O CHANGE:TO' TECHNICAL' SPECIFICATIONS - ANALOG TRIP. TRANSMITTER

~~

-SYSTEM ~

207/i6/851321" REQUEST-TO REVISE TECHNICAL SPECIFICATIONS

' ADD-

~

~ SPECIFICATION.AND: TABLE' ADDRESSING-COMPONENT CYCLIC AND TRANSIENT LIMITS

-08/01'/85 321J

[O REQUEST'FOR' TECHNICAL SPECIFICATION. RELIEF - 10. YEAR L

-REQUIREMENTS INSERVICE INSPECTION 08/02/85_3667 REQUEST TO REVISE TECHNICAL-' SPECIFICATIONS,- HYDROGEN

~

1RECOMBINER HEATER-INTEGRITY TEST SPECIFICATION 008/20/8'5'321,366

PROPOSED. SURVEILLANCE TECHNICAL' SPECIFICATIONS FOR' FAST

~ ACTING DAMPERS'FOR PROTECTION OF SGTS~- DOCR.85-15~

08/20/85,.321 0 PROPOSED CHANGES _TO THE TECHNICAL. SPECIFICATIONS FOR HIGH

~

RADIATION ISOLATION OF PURGE AND VENT _ VALVES - DOCR'85-20 108/22/85-5321c

.O' REQUEST FOR APPROVAL _OF ANOTHER CYCLE WITH CORE SPRAY

-SPARGER CLAMP 08/23/85L321,366 O CHANGE TO TECHNICAL' SPECIFICATIONS - DRYWELL PNEUMATIC

. ISOLATION' VALVES

=(DOCR 84-29R1, 85-21)

'08/23/85.321i

!O; PROPOSED CHANGES FOR TECHNICAL SPECIFICATION - ADS' LOG.*C --

DOCR 85-19

' REQUEST TO REVISE TECHNICAL SPECIFICATIONS.-' SCRAM DISCHARGE 09/13/85)321,366

' VOLUME VENT.AND: DRAIN VALVE-CLOSURE TIME

~

709/13/85.321,366

' REQUEST TO REVISE TECENICAL SPECIFICATIONS - SCRAM DISCHARGE VOLUME VENT.AND:DRAIii VALVE CLOSURE TIME

{3 W 4p T%

. >,, -