Text
y, pi fO
" Gecgia Power Company y,ap *.- 333 Piedmont Averme :.
s
' Atlanta, Georgia 30308~,
- Telephone 404 52&6526 Mainng Address:
Post Office Box 4545-Ai!anta, Georgia 30302 Georgia Power L T. Gucwa the southem elecinc system -
- Manager Nuclear Engineenng andchief nucieasom SL-77 1994N l December 10.-1985
' Director of Nuclear Reactor Regulation-
~
~ Attention: =Mr. D. Muller,-Project Director
~BWR-Project Directorate No. 2
-Division _of. Boiling Water. Reactor Licensings U. S.-Nuclear Regulatory Commission
-Washington, D. C.7 20555
' NRC DOCKCTS '50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 c'
EDWIN I. HATCH' NUCLEAR PLANT. UNITS 1,.2
'0UTSTANDING SUBMITTALS-LIST-Gentlemen:
i.;;
- At' achid please find. an updated listing-of. correspondence' with NRR to t
which -a - written response ?is expected.
~ The ~ attachment ' is. tabulated.
chronologically by1 Georgia. PoweriCompany's (GPC) submittal. date.
.GPC ' is.
~ iready.to Jdiscuss-modifications to thisr status report.'and~ will promptly Laddress any questions you might have regarding these licensing issues.
GPClacknowle'dges 'and --appreciates ;.the recent - NRC efforts to complete
' ~
licensing-- action on our submittals - related to the change ini reporting-requirementsL for primary coolant and secondary containmentgleak rates.- We
~
-respectfully request ~your continued efforts to expedite those. priority items
~
submitted in support of the Unit 1 outage, as noted in the attachment.
~
~If'you have further.-questions, please contact this office at any time.-
Very truly yours, L
fr4 =
L. T. Gacwa MJBlackwood/lc
. Attachment
+
c: ' (w):
'Mr. J.~T. Beckham', Jr.
(w):
Mr. H. C.. Nix, ~Jr. -
go'\\
y'
~(w):1
.Dr..J. N. Grace (NRC-Region II)
~
T (w):
-Senior-Resident Inspector i
g,,
' ' "B512240308 851210 t
rw 4==
ao%
g' n
.p.
~
z c
j
~
36.-+%,,
(Pag % No.:
1; 412/10/85:
, OUTSTANDING LICENSINGEISSUES WITH SUBMITTAL AT NRC
?LETTEi.lUNITf rSUBJECT
'eDATE<
.O-APPROVAL ~-.0F ITEM REQUIRED FOR-UPCOMING OUTAGE
-LC ITEM CLOSED SINCE LAST-REPORT-f01/26/77i3211 ILRT-CHANGES "08/30/77L321?
ALLOW USE OF MODIFIED CRANE'TO. LIFT SPENT FUEL CASK j10/03/78!321 CHANGE.PSW, DIESEL REQUIREMENTS TO REFLECT SWING STATUS'OF
[.'-
D/G_IB:
-[03/05/79321]
.~ REMOVE-REFERENCE TO OUTDATED VERSION OF APPENDIX J-
- 09/27/821366-
- BUILDING SETTLEMENT SURVEILLANCE - SUBMIT RESULTS OF-ENGINEERING ANALYSIS y
LO4/15/83!321,366 GENERIC; LETTER:82 REQUIREMENTS FOR EMERGENCY RESPONSE
? CAPABILITY ~
DRYWELL. PURGE AND VENT CHANGES.FOR 18" ISOLATION. VALVES (SEE T
t06/15/83'321,366:
LETTER'. 8-5137 ) -
112/21/8 -321,366'
' REQUIRE [H202~ ANALYZER' CONTINUOUS OPERATION'AFTER LOCA ONLY
~
E04/23/84 366-
ATWS RPT-CLARIFICATIONS E
'i.U9/05/84:366L
- PRIMARY: CONTAINMENT ISOLATION OF, PURGE AND VENT ON HI RAD
[09/12/641321-
~ ' OPERABILITY-DEFINITION
~
!09/19/84'366' E FRACTURE MECHANICS' ANALYSIS PER GENERIC LETTER 81 FEEDWATER NOZZLE (11/09/8.4 321,366
, DIESEL; GENERATOR SPECIFICATIONS
?01/10/85.366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR' COOLANT-SYSTEM STAINLESS STEEL PIPE 201/11/85f321
' PROPOSED CHANGE' TO. TECHNICAL " SPECIFICATIONS - DELETION OF
' DEFINITION OF " CUMULATIVE DOWNTIME" i 01/17/85 321-
.HNP-1. PROPOSED FIRE PROTECTION TECHNICAL SPECIFICATIONS -
'^
MODIFICATION' TO THE NUMBER AND LOCATION OF FIRE DETECTORS 05/06/85.321,366-PROPOSED MODIFICATIONS AND SCHEDULE FOR REACTOR WATER LEVEL
" INSTRUMENTATION IMPROVEMENTS - GENERIC LETTER 84-23 I
tJ05/09/85L366-REQUEST FOR TECHNICAL SPECIFICATION RELIEF - OVERCURRENT
-PROTECTION FOR' CONTAINMENT PENETRATIONS a
a---
=
,x 5.
