ML20138N092

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/85-17.NRR Requested to Provide Interpretation of Facility Tech Spec Paragraph 2.9 Re Reporting of Circulator Trips
ML20138N092
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/31/1985
From: Martin L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20138N096 List:
References
NUDOCS 8511050061
Download: ML20138N092 (2)


See also: IR 05000267/1985017

Text

..

,-

,

OCT 311985

In Reply Refer To:

Docket: 50-267/85-17

Public Service Company of Colorado

ATTN:

0. R. Lee, Vice President

Electric Production

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

Thank you for your letter of October 16, 1985, in response to our letter and

Notice of Violation dated September 16, 1985. We have reviewed your reply and

find it responsive to the concerns raised in our Notice of Violation. We also

understand your question concerning interpretation of the applicability of

10 CFR 50.72 and 10 CFR 50.73 to single plant protection system actuations.

By separate correspondence we have requested NRR to provide an interpretation

of your Technical Specifications, paragraph 2.9, with regard to reporting of

circulator trips. Until such an interpretation is received, the reporting

-requirements must be literally followed.

Your letter also discussed the reportability of the RWP system, making the

point that these should be considered in the same manner as circulator trips.

RWPs were not a part of the violation. Additionally, it was our understanding

that you were ' reviewing the trip points for the RWP system and were

considering whether these could be modified to preclude excess actuation.

Since the RWP system serves to preclude excess reactivity addition rates, we

do not consider them to be the same as the single circulator trips.

They

should be reported.

"U Minal Signed By:

L E. MARTIN

L. E. Martin, Acting Chief

Reactor Projects Branch

cc:

J. W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Station

16805 WCR 191

Platteville, Colorado 80651

L. Singleton, Manager, Quality

Assurance Division

(sameaddress)

color

i Radiation Control Program Director

i

RIV:Rf

A

RPB

JPJauco fik

LEM

l0/p/85

/v/.F/85

MA' iB8ea Bu8l2h7

6g

a

$Q

.

_ _- .

_

__.

__ _

'

'

.

.

Public Service Company of Colorado

-2-

bcc to DMB (IE01)

bec distrib. by RIV:

RPB

R. P. Denise, DRSP

Resident Inspector

R. D. Martin, RA

SectionChief(RPB/A)

RSB

Section Chief (RSB/ES)

R&SPB

RSTS Operator

RIV File

K. Heitner, NRR

E. Butcher, NRR

,

'l

i

a

-

--

,

. . . - ,

_

. + , _

, , . . ,

, , , - + . . - + , - - - . - - , - - - .

-