ML20138M750

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/85-28 & 50-366/85-28 on 850923-28.No Violation Noted.W/O Repts
ML20138M750
Person / Time
Site: Hatch  
Issue date: 10/16/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8511040305
Download: ML20138M750 (2)


See also: IR 05000321/1985028

Text

..

-

.

. .__

.

-

-

.

.--

. . .

.-

.-

=.=.

.

t//pJ

'

-

OCT 161985

Georgia Power Company

-

/ ATTN: Mr. R. J. Kelly

,

i

Executive Vice President

i

P. O. Box 4545

Atlanta, GA 30302

'

4

Gentlemen:

4

SUBJECT:

REPORT NOS. 50-321/85-28 AND 50-366/85-28

i

On September 23-27, 1985, NRC inspected activities authorized by NRC License

Nos. DPR-57 and NPF-5. for your Hatch facility.

At the conclusion of the

i

inspection, the findings were discussed with those members of your staff

i

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

.

in progress.

!

Within the scope of the inspection, no violations or deviations were identified.

i

Should you have any questions concerning this letter, please contact us.

Sincerely,

,

.

s

e

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

.

Enclosure:

2

Inspection Report Nos. 50-321/85-28

i

l

and 50-366/85-28

w/ encl:

!

'

. T. Beckham, Vice President and

i

General Manager-Nuclear Operation

'

. C. Nix, Site General Manager

P. E. Fornel, Site QA Supervisor

. Gucwa, Chief, Nuclear Engineer

,

bcc w/ encl:

(See page 2)

,

i

8511040305 851016

PDR

ADOCK 05000321

G

PDR

,

N

_c o t

I

e

,

L

2

.

.

Georgia Power Company

2

OCT 161985

bec w/ encl:

"NRC Resident Inspector

edugh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

RII

-'

RII

-

R

,

P ad' n:lb

TConlo

derdt

VP iera

10/0/85

10/l)/85

10 l%5

10/7/85

7

/

/

l

l