- lc.
yg y EPh i No; '.
12-
.~
112 10/85
. OUTSTANDING LICENSING-ISSUES WITH SUBMITTAL AT NRC g
N
[LETTERL. UNIT- -
fSUBJEC",
l
~j ffDATE-,
- 05/13/85E321,3666 REQUEST-FORfADDITIONALSINFORMATION - SEISMIC SPECTRA
~
_ BROADENING f05/20/85}321:
~C? CHANGE.TO TECHNICAL ~ SPECIFICATIONS - DELETE REPORTING
-REQUIREMENTS FOR: PRIMARY COOLANT AND SECONDARY CONTAINMENT.
- LEAK RATE-iO6/03/85/321,366
- REQUEST:.FOR' ADDITIONAL INFORMATION GENERIC LETTER 83-28'-
JSALEM EVENT
' SCRAM BREAKER FAILURE
~ 06/25/85 321,366)
TINSERVICE1 TESTING
. INSERVICE-INSPECTION PROGRAMS' UPDATE 1
107/19/85'321,366 O_ SCHEDULE:FOR SUBMITTAL FOR PLAN OF ANTICIPATED TRA'NSIENTS
~ ~
~
~
'WITHOUTESCRAM MODIFICATIONS FOR NON-SAFETY RELATED EQUIPMENT'
.07/24/8513213
'O CHANGE:TO' TECHNICAL' SPECIFICATIONS - ANALOG TRIP. TRANSMITTER
~~
-SYSTEM ~
207/i6/851321" REQUEST-TO REVISE TECHNICAL SPECIFICATIONS
' ADD-
~
~ SPECIFICATION.AND: TABLE' ADDRESSING-COMPONENT CYCLIC AND TRANSIENT LIMITS
-08/01'/85 321J
[O REQUEST'FOR' TECHNICAL SPECIFICATION. RELIEF - 10. YEAR L
-REQUIREMENTS INSERVICE INSPECTION 08/02/85_3667 REQUEST TO REVISE TECHNICAL-' SPECIFICATIONS,- HYDROGEN
~
1RECOMBINER HEATER-INTEGRITY TEST SPECIFICATION 008/20/8'5'321,366
- PROPOSED. SURVEILLANCE TECHNICAL' SPECIFICATIONS FOR' FAST
~ ACTING DAMPERS'FOR PROTECTION OF SGTS~- DOCR.85-15~
- 08/20/85,.321 0 PROPOSED CHANGES _TO THE TECHNICAL. SPECIFICATIONS FOR HIGH
~
RADIATION ISOLATION OF PURGE AND VENT _ VALVES - DOCR'85-20 108/22/85-5321c
.O' REQUEST FOR APPROVAL _OF ANOTHER CYCLE WITH CORE SPRAY
-SPARGER CLAMP 08/23/85L321,366 O CHANGE TO TECHNICAL' SPECIFICATIONS - DRYWELL PNEUMATIC
. ISOLATION' VALVES
=(DOCR 84-29R1, 85-21)
'08/23/85.321i
!O; PROPOSED CHANGES FOR TECHNICAL SPECIFICATION - ADS' LOG.*C --
DOCR 85-19
' REQUEST TO REVISE TECHNICAL SPECIFICATIONS.-' SCRAM DISCHARGE 09/13/85)321,366
' VOLUME VENT.AND: DRAIN VALVE-CLOSURE TIME
~
709/13/85.321,366
' REQUEST TO REVISE TECENICAL SPECIFICATIONS - SCRAM DISCHARGE VOLUME VENT.AND:DRAIii VALVE CLOSURE TIME
{3 W 4p T%
. >,, -