Summarizes 850820 Mgt Meeting W/Util in Atlanta,Ga Re Current QC Initiatives W/Emphasis on Electrical Const. Initiatives Will Result in Improved Const Quality.List of Meeting Participants Encl
ML20138M533
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/10/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8511040080
Download: ML20138M533 (4)


Text

.

(s) j o

~v QO\/ 'O AA SEP 10 W Georgia Power Company l/ ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 7

Gentlemen:

SUBJECT:

MEETING

SUMMARY

- V0GTLE FACILITY - DOCKET NOS. 50-424 AND 50-425 This refers to the management meeting conducted at the request of Mr. D. O. Foster, Vice President and General Manager, Vogtle Project, in the NRC Region II Office on August 20, 1985. This meeting was held to brief the NRC on current quality control initiatives with emphasis in the electrical construction area.

It is our opinion that this meeting was beneficial and provided a comprehensive overview of the significant changes that have occurred within the Vogtle Quality Control (QC) Organization in recent months with a view toward improvement of the overall quality control profile in the plant. It is our opinion that the pro-grams that you have established in the plant to respond to identified concerns will greatly enhance your ability to control overall electrical construction quality. Of particular interest to us were improvements that have been realized since your initial presentation to us on this subject on May 16, 1985. As you reported these include upgrades in quality procedures and checklists, reduction in the number of insignificant deficiencies reported, and favorable trends with respect to the numbers and nature of quality concerns reported.

All of these initiatives will result, we believe, in improved construction quality if sustained in a consistent and focused manner throughout the remaining construction period.

Based on our review of the data presented at this meeting, as well as our consideration of other information on this issue available to us, it is our intention to continue to follow up your progress in this area through our routine inspection program at this time.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning these matters, we will be pleased to discuss them.

Sincerely, 8511040 PDR AD g h h 24 ORIGWAL WED Bh PDR j. NELSON GRQ A

J. Nelson Grace

! Regional Administrator

Enclosure:

(See page 2) zus %

Georgia Power Company 2 SEP1o me

Enclosure:

List of Principal Participants cp w/ encl:

tR. E. Conway, Senior Vice President Nuclear Power vd. O. Foster, Vice President and General Manager Vogtle Project

f. H. Gregory, III, General Manager, Vogtle Nuclear Construction J. Bockhold, Jr. , Vogtle Plant Manager vi' . T. Gucwa, Chief Nuclear Engineer dubleA. Thomas, Vice President-Licensing Vogtle Project ddGroover, Quality Assurance Site Manager
d. W. Hayes, QA Manager J. T. Beckham, Vice President

& General Manager - Operations

/J. A. Bailey, Project Licensing Manager MGeorge F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge f ruce W. Churchill, Esq.

Shaw, Pittman, Potts and irowbridge Jrnest L. Blake, Jr. , Esq.

Shaw, Pittman, Potts and Trowbridge ,,

James E. Joiner, Troutman, Sanders, Lockerman and Ashmore gamesG.Ledbetter, Commissioner Department of Human Resources J harles H. Badger, Office of Planning and Budget, Management Review Division v0eppish Kirkland, III, Counsel Office of the Consumer's Utility Council vbouglasC.Teper,GeorgiansAgainst Nuclear Energy daurie Fowler, Legal Environmental Assistance Foundation t/ Tim Johnson, Executive Director Educational Campaign for a Prosperous Georgia cc w/ encl: (Cont'd on page 3)

Georgia Power Company 3 SEP 101985 cc w/ encl:

/Morton B. Margulies, Esq., Chairman Administrative Judge, Atomic Safety and Licensing Board Panel

/)r. Oscar H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel Justave A. Linenberger, Jr. , Administrative Judge, Atomic Safety and Licensing Board Panel bcc w/ enc 1:

M. Miller, NRR M. Sinkule, RII W. Rankin, RII NRC Resident Inspector Document Control Desk State of Georgia 9 RII RII RII RII kin:ps 4

MSinkule 6

VBrownlee T d'l ion b

RWaIler 9/1k /85 9/$ /85 9/(t /85 9/p/85 9/O /85 l I J01s j i ki 9/(/85 l

l l

d SEP 101986 ENCLOSURE LIST OF PRINCIPAL PARTICIPANTS V0GTLE ELECTRICAL QUALITY CONCERNS MEETING AUGUST 20, 1985 Georgia Power Company P. D. Rice, Vice President and General Manager / Quality Assurance B. C. Harbin, Manager of Quality Control C. W. Hayes, Vogtle Quality Assurance Manager J. R. Downs, Electrical Section Supervisor W. C. Ramsey, Readiness Review Program Manager S. Pietrzyk, Bechtel Assistant Project Engineer - Electrical D. Read, Deputy General Manager - Quality Assurance A. W. Harrelson, Assistant to Project Vice President NRC-Region II i V. L. Brownlee, Chief, Reactor Projects Branch 2, Division of Reactor Projects i (DRP)

M. V. Sinkule, Chief, Reactor Projects Section 20, DRP W. H. Rankin, Acting Project Engineer, DRP

] T. E. Conlon, Chief, Plant Systems Section, Division of Reactor Safety (DRS) i M. D. Hunt, Reactor Inspector, Plant Systems Section, DRS R. J. Schepens, Resident Inspector, Vogtle

! J. F. Rogge, Senior Resident Inspector, Vogtle l

- . _. . _ . _ _ - _ - _ _ . . . _ . _ . __.-__ , , _ _ _ _ _