ML20138N080
| ML20138N080 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/10/1985 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| References | |
| NUDOCS 8512230351 | |
| Download: ML20138N080 (4) | |
Text
'
I iwk
(!
DEC 1 o 1%5 Georgia Power Company J TN:
Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- V0GTLE FACILITY - DOCKET N05. 50-424 This refers to the management meeting conducted at your request in the NRC Region II Office on November 25, 1985. This meeting was held to brief the NRC on the Vogtle Readiness Review Module entitled " Structural Steel" and the two appendices entitled " Document Control" and " Material Control."
It is our opinion that this meeting was beneficial and provided a comprehensive overview of the Vogtle Readiness Review Program and, specifically, the module and appendices presented. This in-depth presentation will better enable the NRC to conduct its evaluation of these documents.
With respect to your proposal regarding a program review of the Vogtle Readiness Review Pilot Program, we concur that such a review would be beneficial. We will contact you in the near future to schedule this meeting and to develop a mutually agreeable agenda.
In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning these matters, we will be pleased to discuss them.
Sincerely, sl
)\\. Yn J. Nelson Grace Regional Administrator
Enclosure:
List of Attendees cc w/ encl:
(See page 2) 8512230351 851210 PDR ADOCK 05000424 A
~
TEdh
U t.
2 DEC 101985
. Georgia Power' Company _
e cciw/ encl:
g E. Conway, Senior Vice President /
Project Director
( 0. Foster, Vice President - Project
)/ Support v4. C. Ramsey, Manager-- Readiness Review gG'. Bockhold,' Jr., Vogtle Plant Manager
- T.'Gucwa, Chief Nuclear Engineer.
JubleA. Thomas,-
Vice President-Licensing Vcgtle Project g d Groover, Quality Assurance Site Manager g W. Hayes, QA Manager g&GeneralManager-Operations T. Beckham, Vice President
. / A. Bailey, Project Licensing Manager v seorge F. Trowbridge, Esq.
,Shaw, Pittman, Potts and Trowbridge Aruce'W. Churchill,-Esq.
,Shaw, Pittman, Potts and Trowbridge
. frnest L. Blake, Jr., Esq.
Shaw, Pittman, Potts and Trowbridge.
/J$mes E. Jciner, Troutman, Sanders, Lockerman and Ashmore vJames G. Ledbetter, Commissioner Department of Human Resources
/CharlesH. Badger,Officeof Planning and Budget, Management eview Division eppish Kirkland, III, Counsel-Office of.the~ Consumer's Utility
. Council p 0'ouglas C. Teper, Georgians Against Nuclear Energy
.haurieFowler,LegalEnvironmental f-Assistance Foundation VTim Johnson, Executive Director l-Educational Campaign for a Prosperous Georgia cc w/ encl:
(Cont'd on page 3)
I k
f!
ti y
- Geor~ia' Power Company-
'3
' DEC 101985 g
cc w/ enc 1:
P ton B. Margulies, Esq.,-Chairman V Administrative Judge, Atomic Safety jand Licensing Board Panel
.. Dr. 0 scar H. Paris, Administrative Judge gf Atomic Safety and Licensing Board Panel
?,/ ustave' A. Linenberger, Jr., Administrative G
Judge, Atomic Safety and-Licensing Board Panel Billie P.-Garde,-Citizens Clinic
.y, ' ? Director, Government Accountability Project-
__ bec w/ enc 1:
-(,M~' Miller,NRR
.M.
Sinkule, RII M.Rankin,RII W
Resident Inspector-Document Control Desk
. State of Georgia i
e
.,p.-
RII RII RII RII RII M8)
O h
WRankin:jk MSinkuM VBrdw'nlee RWalker J01 h nski 12/4 /85 12/[., /85 12/y?/85 12/o /85 12 q /85
W DEC 1 n1985 ENCLOSURE LIST OF ATTENDEES NOVEMBER 25, 1985 U. S. Nuclear Regulatory Commission
~ R. D. Walker, Director, Division of Reactor Projects (DRP)
)4.'F. Gibson, Director, Division of Reactor Safety (DRS)
'A. R. Herdt, Chief, Engineering Branch, DRS C.:A.:Julian, Acting Chief, Operations Branch,.DRS M.' V. Sinkule, Chief, Reactor' Projects Section (RPS) 20, DRP
- J.cJ. Blake, Chief, Materials and Processes Section, DRS
- G. A. Belisle, Acting Chief, Quality Assurance Programs Section, DRS R. M. Latta, Reactor Inspector, DRS W. H.:Rankin, Acting Project Engineer, RPS 2D, DRP R.-J Schepens, Resident Inspector, DRP W. M. Hill, Senior Quality Assurance Specialist, IE R..W. Parkhill, Inspector Specialist, IE Tr. S.- Michaels, Vogtle Readiness Review Project Manager, NRR S. P. Chan,- Structural Engineer, NRR
.G. K. Miller, Consultant, EG&G, Inc.
L C. G. Bruch, Consultant, EG&G, Inc.
~ Georgia Power Company D. 0.1 Foster,.Vice President - Project Support W.fC. Ramsey,. Manager, Readiness Review (RR)
R. McManus, Construction Discipline Manager, RR
~A.-Nakashima, Appendices Discipline. Manager, RR W. M. Wright, Design Discipline Manager, RR-J. J._Curtin, Consultant, Stone and Webster M. R. Thakar, Team Leader, RR I
__