ML20138M552
| ML20138M552 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/16/1985 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20138M557 | List: |
| References | |
| NUDOCS 8512230025 | |
| Download: ML20138M552 (2) | |
See also: IR 05000456/1985053
Text
T1 % r5
1
.
.
,
-
'DEC 1 6 $85-
Docket No. 50-456
Docket'No. 50-457
Commonwealth Edison-Company
ATTN:
-Mr. Cordell Reed
Vice' President
Post Office Box-767
Chicago, IL 60690
' Gentlemen:
This-refers to the routine' safety inspection conducted by Messrs. T. M. Tongue,
'
M.' J. Farber, W. J. Kropp, and C. B Ramsey of this office during the period of
November 2 through November 30, 1985, of activities at the Braidwood Station,
Units-1 and 2, authorized by NRC Construction Permits No. CPPR-132 and
No. CPPR-133 and to the discussion of our findings with Mr. C. Schroeder and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews.with personnel.
No: violations of NRC requirements were identified during the course of this
. inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter, the enclosures, and your response to this letter be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'
" ' M by ll.~S.'Little
W. S. Little, Director
Braidwood Project
Enclosure:
Inspection Reports
No. 50-456/85053(DRP);
No. 50-457/85051(DRP)
'See Attacbed Distribution
.
8512230025 85121
ADOCK 0500
4
G
\\
Mc}
E
'
',
.
.-
' Commonwealth Edison Company
2
DEC 1 6 085'
~
-Distribution
cc w/ enclosure:
D. L.'Farrar, Director
of Nuclear Licensing-
M.DWallace, Project Manager
- ~
D. Shan611n, Construction
Superintendent
.E. E. Fitzpatrick, Plant Manager
C.'W. Schroeder, Licensing and
- Compliance Superintendent
DCS/RSB (RIDS)
.
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office Environmental
Control Division
'O. W. Cassel, Jr., Esq.
J. W.~McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division--
E. Chan, ELD
<
J. Moore, ELD
'
G.. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
.
The Honorable A. Dixon Callihan,.ASLB
The Honorable Richard F.' Cole, ASLB
f
h
W
'
Fil te/1s
- arber
Li ule
(,ulhr
I/
l$[
12/11/85
fpp
g.
J
P
.